Meeting 9/8/22 - COMTRA

From Ciswikidb
Revision as of 20:09, 7 September 2022 by Grames (talk | contribs) (Created page with ";Thursday's @ 9am EDT by Zoom * Join ZoomGov Meeting - https://jlab-org.zoomgov.com/j/1601906056?pwd=V2xxUjJhQWN3RC91M2ZBOUVrbmhnUT09 * Zoom ID: 160 190 6056 and Passcode: 992...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Thursday's @ 9am EDT by Zoom

New UITFList entries

Readiness Updates

  • Vacuum components/shielding
  • Detector table/shielding
    • Lead layer drawings
    • Detector Triax (4) and SHV (2) => pulled and hanging near dump
    • DAQ status/readiness
    • Assemble BGO/PMT into detector chassis
    • install/instrument collimator + magnet + detector, then rough alignment for check out
    • Prepare for commissioning (collimator, x-ray card, camera), but not magnet nor detector box
  • Magnet
    • Magnet PS cables => pulled to power load on wall
    • Rack/magnet ground cable => bounded to braid near dump
  • Current monitoring
    • Faraday cups current monitor => Ganged with FCUP
    • A5 current monitor => 7mm aperture, requires I&C controls (Windham next week)
    • A6 current monitor => Radiator
  • Position/Size
    • Harp installed upstream of dump
    • BPM installed upstream of dump
    • Beam line viewer => Matt repaired, requires camera alignment
    • X-ray viewer => Joe relocated to look at detector hut, requires X-ray card
  • Alignment
    • As-founds
  • Greg's to-do's
    • compute integrated asymmetry
    • use slurm to run jobs on farm
    • simulate 5 configurations

DAQ

Beamline

Magnet

Detector

Geant4 Model

Action Items

Documentation