Difference between revisions of "Phase 1"

From Ciswikidb
Jump to navigation Jump to search
(25 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
== Quick Phase 1 Links ==
 
== Quick Phase 1 Links ==
  
* Schedule as of 1/25/21 [[media:210125_AIPINJ_Schedule.pdf]]
+
: ATLIS => [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21170 Phase 1 ATLIS]
* Updated Injector Quick Reference Drawing, Rev17beta, Draft 2, 2/19 [[media:12GeV injector quick reference rev17 DRAFT-2.pdf]]
+
: 8:30 Tools => [[CIS Phase 1 work plans]]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21170 Phase 1 ATLIS]
+
: HCO => [[Phase 1 - HCO & Commissioning]]
 
+
: Meetings=> [[AIPINJ - Upgrade Meetings]]
==Planning, planning, planning...==
+
: Schedule Status => [[media:210125_AIPINJ_Schedule.pdf]]
: [[CIS Phase 1 work plans]]
 
: [[Phase 1 - HCO & Commissioning]]
 
: [[AIPINJ - Upgrade Meetings]]
 
: [https://jeffersonlab-my.sharepoint.com/:f:/g/personal/grames_jlab_org/EhXqNtq16CBNt4JzMmy4T1ABbL3OnBkCCHeIvb8PQE3aZw?e=vpc8ZM 3D cad and released drawings on AIPINJ OneDrive Folder]
 
  
 
== Major Phase 1 Beamline Components ==
 
== Major Phase 1 Beamline Components ==
Line 17: Line 13:
 
:[[DR dipole (15 deg)]] - New 15 deg air core bend dipole replaces pre-existing DS dipole
 
:[[DR dipole (15 deg)]] - New 15 deg air core bend dipole replaces pre-existing DS dipole
 
:[[FX beamline and FY chopper solenoids]] - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
 
:[[FX beamline and FY chopper solenoids]] - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
 +
:[[FG spin solenoids]]
 
:[[PSS Kicker (upgraded for 200 kV upgrade)]] - New PSS kicker of reliable design to operate at 200 kV with shorter throw
 
:[[PSS Kicker (upgraded for 200 kV upgrade)]] - New PSS kicker of reliable design to operate at 200 kV with shorter throw
 
:[[WF Wien Filters (200 kV upgrade)]] - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
 
:[[WF Wien Filters (200 kV upgrade)]] - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
Line 30: Line 27:
  
 
==ATLIS Tasks==
 
==ATLIS Tasks==
 +
'''Open, complete, re-scheduled statuses updated 3/15/21'''
  
 
;AIPINJ
 
;AIPINJ
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21370 Injector Wien Filter - system upgrade (2020 SAD)]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22151 AIPINJ: temporary 5D beam line removal]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21332 Removal of PSS kicker magnet injector segment]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22161 Removal/Er-installation of Part of 5D line in Inj.]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21164 Mat'l Handling and Installation for Phase I of Inj. Upgrade]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21911 Gun high voltage conditioning]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21370 Injector Wien Filter - system upgrade (2020 SAD)]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21164 Mat'l Handling and Installation for Phase I of Inj. Upgrade]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/19517 Penetration Drops]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20270 Remove and re-install BPM's Gun to chopper]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21332 Removal of PSS kicker magnet injector segment]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20275 Install new IPM2I03]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20395 Pedestal Location Surveys]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20404 Install Chopper SSA's]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20268 Remove and calibrate current monitoring electronics]
* [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17932 Harp work]
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/uitflist/task/1273 Testing Wien HV Controls at UITF]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21490 IOCSE11 & IOCINSE4 BPM Controls Update]
+
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/20275 Perform Installation work for newly added Injector bpm during 2020 SAD]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21431 Install and Commission Wien filter Power Supplies]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21570 Install PSS jumpers for laser work at the Injector]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21198 Survey support for Injector Upgrade]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21922 Relocate Recepacles Downstairs in Injector Bldg.53]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22071 DC Power Support for Injector Upgrade]
 +
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22201 STAC5 A1 Aperture Epics Controls]
 +
 
