NEG coated 2.5 inch OD BPM's

From Ciswikidb
Revision as of 17:13, 14 June 2021 by Grames (talk | contribs)
Jump to navigation Jump to search

New BPM's were developed for the 200 kV gun NEG tube beam line.

ME Design

Assembly Sequence

  1. Receive can/feedthroughs
  2. Clean
  3. Degas
  4. NEG Coat
  5. Check feedthroughs
  6. Assemble feedthroughs
  7. serialize
  8. Leak check cans
  9. electrical measurement
  10. report K's and center

Gabou Measurements