October 27, 2020 - Magnetic field mapping and characterization meeting

From Ciswikidb
Revision as of 12:39, 27 October 2020 by Chgarcia (talk | contribs) (Created page with "*Media:Magnetic field mapping meeting Oct 27 2020.pptx '''Hardware:''' * Use new SCE 20A/75V PS for measurements. This is the same type of PS that will be used for o...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Hardware:

 *   Use new SCE 20A/75V PS for measurements. This is the same type of PS that will be used for oparations
 *   DC power will install new SCE PS in magnet test ~10/29/20
 *   Software will provide EPICS controls and hysteresis ramp loops
 *   Label and wire coil leads to ensure positive current produces positive B field per convention
 *   PS limits for Hysteresis curve: 20A at 1A/s, but measurements done at +/- 19.9A

Field mapping:

 *   Hall probe step size 2 mm
 *   On axis values z=[-25,25] cm
 *   Background: measure z=[-30,30] cm. First run the probe in this range w/o the magnet. Then place the magnet for measurements and do a full map at 0 A after hysteresis at 0A . Finally subtract from each value.
 *   Off axis values: limited by 15 mm diameter nickel endplates hole and 6 mm square hall probe. Measure z=[-25,25] cm once at 18A and as far as these limitations allow in +X,-X,+Y,-Y and record X,Y positions for comparing with models.
 *   Measure at +/-19.9A, +/- 15A, +/- 10A, +/-5A and 0A.

CED field map

 *   EPICS hysteresis cycle ending at +19.9 A.  Measure B(I) at center of magnet at 19.9A, then decrement by 0.9A to 19A, then 1 A increments until -19 A reached.  Final reading -19.9A.  All without further hysteresis loops.   Finally, set to zero A and EPICS hysteresis cycle.  

Other measurements:

 *   V vs I resistance and inductance.