Difference between revisions of "November 12, 2019 - AIPINJ modeling meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
== Topics ==
 
== Topics ==
;Status on layout from chopper to booster (location of buncher)
+
*Which layout of buncher does GPT suggest is Plan A?
  
;Can new prebuncher location support 130 keV operation
+
*Can the new prebuncher location support 130 keV operation (for a short while)?
  
;Discuss progress on modeling the gun-chopper region
+
*Discuss gun-chopper model
*Jay new 15 deg bend model (air-core and steel versions)
+
:Which gun model is GPT using (tee, small shed, something else), what is the extent in (r,z) ?
 +
:Should we identify Elegant match points a) after gun and b) before chopper to compare w/ GPT ?
 +
:Jay has modeled and optimized the 3" OD 15 deg bend model (air-core and steel versions), time to include this or later? [[media:191111_JB_15dipole.pdf]]

Revision as of 17:22, 11 November 2019

Topics

  • Which layout of buncher does GPT suggest is Plan A?
  • Can the new prebuncher location support 130 keV operation (for a short while)?
  • Discuss gun-chopper model
Which gun model is GPT using (tee, small shed, something else), what is the extent in (r,z) ?
Should we identify Elegant match points a) after gun and b) before chopper to compare w/ GPT ?
Jay has modeled and optimized the 3" OD 15 deg bend model (air-core and steel versions), time to include this or later? media:191111_JB_15dipole.pdf