Difference between revisions of "Mott Run 2 Journal"

From Ciswikidb
Jump to navigation Jump to search
Line 6: Line 6:
  
 
== Saturday, October 24 OWL (Daniel, Riad) ==
 
== Saturday, October 24 OWL (Daniel, Riad) ==
Beam was restored after bypass SL klystron.  Clean launch set to Mott, veto timing adjusted (DAQ or RF trigger drift?), PITA adjustments made (orbit/transmission change since last calibration?), vertical polarization set and total rate vs. thickness [https://logbooks.jlab.org/entry/3355942 measured].  Detailed shift summary  [https://logbooks.jlab.org/entry/3355967 here.]
+
Beam was restored after bypass SL klystron.  Clean launch set to Mott, veto timing adjusted (DAQ or RF trigger drift?), PITA settings to null charge asymmetry [https://logbooks.jlab.org/entry/3355890 corrected] (orbit/transmission change since last calibration?), vertical polarization set and total rate vs. thickness [https://logbooks.jlab.org/entry/3355942 measured].  Detailed shift summary  [https://logbooks.jlab.org/entry/3355967 here.]
  
 
== Saturday, October 24 DAY  (Marty, Joe) ==
 
== Saturday, October 24 DAY  (Marty, Joe) ==

Revision as of 09:15, 24 October 2015


Friday, October 23 DAY (Matt, Joe)

Friday, October 23 SWING (Tim, Marcy)

Saturday, October 24 OWL (Daniel, Riad)

Beam was restored after bypass SL klystron. Clean launch set to Mott, veto timing adjusted (DAQ or RF trigger drift?), PITA settings to null charge asymmetry corrected (orbit/transmission change since last calibration?), vertical polarization set and total rate vs. thickness measured. Detailed shift summary here.

Saturday, October 24 DAY (Marty, Joe)