Meeting 6/23/22 - COMTRA

From Ciswikidb
Revision as of 08:27, 23 June 2022 by Grames (talk | contribs) (Created page with "6/23/22 Minutes ;ME - BNL/JLAB stand solution, Collimator * Stand update ... * Collimator ... we cannot find it, will need to make from existing stock, Greg will tell us the...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

6/23/22 Minutes

ME - BNL/JLAB stand solution, Collimator
  • Stand update ...
  • Collimator ... we cannot find it, will need to make from existing stock, Greg will tell us the ID
Magnet - Steel fab and first winding
Detector - BGO shipment, box fab, PMT status
  • BGO - DHL notice yesterday, should arrive in Richmond 6/28 from Germany
  • Box in fabrication. It is likely that we will assemble them at IJCLab and send them mounted to JLab, This should save a bit of time.
  • Components for the PMT bases have been ordered.
  • PMT order status ...
DAQ - ItoV decision
What else?
  • NIM paper - Riad's good idea - some of us will draft an outline in overleaf, later we'll look for short technical descriptions/results,
  • Manual - More of an operational document to augment NIM paper technical description