==CIS Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30) ==
+
5/6/21 This page no longer in use.  
* 4/06/21 - Updated punchlist [[media:210406_CIS_HCO.docx]]
 
* 3/22/21 - Updated punchlist [[media:210322_CIS_HCO_v2.docx]]
 
  
==I&C/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30) ==
+
For Phase 1 HCO/SR: [[Phase 1 System Readiness]]
<div class="mw-collapsible mw-collapsed">
 
  
; I&C Jobs
+
For Phase 1 Beam Commissioning: [[Phase 1]]
* What to expect in tunnel?
 
** Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
 
** There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
 
** Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable tray (above/below) + 3 cable drops (Y, Laser, Chopper)
 
  
'''* BPMs = Pete estimates 1 person x 5  days for all of the BPM hook-up and pre-beam checkout jobs'''
 
** 10 total - all unrotated
 
** 3 new style => NEG coated large bore (2.5" ID); mapped by Musson (Kx/Ky values available)
 
** 7 old style => 5.5" long end tapped
 
  
* Viewers
+
[[File:404 dog.png|1000px]]
** 8 total  - all chromox except ITV0I02 (YAG)
 
** Crash inhibit #1 : ITV0I01 and Polarized Cup IFY0I01
 
** Crash inhibit #2 : ITV0I02 and Harp IHA0I02
 
 
 
* Harps
 
** 1 total - IHA0I02 (YAG), on same cross as viewer ITV0I02 (requires crash inhibit)
 
 
 
* Wien HV
 
** Tony status update
 
 
 
'''* Current Monitoring - Pete estimates 1 person x 3 days for ItoV, Picoammeters, Gun FSD LCW waterflow interlocks)'''
 
** 3 total - same as before (PCUP, A1, A2)
 
** PCUP identical as before, just a new location
 
** A1 current monitoring as before, linear bellow motion now has STAC5 motor (so remote or manual; has 3 stop positions
 
** A2 current monitoring as before, linear bellows manual as before; has 3 stop positions.  Used by PSS group for kicker
 
 
 
* Valves
 
** 3 total - all have in-line EPICS shut over ride capability (CIS installs this box)
 
** Gun valve - VBV2I01A (new name), otherwise same all metal gate valve
 
** Beam line valve - VBV1I07 (same name), same all metal gate valve
 
** Beam line valve - VBV0I02 (same name), but now all metal gate valve, requires cable terminations like VBV1I07
 
** All 3 valves tied to UHV vacuum fault (100 uA limit)
 
 
 
* Ion pumps
 
** Marcy's final list [[media:210209_ion pump names.xlsx]]
 
 
 
; Software Jobs
 
* CED
 
** Michele or Gary can gives us an update
 
 
 
* Apps
 
** Injector steering script getting upgrades for Wien/Solenoid controls, also needs update of correctors/bpms
 
** Any script that refers to CED elements from Gun to Chopper will need name review, sounds like a big job
 
 
 
* Screens
 
** I guess many screens auto-updated from CED, that's great
 
** Like with apps, will need name review; I guess system owners look at their own screens for oddities?
 
 
 
* What else for software?
 
 
 
</div>
 
 
 
==Magnet/DC-Power/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30) ==
 
<div class="mw-collapsible mw-collapsed">
 
 
 
; DC/Magnet Jobs
 
* Spreadsheet updated 3/15 [[media:210315_Phase1_Magnet_Summary.xlsx]]
 
::Updated MHD field map due from JM/LL to GC
 
::Updated MFX (SW/CW) field map due from RS to GC
 
* Spreadsheet updated after further feedback [[media:210301_Phase1_Magnet_Summary_v3.xlsx]]
 
* Spreadsheet updated at 3/1 SAD planning meeting [[media:210301_Phase1_Magnet_Summary_v2.xlsx]]
 
* Spreadsheet initially [[media:210301_Phase1_Magnet_Summary.xlsx]]
 
 
 
; Software Jobs
 
* CED
 
* Apps
 
* Screens
 
* What else for software?
 