 +
 
 +
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20410 Chopper SSA LCW]
 +
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21490 IOCSE11 & IOCINSE4 BPM Controls Update]
 +
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21570 Install PSS jumpers for laser work at the Injector]
 +
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21922 Relocate Recepacles Downstairs in Injector Bldg.53]
 +
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21211 Install Lifting Plates in Ijn. Ceiling to Support 1/4 CM Swap]
 +
 
  
 
;CIS SAD Tasks
 
;CIS SAD Tasks
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
+
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/19463 New Gun2 loading chamber]
 +
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21920 CEBAF Lead Bricks : Collect, Sort, Clean, Paint, Store]
 
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
 
* Placeholder for Tim Minga to test laser room smoke detector alarm to MCC/Guard
* [https://logbooks.jlab.org/entry/3844689 Fix IHWP readback during SAD]
+
* '''Open''' No ATLis [https://logbooks.jlab.org/entry/3844689 Fix IHWP readback during SAD]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21920 CEBAF Lead Bricks : Collect, Sort, Clean, Paint, Store]
+
 
 +
 
 +
* '''Complete''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=20383 Injector Macropulse/Tune Mode Generator Modification]
 +
 
  
 
;Injector Related SAD Tasks
 
;Injector Related SAD Tasks
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21431 Install and Commission Wien filter Power Supplies]] (magnet PS)
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22130 LLRF Diagnostics and Repairs in the Linacs and Injector]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21353 Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ]]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22100 April 2021 10 Amp System PM Maintenance]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21330 PSS Injector Interface Chassis removal]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22020 Annual Crane Inspections Site wide May 17- May 27 2021]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21316 VME FSD Master Card Commisioning]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21330 PSS Injector Interface Chassis removal]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21288 429 mHz Amp & Power supply being pulled for repair]
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21542 PSS CAMAC Relay cards replacement with VME versions for Injector and BSY]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20271 2020 SAD Injector / North Linac 30 Hz System checks]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 I&C Injector Camac to Vme and camera upgrade]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21353 Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17247 I&C Upgrade harps to PC104]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21330 PSS Injector Interface Chassis removal]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21331 I&C Upgrade existing ItoV System with ItoV VME cards]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21145 PSS Injector Segment PLC Upgrade]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 I&C Accelerator network re-survey]
+
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21542 PSS CAMAC Relay cards replacement with VME versions for Injector and BSY]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21334 FAC Tunnel Fire Alarm and Suppression Replacement]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20415 I&C Injector Camac to Vme and camera upgrade]
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21242 Apply labels to I&C components during 2020 SAD]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/17247 I&C Upgrade harps to PC104]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21353 Install Ion Pump HV cables and mount Junction boxes on cable trays NL and INJ]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21331 I&C Upgrade existing ItoV System with ItoV VME cards]
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21020 Neutron Detector System Installation (SAD 2020)]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/18471 I&C Accelerator network re-survey]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20644 UHV Power Supply Replacement (ISB)]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21334 FAC Tunnel Fire Alarm and Suppression Replacement]
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376 Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version]
+
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21242 Apply labels to I&C components during 2020 SAD]
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21373 Trim Utility Chassis Upgrade - All CEBAF Trim Racks]
+
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21020 Neutron Detector System Installation (SAD 2020)]
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21421 SAD 2020: P.M. of 24V Vacuum Power Supply Chassis]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20644 UHV Power Supply Replacement (ISB)]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21680 VME crate upgrade to IOCIN3]
+
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21373 Trim Utility Chassis Upgrade - All CEBAF Trim Racks]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21653 Remove old Sonitrol system hardware from NA and SA]
+
* '''Open''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21421 SAD 2020: P.M. of 24V Vacuum Power Supply Chassis]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21696 Shutdown of Panel I-BT in the Injector]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21680 VME crate upgrade to IOCIN3]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21881 Insertable CAMAC to VME EPICS Controls upgrade Injector (iocin1->iocin1b) ]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21653 Remove old Sonitrol system hardware from NA and SA]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21850 Software Controls PSS Injector and North Linac changes on iocsoftsafe2]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21696 Shutdown of Panel I-BT in the Injector]
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21882 B53 (INJ SB) Panelboard PM]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21881 Insertable CAMAC to VME EPICS Controls upgrade Injector (iocin1->iocin1b) ]
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21912 Perform Basic PM of 45 MeV spectrometer Power Supply]
+
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21850 Software Controls PSS Injector and North Linac changes on iocsoftsafe2]
 +
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21912 Perform Basic PM of 45 MeV spectrometer Power Supply]
 +
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=20311 2020 SAD and Beyond CAMAC / VME PM maintenance and repairs]
 +
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21981 iocin1 - VME crate replacement]
 +
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21379 Study - Site Ground Loop]
 +
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21103 Change transformer tap settings - oil filled transformers]
 +
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/21991 Injector Survey Monuments install]
 +
* '''Open''' [http://devweb.acc.jlab.org/CSUEApps/atlis/task/20972 Remove Old 45MeV Dump and re-Install at End of SAD]
 +
 
