Difference between revisions of "PPB - Sep 28, 2021"

From Ciswikidb
Jump to navigation Jump to search
Line 10: Line 10:
 
* LDRD update - [[media:Grames_Jamboree_v3.pptx]]
 
* LDRD update - [[media:Grames_Jamboree_v3.pptx]]
 
* Xelera proposal - A high-power positron converter based on a recirculated liquid metal in-vacuum target
 
* Xelera proposal - A high-power positron converter based on a recirculated liquid metal in-vacuum target
:Geant4 simulations to evaluate/optimize target thickness for e+ yield/polarization distributions
+
:*Geant4 simulations to evaluate/optimize target thickness for e+ yield/polarization distributions
:Intellectual effort to develop a Phase 2 framework for UITF installation &
+
:*Intellectual effort to develop a Phase 2 framework for UITF installation &
:If helpful, could consider a trip to visit your lab
+
:*If helpful, could consider a trip to visit your lab
 
* Sami's vist
 
* Sami's vist
  

Revision as of 11:20, 29 September 2021

Meeting Info

We will meet on Wed (UAS 9am, JLab 11am, IJCLab 5pm)
Bluejeans: https://bluejeans.com/405130883/4307
Code to start the meeting 4307

Sep 29 Agenda

  • Mark- polarized positron capture up to 123 Mev media:Stefani9292021.pptx
  • Discussion- Target geometry and beam size effects on emittance
  • LDRD update - media:Grames_Jamboree_v3.pptx
  • Xelera proposal - A high-power positron converter based on a recirculated liquid metal in-vacuum target
  • Geant4 simulations to evaluate/optimize target thickness for e+ yield/polarization distributions
  • Intellectual effort to develop a Phase 2 framework for UITF installation &
  • If helpful, could consider a trip to visit your lab
  • Sami's vist


Weekly Objective(s)

  • Mark: unpolarized optimization
  • Sami: two target system

Meeting Notes & Objectives Status