Difference between revisions of "PQB Meeting May 25, 2017"

From Ciswikidb
Jump to navigation Jump to search
 
Line 17: Line 17:
  
 
2- PQB requirements at Jefferson Lab Electron-Ion Collider (JLEIC)
 
2- PQB requirements at Jefferson Lab Electron-Ion Collider (JLEIC)
 +
 +
 +
3- Two new Beam Position monitors (BPMs) will be installed immediately after the electron gun and before the 15 degree bend. May want to connect to the Injector Parity DAQ.

Latest revision as of 11:53, 25 May 2017

We will meet in TL 2236 Thursday May 25 at 9:00 am EST.

For those calling in we'll use the Blue Jeans [1] audio conference system.

Phone number: 1-888-240-2560
Meeting ID: 3528502673#
Meeting URL: http://bluejeans.com/3528502673


Agenda:

1- Update on Hall A Halo Monitor:

  1. Cost is about $2k
  2. VaTech is making the halo target
  3. Plan to install this summer
  4. Halo sensitivity is about 10-7


2- PQB requirements at Jefferson Lab Electron-Ion Collider (JLEIC)


3- Two new Beam Position monitors (BPMs) will be installed immediately after the electron gun and before the 15 degree bend. May want to connect to the Injector Parity DAQ.