Difference between revisions of "NEG coated 2.5 inch OD BPM's"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
New BPM's were developed for the 200 kV gun NEG tube beam line.
+
200 KV BPM's with NEG coating
  
 
== ME Design ==
 
== ME Design ==
*weldment [[media:JL0091130-0114 BPM TUBE WELDMENT, REV-.pdf]]
+
* can weldment [[media:JL0091130-0114 BPM TUBE WELDMENT, REV-.pdf]]
 +
* final assembly drawing coming from danny
  
 
== Assembly Sequence ==
 
== Assembly Sequence ==
Line 18: Line 19:
 
== Gabou Measurements ==
 
== Gabou Measurements ==
  
* Summary (see NEG BPM) - [[media:UITF_SPM_Summary_9_21.ods]]
+
* Summary (see NEG BPM 1-4) - [[media:UITF_SPM_Summary_9_21.ods]]
 
* NEG BPM #1 - [[media:NEG_1_1cmx2cm_lower.pdf]]
 
* NEG BPM #1 - [[media:NEG_1_1cmx2cm_lower.pdf]]
 
* NEG BPM #2 - [[media:NEG_2_1cmx2cm_upper.pdf]], [[media:NEG_2_1cmx2cm_boresight.pdf]]
 
* NEG BPM #2 - [[media:NEG_2_1cmx2cm_upper.pdf]], [[media:NEG_2_1cmx2cm_boresight.pdf]]
 
* NEG BPM #3
 
* NEG BPM #3
 
* NEG BPM #4
 
* NEG BPM #4

Revision as of 17:14, 14 June 2021

200 KV BPM's with NEG coating

ME Design

Assembly Sequence

  1. Receive can/feedthroughs
  2. Clean
  3. Degas
  4. NEG Coat
  5. Check feedthroughs
  6. Assemble feedthroughs
  7. serialize
  8. Leak check cans
  9. electrical measurement
  10. report K's and center

Gabou Measurements