Difference between revisions of "PPB - Oct 8, 2021"

From Ciswikidb
Jump to navigation Jump to search
 
(2 intermediate revisions by the same user not shown)
Line 9: Line 9:
 
* Unpolarized update- Mark
 
* Unpolarized update- Mark
 
* Eric- Last 3 slides relevant to two target system [[media:4SHAS.pptx]]
 
* Eric- Last 3 slides relevant to two target system [[media:4SHAS.pptx]]
* Sami- Two target simulation [[media:.pptx]]
+
* Sami- Two target simulation [[media:Thickness optimization (2).pptx]]
 
* optimization run time 24-48 hrs
 
* optimization run time 24-48 hrs
  
Line 22: Line 22:
 
* scheme to improve efficiency of distribution and statistics.
 
* scheme to improve efficiency of distribution and statistics.
 
* 123 MeV not enough energy for two target system.
 
* 123 MeV not enough energy for two target system.
 +
* begin thinking about 10 GeV concept in the tunnel [[media:10GeV.png]]

Latest revision as of 11:20, 8 October 2021

Meeting Info

We will meet on Wed (UAS 8am, JLab 10am, IJCLab 4pm)
Bluejeans: https://bluejeans.com/405130883/4307
Code to start the meeting 4307

Oct 8 Agenda

  • Round table updates
  • Linux GPT-s complete need to install and check before putting on the farm
  • Unpolarized update- Mark
  • Eric- Last 3 slides relevant to two target system media:4SHAS.pptx
  • Sami- Two target simulation media:Thickness optimization (2).pptx
  • optimization run time 24-48 hrs

Objective(s)

  • Mark: produce table for unpolarized simulation results
  • Mark: 500M simulation from GEANT4 in polarized beamline
  • Mark: python/Matlab GPT Plots
  • Mark: Verify Linux GPT -s functions

Meeting Notes & Objectives Status

  • addition of collimation in Sami's simulation.
  • scheme to improve efficiency of distribution and statistics.
  • 123 MeV not enough energy for two target system.
  • begin thinking about 10 GeV concept in the tunnel media:10GeV.png