 +
 
 +
* '''Complete''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21882 B53 (INJ SB) Panelboard PM]
 +
 
 +
 
 +
* '''Rescheduled''' [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/21376 Injector (prebuncher, buncher and choppers)- LLRF systems upgrade to 3.0 version]

Revision as of 18:06, 7 April 2021

Quick Phase 1 Links

ATLIS => Phase 1 ATLIS
8:30 Tools => CIS Phase 1 work plans
HCO => Phase 1 - HCO & Commissioning
Meetings=> AIPINJ - Upgrade Meetings
Schedule Status => media:210125_AIPINJ_Schedule.pdf

Major Phase 1 Beamline Components

200 kV gun - Cathode, anode and high voltage system
200 kV NEG Coated BPM's - New BPM's on beam pipe, NEG coated and absolutely mapped
Y-chamber Laser Window - Evaluating the best window to minimize birefringence under stress
DR dipole (15 deg) - New 15 deg air core bend dipole replaces pre-existing DS dipole
FX beamline and FY chopper solenoids - New double-coil sw/cw capable solenoids with 38 mm (FX) and 46 mm (FY) ID
FG spin solenoids
PSS Kicker (upgraded for 200 kV upgrade) - New PSS kicker of reliable design to operate at 200 kV with shorter throw
WF Wien Filters (200 kV upgrade) - Upgraded Wien filters with 20 A magnetic coils and >18 kV electrodes to rotate spin of 200 keV electrons
QW Wien quadrupoles (200 kV upgrade) - New quads designed for 200 keV energy, w/ improved magnetic field quality
Chopping System (200 kV upgrade) - Choppers get higher power amplifiers, maybe a new chopping chamber
Pre-buncher cavity (200 kV upgrade) - Existing stainless steel pre-buncher replaced by copper cavity for higher power.
NEG coated 2.5 inch OD BPM's - Replacing (2) existing with (3) new BPM's, provide (x,x',y,y') from gun, help tuning
HD steering coils - New steering coils for the A1/A2 aperture cubes, improved design and for 200 keV energy
A1/A2 Aperture Steering Cubes - Reinvented A1/A2 apertures define beam size and PSS kicker destination, include upgraded HD steering coils
Injector upgrade vacuum improvements - Improvements in the vacuum design, use of getter and ion pumps
Beamline viewers
LLRF 3.0 Phase 1

ATLIS Tasks

Open, complete, re-scheduled statuses updated 3/15/21

AIPINJ



CIS SAD Tasks



Injector Related SAD Tasks