Difference between revisions of "November 14, 2018 - Group Meeting"

From Ciswikidb
Jump to navigation Jump to search
Line 1: Line 1:
 
Fall 2018 Run, January 2019 SAD and Beyond...
 
Fall 2018 Run, January 2019 SAD and Beyond...
  
===2018 CEBAF Run===
+
===2018 CEBAF Fall Run===
 +
:: Tue 11/20 - Hall A turns off for rest of the year
 +
:: Mon 11/26 - Linac and Pass changes (ABCD = Off/4/2/5.5)
 +
:: Mon 12/10 - Linac and Pass changes (ABCD = Off/4/3/5.5)
 +
:: Thu 12/20 - Machine off at 8am for Holiday break
 +
 
 
:[https://logbooks.jlab.org/entry/3621348 Gun2 lifetime and recent QE scan]
 
:[https://logbooks.jlab.org/entry/3621348 Gun2 lifetime and recent QE scan]
 
:[https://logbooks.jlab.org/entry/3619778 Hall B Moller and Beam Energy]
 
:[https://logbooks.jlab.org/entry/3619778 Hall B Moller and Beam Energy]

Revision as of 09:57, 14 November 2018

Fall 2018 Run, January 2019 SAD and Beyond...

2018 CEBAF Fall Run

Tue 11/20 - Hall A turns off for rest of the year
Mon 11/26 - Linac and Pass changes (ABCD = Off/4/2/5.5)
Mon 12/10 - Linac and Pass changes (ABCD = Off/4/3/5.5)
Thu 12/20 - Machine off at 8am for Holiday break
Gun2 lifetime and recent QE scan
Hall B Moller and Beam Energy
Mott measurements
SF6 relief valve leak
Hall A Laser restoring
Vertical Wien PS instability addressed
Helicity board signal vs. setpoint

2018 LERF Status

LERF Driver Laser Enclosure Certified
LERF PSS Certification - Support for Gun and Laser enable

January 2019 CEBAF SAD

Heat/Activate Gun2 Photocathode SLSP
John ordered small tank to top off SF6
Install RTP Pockels cell
Implement 1kV anode safe floating bias supply inline with anode-picoammeter
Fiducialize IHA2D00 for Bubble
Accelerator electricians to install two new racks + cable tray in ISB for 200KV Wien HVPS and address iocin6 load
Install DBR?

Beyond