 
 
; Other magnet jobs
 
* (JM) Complete magnet table I circulated
 
* '''Done'''(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
 
* (RS/GC) FG solenoid special hysteresis for Gary
 
* (RS/MJ) Magnet info for Inj Steer spin calculations
 
* (JM/JG) Decision on spare DR fabrication and alignment
 
* '''Done''' (LL/JK/JM) PSS kicker -  does MMF have any responsibility here, maybe just PSS?
 
* '''Done''' (LL/JM) Second QW measurement, what's the scope here?
 
* '''Done''' (JM) When is the rotating coil stand ready?
 
* (JM/LL) Reconciling MHD discrepancy
 
* (LL) Report on QW
 
* (LL) Report on HD
 
* (LL) Report on PSS kicker
 
 
 
 
 
</div>
 
 
 
== System Readiness / HCO Schedule (April '21) ==
 
<div class="mw-collapsible">
 
 
 
'''For detailed plans for a given day, discussed at 830 toolbox meeting every weekday, see [[CIS Phase 1 work plans]]'''
 
 
 
'''Format:''' time: System (# of people)
 
 
 
{| class="wikitable" style="text-align: center"
 
|-
 
! style="background-color: #eca1a6" | '''April''' !! style="background-color:#eca1a6" | Mon  !! style="background-color:#eca1a6" |  Tue !! style="background-color:#eca1a6" |  Wed !! style="background-color:#eca1a6" |  Thu !! style="background-color:#eca1a6" |  Fri !! style="background-color:#ada397" |  Sa !! style="background-color:#ada397" |  Su
 
|- style="background-color:#d6cbd3"
 
| ! style="background-color:#eca1a6" | '''12th - 16th''' || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Afternoon: Magnet Hook-Ups (2x) || !! style="background-color:#ada397" | Magnet Hook-Ups (2x) || !! style="background-color:#ada397" | Magnet Hook-Ups (2x)
 
|- style="background-color:#bdcebe"
 
| ! style="background-color:#eca1a6" | '''19th - 23rd'''  || Morning: ItoV/Pico/GunFSD (1x) <br> Morning: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: ItoV/Pico/GunFSD (1x) <br> Morning: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: ItoV/Pico/GunFSD (1x) <br> Morning: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) ||  Morning: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) || 6a-noon: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) || !! style="background-color:#ada397" | Magnet Hook-Ups/HCO (2x) <br> || !! style="background-color:#ada397" | Magnet Hook-Ups/HCO (2x)
 
|- style="background-color:#d6cbd3"
 
| ! style="background-color:#eca1a6" | '''26th - 30th''' || Magnet HCO (2x) <br> I&C Float || Magnet HCO (2x) <br> I&C Float || Magnet HCO (2x) <br> 2B Alignment <br> ''Swings: PSS beamline Certs'' || Magnet HCO (2x) <br> 2B Alignment <br> ''Swings: PSS beamline Certs'' || Magnet HCO (2x) || !! style="background-color:#ada397" | Magnet HCO (2x) || !! style="background-color:#ada397" | Magnet HCO (2x)
 
|- style="background-color:#bdcebe"
 
|}
 
 
 
* BPM = Francis
 
* ItoV, Picoammeters, Gun FSD Interlocks = Francis
 
* Viewers = Norris
 
* Harps = Dela Cruz
 
* Magnet / DC Power = Coleman
 
* 2B Alignment = S&A, Gould
 
* PSS = Kowal
 
 
 
</div>
 
 
 
== Beam Commissioning (May 3 - Jul 2) ==
 
<div class="mw-collapsible mw-collapsed">
 
 
 
=== Documents, Links, Important Dates ===
 
 
 
Links:
 
* [https://wiki.jlab.org/ciswiki/index.php/January_25,_2021_-_Weekly_Commissioning_Meetings 1/25/21 Beam Drivers Preliminary Meeting]
 
* [https://jeffersonlab.sharepoint.com/sites/CEBAFInjectorSetupProceduresDevelopment Injector Procedures Workspace]
 
 
 
Documents:
 
* 3/16/21 Beam Drivers Meeting Slides [[media:BeamDrivers_Pt2_3.16.21.pdf]]
 
* Injector Group Beam Commissioning Slides [[file:BeamINJphase1v5.pptx]]
 
 
 
