Difference between revisions of "Meeting 9/8/22 - COMTRA"

From Ciswikidb
Jump to navigation Jump to search
(Created page with ";Thursday's @ 9am EDT by Zoom * Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09 * Zoom ID: 160 190 6056 and Passcode: 992...")
 
Line 8: Line 8:
  
 
== Readiness Updates ==
 
== Readiness Updates ==
* Vacuum components/shielding
+
* Vacuum component layout/shielding
 +
** Updated ME model w/ dimensions (collimator length, insertable aperture, stand points)
 +
** Vacuum assembly later today (add aperture, spool, reducer, ceramic, dump)
 +
** Schedule S&A as-found
 +
 
 
* Detector table/shielding
 
* Detector table/shielding
** Lead layer drawings
+
** Waiting on table top, then rails/posts assembly
** Detector Triax (4) and SHV (2) => pulled and hanging near dump
+
** Drawings for lead hut assembly
 +
 
 +
* Detector status
 +
** Detector Triax (4) and SHV (2) => cables pulled and hanging near dump
 
** DAQ status/readiness
 
** DAQ status/readiness
 
** Assemble BGO/PMT into detector chassis
 
** Assemble BGO/PMT into detector chassis
** install/instrument collimator + magnet + detector, then rough alignment for check out
+
 
** Prepare for commissioning (collimator, x-ray card, camera), but not magnet nor detector box
 
 
* Magnet
 
* Magnet
 
** Magnet PS cables => pulled to power load on wall
 
** Magnet PS cables => pulled to power load on wall
 
** Rack/magnet ground cable => bounded to braid near dump
 
** Rack/magnet ground cable => bounded to braid near dump
 +
 
* Current monitoring
 
* Current monitoring
 
** Faraday cups current monitor => Ganged with FCUP
 
** Faraday cups current monitor => Ganged with FCUP
 
** A5 current monitor => 7mm aperture, requires I&C controls (Windham next week)
 
** A5 current monitor => 7mm aperture, requires I&C controls (Windham next week)
 
** A6 current monitor => Radiator
 
** A6 current monitor => Radiator
 +
 
* Position/Size
 
* Position/Size
 
** Harp installed upstream of dump
 
** Harp installed upstream of dump
Line 28: Line 36:
 
** Beam line viewer => Matt repaired, requires camera alignment
 
** Beam line viewer => Matt repaired, requires camera alignment
 
** X-ray viewer => Joe relocated to look at detector hut, requires X-ray card
 
** X-ray viewer => Joe relocated to look at detector hut, requires X-ray card
* Alignment
 
** As-founds
 
  
* Greg's to-do's
+
* SImulations
 
** compute integrated asymmetry
 
** compute integrated asymmetry
 
** use slurm to run jobs on farm
 
** use slurm to run jobs on farm

Revision as of 20:16, 7 September 2022

Thursday's @ 9am EDT by Zoom

New UITFList entries

Readiness Updates

  • Vacuum component layout/shielding
    • Updated ME model w/ dimensions (collimator length, insertable aperture, stand points)
    • Vacuum assembly later today (add aperture, spool, reducer, ceramic, dump)
    • Schedule S&A as-found
  • Detector table/shielding
    • Waiting on table top, then rails/posts assembly
    • Drawings for lead hut assembly
  • Detector status
    • Detector Triax (4) and SHV (2) => cables pulled and hanging near dump
    • DAQ status/readiness
    • Assemble BGO/PMT into detector chassis
  • Magnet
    • Magnet PS cables => pulled to power load on wall
    • Rack/magnet ground cable => bounded to braid near dump
  • Current monitoring
    • Faraday cups current monitor => Ganged with FCUP
    • A5 current monitor => 7mm aperture, requires I&C controls (Windham next week)
    • A6 current monitor => Radiator
  • Position/Size
    • Harp installed upstream of dump
    • BPM installed upstream of dump
    • Beam line viewer => Matt repaired, requires camera alignment
    • X-ray viewer => Joe relocated to look at detector hut, requires X-ray card
  • SImulations
    • compute integrated asymmetry
    • use slurm to run jobs on farm
    • simulate 5 configurations

DAQ

Beamline

Magnet

Detector

Geant4 Model

Action Items

Documentation