Difference between revisions of "Oct 4, 2021 - Tune Mode Generator"

From Ciswikidb
Jump to navigation Jump to search
(Created page with "Let's meet on Monday 10/4 @ 9am. We'll be in TL-2236 and/or join by bluejeans: https://bluejeans.com/7572697097 * Scott's summary media:211004 - Quick TMG History.docx")
 
 
(6 intermediate revisions by the same user not shown)
Line 1: Line 1:
Let's meet on Monday 10/4 @ 9am.
+
Monday 10/4 @ 9am.
  
 
We'll be in TL-2236 and/or join by bluejeans:  https://bluejeans.com/7572697097
 
We'll be in TL-2236 and/or join by bluejeans:  https://bluejeans.com/7572697097
  
 +
* Scott's TMG history : [[media:211004 - Quick TMG History.docx]]
  
* Scott's summary [[media:211004 - Quick TMG History.docx]]
+
* Scott's update macropulse chassis page : https://wiki.jlab.org/ciswiki/index.php/SCAM_macropulse_controller_used_at_CEBAF_GTS_and_UITF
 +
 
 +
* John's TMG schematics page : https://wiki.jlab.org/ciswiki/index.php/Tune_Mode_generators
 +
 
 +
* John's system components directory : [[media:211004_JohnComponents.xlsx]]
 +
 
 +
Follow-up from meeting today
 +
 
 +
* John's thoughts : [[media:211004_TMG thoughts.docx]]
 +
 
 +
# At ISB => add tee on C macropulse TTL output to high-impedance input network scope to MCC for Ops => to log image when problem occurs
 +
# At laser room + ISB => Patch power meter head by spare cable to ISB scope => to observe fast transitions of laser power when problem occurs?
 +
# At laser room => Compare wiring of Hall C RTP HV cable, are polarity leads reversed or different than others => to look for ground issue
 +
# At laser room => Observe fast 20ns fast transition and hold ~100 msec when going from CW to beam sync => to test HV driver
 +
# At laser room => Leave C in CW for extended period of time, than test TM/VL modes and the fast 20ns transition => test if a HV driver chip heating issue
 +
# At laser room + ISB => Configure C shutter to provide a read back of open/closed status to ISB => tests if the shutter is open/close remotely
 +
# At Test lab => Setup TMG taken from tunnel w/ same experience, test output into 1000:1 divider
 +
# At ISB => Swap SCAM module in the ISB => change in behavior, also monitor macropulse output
 +
# At laser room => Swap RTP cell => use spare or UITF cell => tests if we have an intermittent issue with RTP cell, maybe happens when RTP is OFF (i.e. CW) extended period

Latest revision as of 13:54, 4 October 2021

Monday 10/4 @ 9am.

We'll be in TL-2236 and/or join by bluejeans: https://bluejeans.com/7572697097

Follow-up from meeting today

  1. At ISB => add tee on C macropulse TTL output to high-impedance input network scope to MCC for Ops => to log image when problem occurs
  2. At laser room + ISB => Patch power meter head by spare cable to ISB scope => to observe fast transitions of laser power when problem occurs?
  3. At laser room => Compare wiring of Hall C RTP HV cable, are polarity leads reversed or different than others => to look for ground issue
  4. At laser room => Observe fast 20ns fast transition and hold ~100 msec when going from CW to beam sync => to test HV driver
  5. At laser room => Leave C in CW for extended period of time, than test TM/VL modes and the fast 20ns transition => test if a HV driver chip heating issue
  6. At laser room + ISB => Configure C shutter to provide a read back of open/closed status to ISB => tests if the shutter is open/close remotely
  7. At Test lab => Setup TMG taken from tunnel w/ same experience, test output into 1000:1 divider
  8. At ISB => Swap SCAM module in the ISB => change in behavior, also monitor macropulse output
  9. At laser room => Swap RTP cell => use spare or UITF cell => tests if we have an intermittent issue with RTP cell, maybe happens when RTP is OFF (i.e. CW) extended period