Difference between revisions of "NEG coated 2.5 inch OD BPM's"

From Ciswikidb
Jump to navigation Jump to search
Line 18: Line 18:
 
== Gabou Measurements ==
 
== Gabou Measurements ==
  
* Summary - [[media:UITF_SPM_Summary_9_21.ods]]
+
* Summary (see NEG BPM) - [[media:UITF_SPM_Summary_9_21.ods]]
 
+
* NEG BPM #1 - [[media:NEG_1_1cmx2cm_lower.pdf]]
* NEG BPM #1
+
* NEG BPM #2 - [[media:NEG_2_1cmx2cm_upper.pdf]], [[media:NEG_2_1cmx2cm_boresight.pdf]]
::- [[media:NEG_1_1cmx2cm_lower.pdf]]
 
* NEG BPM #2
 
::- [[media:NEG_2_1cmx2cm_upper.pdf]]
 
::- [[media:NEG_2_1cmx2cm_boresight.pdf]]
 
 
* NEG BPM #3
 
* NEG BPM #3
 
* NEG BPM #4
 
* NEG BPM #4

Revision as of 17:13, 14 June 2021

New BPM's were developed for the 200 kV gun NEG tube beam line.

ME Design

Assembly Sequence

  1. Receive can/feedthroughs
  2. Clean
  3. Degas
  4. NEG Coat
  5. Check feedthroughs
  6. Assemble feedthroughs
  7. serialize
  8. Leak check cans
  9. electrical measurement
  10. report K's and center

Gabou Measurements