Meeting 6/23/22 - COMTRA
From Ciswikidb
Revision as of 07:27, 23 June 2022 by Grames (Talk | contribs) (Created page with "6/23/22 Minutes ;ME - BNL/JLAB stand solution, Collimator * Stand update ... * Collimator ... we cannot find it, will need to make from existing stock, Greg will tell us the...")
6/23/22 Minutes
- ME - BNL/JLAB stand solution, Collimator
- Stand update ...
- Collimator ... we cannot find it, will need to make from existing stock, Greg will tell us the ID
- Magnet - Steel fab and first winding
- Detector - BGO shipment, box fab, PMT status
- BGO - DHL notice yesterday, should arrive in Richmond 6/28 from Germany
- Box in fabrication. It is likely that we will assemble them at IJCLab and send them mounted to JLab, This should save a bit of time.
- Components for the PMT bases have been ordered.
- PMT order status ...
- DAQ - ItoV decision
- What else?
- NIM paper - Riad's good idea - some of us will draft an outline in overleaf, later we'll look for short technical descriptions/results,
- Manual - More of an operational document to augment NIM paper technical description