Difference between revisions of "Meeting 8/4/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
Line 8: Line 8:
  
 
===DAQ ===
 
===DAQ ===
* PMT-5R ItoV amplifier (due TBD)
+
* PMT-5R ItoV ''(arrived)'''
* To-do => final cable, connector, rack layout
+
* Cable pull from UITF control room to cave
  
 
===Detector===
 
===Detector===

Revision as of 20:37, 3 August 2022

Thursday's @ 9am EDT by Zoom

Magnet

DAQ

  • PMT-5R ItoV (arrived)'
  • Cable pull from UITF control room to cave

Detector

  • BGO crystals - Arrived at JLab, stored in cabinet
  • PMTs (arrived 8/2)
  • PMT bases (due 8/1-9/15)
  • Detector boxes (shipped, DHL estimate 8/9)

Layout

Geant4 Model

Documentation