Difference between revisions of "PPB - Conferences, Workshop and Meetings"

From Ciswikidb
Jump to navigation Jump to search
Line 21: Line 21:
 
** A. Ushakov (25+5), "Positron target design and fatigue studies"
 
** A. Ushakov (25+5), "Positron target design and fatigue studies"
 
** S. Habet (25+5), "Concept of a polarized positron injector for CEBAF"
 
** S. Habet (25+5), "Concept of a polarized positron injector for CEBAF"
** D. Turner (25+5), "Delivering e+ beams from LERF through Ce+BAF"
+
** D. Turner (25+5), "Delivering e+ beams from LERF through Ce+BAF" (draft) [[media:Turner_UVA_2023.odp]]
  
 
===2022===
 
===2022===

Revision as of 10:06, 1 March 2023

2023

  • May 7-12, 14th International Particle Accelerator Conference, Venice Italy - https://www.ipac23.org/
    • G. Blume et al., (poster) "A 5 MeV Compton transmission polarimeter designed for a SRF photogun" media:abstract-1233.pdf
    • J. Grames et al., (poster) "Status of Ce+BAF: Polarized Positron Beam Capability at CEBAF 12 GeV" media:abstract-1313.pdf
    • R. Kazimi et al., "Polarized Electron Injector for Positron Capability at CEBAF 12 GeV" media:abstract-1917.pdf
    • A. Sy et al., "Degrader beamline design at the CEBAF injector for machine acceptance studies" media:Amy_Sy-IPAC23.pdf
    • A. Ushakov et al, "Conceptual Design of a High-Power Target for Positron Production at CEBAF" media:abstract-1794.pdf
  • Mar 21-24, International Workshop on CLAS12 Physics and Future Perspectives at JLab, Paris France - https://indico.ijclab.in2p3.fr/event/9131/
    • A. Bogacz (20+5), "Status of CEBAF upgrades"
    • Y. Roblin (20+5), "Positron beam: technical aspects"
  • Mar 7-8, U. Va. Positron Working Group Meeting, Charlottesville - https://indico.jlab.org/event/680/
    • J. Grames (25+5), "Ce+BAF concept and the challenging polarized e- source" (draft) media:Grames-UVA-2023-v4.pptx
    • A. Ushakov (25+5), "Positron target design and fatigue studies"
    • S. Habet (25+5), "Concept of a polarized positron injector for CEBAF"
    • D. Turner (25+5), "Delivering e+ beams from LERF through Ce+BAF" (draft) media:Turner_UVA_2023.odp

2022

  • Nov 1-4, Hall B CLAS Collaboration Meeting (30th Anniversary), Jefferson Lab
  • Jun 21-24, Hall B CLAS Collaboration Meeting
  • Mar 28-30 J-Future Workshop, Jefferson Lab / Messina University - https://indico.jlab.org/event/520/
    • J. Grames, Ce+BAF : Considerations and Prospects for Polarized (and unpolarized) Positron Beams,

2021

  • Oct 27-29, Instrumentation Development for High Energy Physics French-Ukrainian Workshop, IJCLab

2020

  • Jefferson Lab Accelerator Advisory Committee (Oct 20-23) Slides
  • J. Grames Production of Polarized Positrons at Jefferson Lab, CFNS Workshop on Beam Polarization and Polarimetry at EIC ([1]), June 26, 2020 Draft media:CNFS_2020_v2.pptx
  • P. Degtiarenko, J. Kowal, J. Musson, S. Philip, M. Tiefenback, K. Welch, Some Practical Considerations for a Positron Source and Positron Beam Operations at CEBAF, edited J. Grames, May 11 2020 media:PositronConsiderations_FINAL.docx

2019

2018

2017

2016

2002