PPB - September 7, 2022

From Ciswikidb
Revision as of 09:51, 7 September 2022 by Grames (talk | contribs) (Created page with "===Coordinates=== * On-site => Wednesdays @ 11am EDT in TL-2236 * Zoom => https://jlab-org.zoomgov.com/j/1609550529?pwd=RlNJYytUSk1tbzNJeUIxNUptTk9UzQT09&from=addon === New T...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
The printable version is no longer supported and may have rendering errors. Please update your browser bookmarks and please use the default browser print function instead.

Coordinates

New Topics

  • e+ source transmission with 7cm and 3.5cm apertures
  • updates from the gang
  • what we want to do in FY23

Old Topics

  • Sami - evaluate e+ yield and final momentum as a function of capture linac parameters (gradient phase aperture) File:QWT 08 31 – Copie – Copie.pptx
  • Yves - begin working on injection/extraction lines from linacs
  • Dennis - update LERF to SL transport line to agree better with the FML costing geometry
  • Alicia - solicited for emission parameters for GPT, building model of Gun through QCM (desired matchpoint)
  • Carlos - evaluate gun voltage and electrode gap for 60 deg and E profiles vs. gap (compared to as built magnetic profile)
  • S&A will plan to measure LERF relative to CEBAF and cryo points for Joe, Kelly will add FML layout to CEBAF and provide Joe Gubeli points for CEBAF
  • Joe Gubeli - would like elegant lines when available, can show them in LERF model
  • Joe/Fanglei/Amy - exchange ideas/options for e+ spin rotator inside LERF
  • Joe - prototype experiment planning media:220831_LERF_injectors.pptx

Reminders

Workshop on Polarized Sources Targets and Polarimetry (PSTP22) - Mainz, Germany, Sept 26-29 2022 [1]

  • J. Grames, "Spin Polarized Positron Beam Upgrade for Jefferson Lab", Abstract

Shareas