File:HV Controls update meeting Oct 28 2020.pptx

HV and interlock cables:

* Old Wien HV cables have been disconnected  but still in place
* Gun2 and Gun3 HV cables removed. Conduit to be reused for running new Wien HV cables from ISB to tunnel
* HV cables have been staged at ISB
* Electricians to re-conduit top of Wien HV controls rack to top of IN01B01 to run each pair of HV cables through each conduit
* Cables for interlocks are ready, still deciding if they will be run through same conduit or outside of conduit through penetration