NEG coated 2.5 inch OD BPM's

From Ciswikidb
Revision as of 17:11, 14 June 2021 by Grames (talk | contribs)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

New BPM's were developed for the 200 kV gun NEG tube beam line.

ME Design

Assembly Sequence

  1. Receive can/feedthroughs
  2. Clean
  3. Degas
  4. NEG Coat
  5. Check feedthroughs
  6. Assemble feedthroughs
  7. serialize
  8. Leak check cans
  9. electrical measurement
  10. report K's and center

Gabou Measurements

  • NEG BPM #1
- media:NEG_1_1cmx2cm_lower.pdf
  • NEG BPM #2
- media:NEG_2_1cmx2cm_upper.pdf
- media:NEG_2_1cmx2cm_boresight.pdf
  • NEG BPM #3
  • NEG BPM #4