Mott Run 2 Journal

From Ciswikidb
Revision as of 09:12, 24 October 2015 by Grames (talk | contribs)
Jump to navigation Jump to search


Friday, October 23 DAY (Matt, Joe)

Friday, October 23 SWING (Tim, Marcy)

Saturday, October 24 OWL (Daniel, Riad)

Beam was restored after bypass SL klystron. Clean launch set to Mott, veto timing adjusted (DAQ or RF trigger drift?), PITA adjustments made (orbit/transmission change since last calibration?), vertical polarization set and elastic rates measured. Detailed shift summary here.

Saturday, October 24 DAY (Marty, Joe)