Difference between revisions of "Meeting 6/29/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "6/23/22 Minutes ;ME * Stands - Last week we said 'pull the trigger' on UITF stand (has been purchased?), later will order stand for BNL * Collimator - Last week Riad provided...")
 
Line 12: Line 12:
 
;Detector
 
;Detector
 
* BGO crystals - Arrived in Richmond, Deringer controls paperwork, 6/28 proceeding for ground DHL to JLab date
 
* BGO crystals - Arrived in Richmond, Deringer controls paperwork, 6/28 proceeding for ground DHL to JLab date
* PMT status?
+
* PMT status - (4) Hamamatsu tubes w/ magnetic shield, PR 6/1, PO 6/2, due 8/2 or earlier => https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412467
 
* PMT base status?
 
* PMT base status?
 
* Detector box status?
 
* Detector box status?

Revision as of 09:47, 29 June 2022

6/23/22 Minutes

ME
  • Stands - Last week we said 'pull the trigger' on UITF stand (has been purchased?), later will order stand for BNL
  • Collimator - Last week Riad provided drawing, found material but does not know if OHFC. Need (2) per this drawing. What about ID hole??? media:JL0015777_Cu_collimator.pdf
  • Absorbers -
Analyzing Magnet
Detector
  • BGO crystals - Arrived in Richmond, Deringer controls paperwork, 6/28 proceeding for ground DHL to JLab date
  • PMT status - (4) Hamamatsu tubes w/ magnetic shield, PR 6/1, PO 6/2, due 8/2 or earlier => https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412467
  • PMT base status?
  • Detector box status?
DAQ
  • PMT-5R ItoV amplifier with remote control - 6/23 CC order placed to Advanced Instruments Corp, delivery date TBD
What else?
  • NIM paper - Riad's good idea - some of us will draft an outline in overleaf, later we'll look for short technical descriptions/results,
  • Manual - More of an operational document to augment NIM paper technical description