* Current sensor for HV interlock installed and tested, ready for DC power, to set limits, fault test
 
* Current sensor for HV interlock installed and tested, ready for DC power, to set limits, fault test
 
* Current sensor for FSD installed and tested, calibrated for FSD card, ready for DC power, to set limits, fault test
 
* Current sensor for FSD installed and tested, calibrated for FSD card, ready for DC power, to set limits, fault test
* Update drawings and documentation
+
* Update drawings, document
  
 
; Laser jobs
 
; Laser jobs
Line 13: Line 13:
 
* Re-install Hall B amp in permanent location
 
* Re-install Hall B amp in permanent location
 
* Complete macropulse chassis upgrade (replace 18 VDC + booster with 24 VDC, add protection diode to shutters), test all beam modes
 
* Complete macropulse chassis upgrade (replace 18 VDC + booster with 24 VDC, add protection diode to shutters), test all beam modes
 +
* Update drawings, document
 +
 +
; Gun HVPS jobs
 +
  
 
; Wien HVPS
 
; Wien HVPS
Line 18: Line 22:
 
* Install HV Switcher chassis at ISB, complete cabling between rack components
 
* Install HV Switcher chassis at ISB, complete cabling between rack components
 
* Drop/pull HV cables from HV switcher outputs to Wiens
 
* Drop/pull HV cables from HV switcher outputs to Wiens
 +
* Update drawings, document
  
 
; Ion Pump Power Supplies
 
; Ion Pump Power Supplies
Line 25: Line 30:
 
* Work with software to reprogram UHV PS EPICS names, can we have unique identifier from old names?
 
* Work with software to reprogram UHV PS EPICS names, can we have unique identifier from old names?
 
* Re-install (2) HV patch boxes, update box labels, pull HV drop cables to patch boxes, updated labels
 
* Re-install (2) HV patch boxes, update box labels, pull HV drop cables to patch boxes, updated labels
 +
* Update drawings, document
  
 
; Valves
 
; Valves
* Controls for (3) gate valves
+
* Work with I&C and software, controls for (3) valves (note - confirm valve type different)
*  
+
* Build, install, test (3) shut-override boxes for valves
 +
* UHV vacuum fault (series, yes?) shuts all three gate valves, test
 +
* Gun2 valve open required for HV enable; method to jumper/bypass for HV conditioning (i.e. valve closed, but HV enable OK)
 +
* Update drawings, document
  
 
; Air, GN2, LCW
 
; Air, GN2, LCW
 
* Move GN2 near gun lower, hook for air lines, caps for poly hose
 
* Move GN2 near gun lower, hook for air lines, caps for poly hose
 
* Add 2nd GN2 near girder, hook for air lines, caps for poly hose
 
* Add 2nd GN2 near girder, hook for air lines, caps for poly hose
* Fabricate, install air manifold for viewers and valves
+
* Fabricate, install air manifold w/ cutoff for (8) viewers, (2) valves, (2) spares
 
* (done) Re-install LCW manifold
 
* (done) Re-install LCW manifold
 +
 +
; Crash inhibit
 +
* Install, test crash inhibit for pcup and viewer (note - fail safe test, i.e. do NOT hook up air to BOTH devices)
 +
* Install, test crash inhibit for harp and viewer (note - does this exist, would speak to I&C early on)
 +
 +
; Apertures & PCup
 +
* Scribe new aperture stops, bag, store in tunnel, throw away ALL old stops
 +
* Install shoulder bolt on A1, test
 +
* Attach current monitoring w/ inline I&C protection boxes
 +
* Reconnect LCW, I&C check flow meters clear interlock
  
 
; Electrician jobs
 
; Electrician jobs
Line 40: Line 59:
 
* Bond girders (Shaun has holes drilled on girders already for this)
 
* Bond girders (Shaun has holes drilled on girders already for this)
 
* Install cable tray
 
* Install cable tray
 +
 +
; Decarad

Revision as of 06:53, 10 February 2021

Jobs Leading to HCO & Commissioning

15 deg dipole (MDR)
  • Install on beam line after bake out, then align, do we use shims?
  • Current sensor for HV interlock installed and tested, ready for DC power, to set limits, fault test
  • Current sensor for FSD installed and tested, calibrated for FSD card, ready for DC power, to set limits, fault test
  • Update drawings, document
Laser jobs
  • Complete outrigger box, install, test with laser room shutter, update LSOP
  • Flush chiller, decide on PM schedule, fill
  • Re-install Hall B amp in permanent location
  • Complete macropulse chassis upgrade (replace 18 VDC + booster with 24 VDC, add protection diode to shutters), test all beam modes
  • Update drawings, document
Gun HVPS jobs


Wien HVPS
  • (done) Add placards to ISB racks
  • Install HV Switcher chassis at ISB, complete cabling between rack components
  • Drop/pull HV cables from HV switcher outputs to Wiens
  • Update drawings, document
Ion Pump Power Supplies
  • (done) Finalize IP names for songsheet
  • Complete mapping between all IP and power supplies (gun to choppers)
  • Complete UHV power supply upgrade, remove temp PS, spare PS on shelf (identify cabinet area for spares)
  • Work with software to reprogram UHV PS EPICS names, can we have unique identifier from old names?
  • Re-install (2) HV patch boxes, update box labels, pull HV drop cables to patch boxes, updated labels
  • Update drawings, document
Valves
  • Work with I&C and software, controls for (3) valves (note - confirm valve type different)
  • Build, install, test (3) shut-override boxes for valves
  • UHV vacuum fault (series, yes?) shuts all three gate valves, test
  • Gun2 valve open required for HV enable; method to jumper/bypass for HV conditioning (i.e. valve closed, but HV enable OK)
  • Update drawings, document
Air, GN2, LCW
  • Move GN2 near gun lower, hook for air lines, caps for poly hose
  • Add 2nd GN2 near girder, hook for air lines, caps for poly hose
  • Fabricate, install air manifold w/ cutoff for (8) viewers, (2) valves, (2) spares
  • (done) Re-install LCW manifold
Crash inhibit
  • Install, test crash inhibit for pcup and viewer (note - fail safe test, i.e. do NOT hook up air to BOTH devices)
  • Install, test crash inhibit for harp and viewer (note - does this exist, would speak to I&C early on)
Apertures & PCup
  • Scribe new aperture stops, bag, store in tunnel, throw away ALL old stops
  • Install shoulder bolt on A1, test
  • Attach current monitoring w/ inline I&C protection boxes
  • Reconnect LCW, I&C check flow meters clear interlock
Electrician jobs
  • Relocate floor outlets
  • Bond girders (Shaun has holes drilled on girders already for this)
  • Install cable tray
Decarad