Difference between revisions of "NEG coated 2.5 inch OD BPM's"

From Ciswikidb
Jump to navigation Jump to search
Line 21: Line 21:
 
* Summary (see NEG BPM 1-4) - [[media:UITF_SPM_Summary_9_21.ods]]
 
* Summary (see NEG BPM 1-4) - [[media:UITF_SPM_Summary_9_21.ods]]
 
* NEG BPM #1 - [[media:NEG_1_fixed.jpg]] [[media:NEG_1_fixed_log.jpg]] [[media:NEG_1_1cmx2cm_lower.pdf]]
 
* NEG BPM #1 - [[media:NEG_1_fixed.jpg]] [[media:NEG_1_fixed_log.jpg]] [[media:NEG_1_1cmx2cm_lower.pdf]]
* NEG BPM #2 - [[media:NEG_2_diff_sum.jpg]] [[media::NEG_2_log.jpg]] [[media:NEG_2_1cmx2cm_upper.pdf]], [[media:NEG_2_1cmx2cm_boresight.pdf]]
+
* NEG BPM #2 - [[media:NEG_2_diff_sum.jpg]] [[media:NEG_2_log.jpg]] [[media:NEG_2_1cmx2cm_upper.pdf]], [[media:NEG_2_1cmx2cm_boresight.pdf]]
 
* NEG BPM #3 - [[media:NEG_3_diff_sum.jpg]] [[media:NEG_3_log.jpg]]
 
* NEG BPM #3 - [[media:NEG_3_diff_sum.jpg]] [[media:NEG_3_log.jpg]]
 
* NEG BPM #4- [[media:NEG_4.jpg]] [[media:NEG_4_log.jpg]]
 
* NEG BPM #4- [[media:NEG_4.jpg]] [[media:NEG_4_log.jpg]]

Revision as of 17:28, 14 June 2021

200 KV BPM's with NEG coating

ME Design

Assembly Sequence

  1. Receive can/feedthroughs
  2. Clean
  3. Degas
  4. NEG Coat
  5. Check feedthroughs
  6. Assemble feedthroughs
  7. Serialize
  8. Leak check cans
  9. Electrical measurement
  10. Report K's and center

Electrical Measurements (K's, center, and linearity plots)