Meeting 6/23/22 - COMTRA

From Ciswikidb
Revision as of 08:27, 23 June 2022 by Grames (talk | contribs) (Created page with "6/23/22 Minutes ;ME - BNL/JLAB stand solution, Collimator * Stand update ... * Collimator ... we cannot find it, will need to make from existing stock, Greg will tell us the...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

6/23/22 Minutes

ME - BNL/JLAB stand solution, Collimator
  • Stand update ...
  • Collimator ... we cannot find it, will need to make from existing stock, Greg will tell us the ID
Magnet - Steel fab and first winding
Detector - BGO shipment, box fab, PMT status
  • BGO - DHL notice yesterday, should arrive in Richmond 6/28 from Germany
  • Box in fabrication. It is likely that we will assemble them at IJCLab and send them mounted to JLab, This should save a bit of time.
  • Components for the PMT bases have been ordered.
  • PMT order status ...
DAQ - ItoV decision
What else?
  • NIM paper - Riad's good idea - some of us will draft an outline in overleaf, later we'll look for short technical descriptions/results,
  • Manual - More of an operational document to augment NIM paper technical description