Difference between revisions of "Meeting 6/29/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
Line 2: Line 2:
  
 
;ME
 
;ME
* Stands - Last week we said 'pull the trigger' on UITF stand (has been purchased?), later will order stand for BNL
+
* Stands - Last week we said 'pull the trigger' on UITF stand (has been purchased?), later will order stand for BNL => '''Where is PR?'''
 
* Collimator - Last week Riad provided drawing, found material but does not know if OHFC.  Need (2) per this drawing.  [[media:JL0015777_Cu_collimator.pdf]]  '''What about ID hole???'''  
 
* Collimator - Last week Riad provided drawing, found material but does not know if OHFC.  Need (2) per this drawing.  [[media:JL0015777_Cu_collimator.pdf]]  '''What about ID hole???'''  
 
* Absorbers - Christine provided drawing 6/3, I forgot to act on this!  Need (6) per this drawing => [[media:Absorber - 240 D 001 14_V4.pdf]]
 
* Absorbers - Christine provided drawing 6/3, I forgot to act on this!  Need (6) per this drawing => [[media:Absorber - 240 D 001 14_V4.pdf]]

Revision as of 10:00, 29 June 2022

6/29/22 Updates...

ME
  • Stands - Last week we said 'pull the trigger' on UITF stand (has been purchased?), later will order stand for BNL => Where is PR?
  • Collimator - Last week Riad provided drawing, found material but does not know if OHFC. Need (2) per this drawing. media:JL0015777_Cu_collimator.pdf What about ID hole???
  • Absorbers - Christine provided drawing 6/3, I forgot to act on this! Need (6) per this drawing => media:Absorber - 240 D 001 14_V4.pdf
Analyzing Magnet
Detector
  • BGO crystals - Arrived in Richmond, Deringer controls paperwork, 6/28 proceeding for ground DHL to JLab date
  • PMT status - (4) Hamamatsu tubes w/ magnetic shield, PR 6/1, PO 6/2, due 8/2 or earlier => https://misportal.jlab.org/reqs/pr/viewPr.do?prNum=412467
  • PMT base status?
  • Detector box status?
DAQ
  • PMT-5R ItoV amplifier with remote control - 6/23 CC order placed to Advanced Instruments Corp, delivery date TBD
What else?
  • NIM paper - Riad's good idea - some of us will draft an outline in overleaf, later we'll look for short technical descriptions/results,
  • Manual - More of an operational document to augment NIM paper technical description