* Commissioning Checklist (Grames) [[file:210401_Phase1_Commissioning.docx]]
 
* Preliminary Commissioning Test Plan Layout [[file:3.31.21 BeamCommissioningPlanLayout AIPINJ-1 firstpass.ods]]
 
 
 
Dates:
 
''updated 4/7/21''
 
* '''Finalize commissioning plan: April 5th'''
 
* Injector HCO/SR Complete: 5/2
 
* Injector Beam Commissioning Begins: 5/3
 
* NL/Inj -> Stable 2K: 5/21
 
* Full CEBAF PSS Certification: 5/24 - 6/11
 
* End of SAD: 7/2
 
* Resumption of Physics: Mid-August
 
 
 
 
 
=== ATLis Testplans ===
 
<div class="mw-collapsible mw-collapsed">
 
''updated 4/7/21''
 
 
 
General / Catch-All Test Plans
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22060 22060 Beam Commissioning AIPINJ Phase I (general ATLis)]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21170 Injector Upgrade - Phase 1 Installation (Gun to Chopper)]
 
 
 
 
 
With-Beam Hardware Commissioning Test Plans
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22061 22061 PSS Kicker Tests @ 130keV & 200keV]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22080 22080 AIPINJ: 130/200 keV HVPS vs. PCUP current monitor calibration]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22082 22082 AIPINJ: 130/200 keV lifetime measurements]
 
* Transmission vs Gun HV
 
 
 
 
Beam Commissioning
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22180 22180 Gun to Chopper Commissioning _130keV / 200keV beam to PCup]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22181 22181 Early Injector Orbit Data Collection Rev. April/May 2021]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182 Set up beam from PCup to FC1 at 130keV]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22183 22183 Beam steer from FC1 to FC2]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22184 22184 Efficacy of Knobs chosen for spot move correction]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22190 22190 RF Elements Setup (Injector Upgrade Phase 1), Lasers phases, Prebuncher, and Choppers]
 
 
 
 
 
Optics Test Plans
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21923 21923 Perform 130keV emittance measurements and matching as part of Injector Upgrade commissioning]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22072 22072 Perform 200keV emittance measurements and matching as part of Injector Upgrade commissioning]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=19784 19784 Test multiwire emittance measurement with beam]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22160 22160 Measure optics at various coil fixture rotation angles for MDR1I02]
 
 
 
 
 
Spin/Wien Test Plans
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22090 22090 Mott Hot Checkout]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22091 22091 Spin Dance to Calibrate Upgraded CEBAF Injector 3D Spin Rotator]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22092 22092 Set 3D Spin Rotator: Flip-Right, Flip-Left, and Vertical Polarizarion]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22083 22083 AIPINJ: Test new hysteresis function for spin solenoids (MFG1I04A/B)]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22084 22084 AIPINJ: 130/200 keV E/B calibrations for V-Wien and H-Wien]
 
* Beam ToF vs Wien Setting, 130keV and 200keV
 
 
 
 
 
Parity Quality Beam Test Plans
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22040 22040 cathode 45deg rotation and spot moves]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22050 22050 130keV sensitivity test]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22051 22051 200keV sensitivity test]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22052 22052 Transmission test gun 200keV]
 
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22053 22053 RTP pos diff feedback convergence FC2 test]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22120 22120 Chopper scan 130keV]
 
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22121 22121 Chopper scan 200keV]
 
 
 
 
 
 
 
</div>
 
 
 
=== Activities ===
 
<div class="mw-collapsible">
 
''updated 3/29/21''
 
 
 
Quick-View:
 
 
 
[[File:Commissioning testplans Rev8.png | 600px]]
 
 
 
 
 
Full details:
 
 
 
[[File:Beam commissioning full details rev8.png | 800px]]
 
 
 
 
 
</div>
 
</div>
 
 
 
== Celebration ==
 
<div class="mw-collapsible mw-collapsed">
 
* [https://www.youtube.com/watch?v=3GwjfUFyY6M Our celebration song]
 
</div>
 

Latest revision as of 21:06, 6 May 2021

5/6/21 This page no longer in use.

For Phase 1 HCO/SR: Phase 1 System Readiness

For Phase 1 Beam Commissioning: Phase 1


404 dog.png