Difference between revisions of "Meeting 9/21/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
 
* Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09
 
* Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09
 
* Zoom ID: 160 190 6056 and Passcode: 992019
 
* Zoom ID: 160 190 6056 and Passcode: 992019
 +
 +
== Experiment Time!!! ==
 +
* UITF logbook => https://logbooks.jlab.org/book/uitflog
 +
* [[UITF  Compton Transmission Polarimeter Data Acquisition System]]
 +
* Quick Reference v.16 [[media:UITF_quick_reference_rev.16.pdf]]
 +
* UED List Version 4 [[media:comptra_beamline_v4.xlsx]]
 +
* Run Plan Version 5 [[media:COMTRA-RunPlan-v5.xlsx]]
 +
* [[UITF Fall 2022 Schedule]]
 +
* Steps to align x-ray beam [[media:220920_Table_Steps.pptx]]
 +
* Recent installation photos with UED names [[media:220914_COMTRA.pptx]]
  
 
== Readiness Updates ==
 
== Readiness Updates ==
 
* Tour of installation so far [[media:220914_COMTRA.pptx]]
 
 
 
* ME/Layout
 
* ME/Layout
** Mike/Eric completed quick reference => ME can use to populate songsheet
+
** Mike/Eric completed quick reference (done, see above)
 +
** Songsheet => use quick reference above
 
** Matt working with SCMB & RadCon (100 nA shielded hut, 25 nA unshielded hut)
 
** Matt working with SCMB & RadCon (100 nA shielded hut, 25 nA unshielded hut)
  
 
* Experiment components
 
* Experiment components
** collimator installed and aligned =>
+
** collimator installed and aligned => see above
** magnet measurement, status for install
+
** magnet measurement => status...
 
** detector assembly, fiducialization => walkthrough completed wit
 
** detector assembly, fiducialization => walkthrough completed wit
  
Line 22: Line 30:
 
** Pull 6 fibers from DAQ to mezzanine => not yet
 
** Pull 6 fibers from DAQ to mezzanine => not yet
 
** Align x-ray camera for x-ray card after collimator => ?
 
** Align x-ray camera for x-ray card after collimator => ?
** Insertable 1/2-waveplate
+
** Insertable 1/2-waveplate => Shukui needs help
 
** pull Heliax to gun rack => done, cable #10
 
** pull Heliax to gun rack => done, cable #10
  
Line 30: Line 38:
 
** EFADC/DAQ
 
** EFADC/DAQ
 
** Kepco PS
 
** Kepco PS
 
* Experiment sequence
 
** Pre-Beam - complete HCO, magnet ready, assembly detector ready, fiducial them, mock-up install ?, remove temporarily
 
** Commission - setup beam to FCUP, APERTURE, DUMP and use x-ray card to define orbit to collimator
 
** Experiment - install/align magnet/detector (w/ attenuators?), deliver x-rays, optimize DAQ, measure asymmetry vs. XYZ and with Wien
 
 
  
 
== Older Links==
 
== Older Links==

Latest revision as of 21:02, 21 September 2022

Thursday's @ 9am EDT by Zoom

Experiment Time!!!

Readiness Updates

  • ME/Layout
    • Mike/Eric completed quick reference (done, see above)
    • Songsheet => use quick reference above
    • Matt working with SCMB & RadCon (100 nA shielded hut, 25 nA unshielded hut)
  • Experiment components
    • collimator installed and aligned => see above
    • magnet measurement => status...
    • detector assembly, fiducialization => walkthrough completed wit
  • I&C jobs
    • Remote motion control for aperture (otherwise do by hand w/ access) => done
    • Attach current monitors to aperture and dump => done
    • Plumb LCW for current monitor and dump => done 0.75 gpm, SSG update FSD text
    • Pull 6 fibers from DAQ to mezzanine => not yet
    • Align x-ray camera for x-ray card after collimator => ?
    • Insertable 1/2-waveplate => Shukui needs help
    • pull Heliax to gun rack => done, cable #10
  • DAQ/Controls
    • Helicity generator
    • High Voltage
    • EFADC/DAQ
    • Kepco PS

Older Links