200 KV BPM's with NEG coating

ME Design

Assembly Sequence

  1. Receive can/feedthroughs
  2. Clean
  3. Degas
  4. NEG Coat
  5. Check feedthroughs
  6. Assemble feedthroughs
  7. Serialize
  8. Leak check cans
  9. Electrical measurement
  10. Report K's and center

Electrical Measurements