CIS Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30)

I&C/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30)

I&C Jobs
  • What to expect in tunnel?
    • Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
    • There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
    • Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable tray (above/below) + 3 cable drops (Y, Laser, Chopper)

* BPMs = Pete estimates 1 person x 5 days for all of the BPM hook-up and pre-beam checkout jobs

    • 10 total - all unrotated
    • 3 new style => NEG coated large bore (2.5" ID); mapped by Musson (Kx/Ky values available)
    • 7 old style => 5.5" long end tapped
  • Viewers
    • 8 total - all chromox except ITV0I02 (YAG)
    • Crash inhibit #1 : ITV0I01 and Polarized Cup IFY0I01
    • Crash inhibit #2 : ITV0I02 and Harp IHA0I02
  • Harps
    • 1 total - IHA0I02 (YAG), on same cross as viewer ITV0I02 (requires crash inhibit)
  • Wien HV
    • Tony status update

* Current Monitoring - Pete estimates 1 person x 3 days for ItoV, Picoammeters, Gun FSD LCW waterflow interlocks)

    • 3 total - same as before (PCUP, A1, A2)
    • PCUP identical as before, just a new location
    • A1 current monitoring as before, linear bellow motion now has STAC5 motor (so remote or manual; has 3 stop positions
    • A2 current monitoring as before, linear bellows manual as before; has 3 stop positions. Used by PSS group for kicker
  • Valves
    • 3 total - all have in-line EPICS shut over ride capability (CIS installs this box)
    • Gun valve - VBV2I01A (new name), otherwise same all metal gate valve
    • Beam line valve - VBV1I07 (same name), same all metal gate valve
    • Beam line valve - VBV0I02 (same name), but now all metal gate valve, requires cable terminations like VBV1I07
    • All 3 valves tied to UHV vacuum fault (100 uA limit)
Software Jobs
  • CED
    • Michele or Gary can gives us an update
  • Apps
    • Injector steering script getting upgrades for Wien/Solenoid controls, also needs update of correctors/bpms
    • Any script that refers to CED elements from Gun to Chopper will need name review, sounds like a big job
  • Screens
    • I guess many screens auto-updated from CED, that's great
    • Like with apps, will need name review; I guess system owners look at their own screens for oddities?
  • What else for software?

Magnet/DC-Power/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30)

DC/Magnet Jobs
Updated MHD field map due from JM/LL to GC
Updated MFX (SW/CW) field map due from RS to GC
Software Jobs
  • CED
  • Apps
  • Screens
  • What else for software?
Other magnet jobs
  • (JM) Complete magnet table I circulated
  • Done(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
  • (RS/GC) FG solenoid special hysteresis for Gary
  • (RS/MJ) Magnet info for Inj Steer spin calculations
  • (JM/JG) Decision on spare DR fabrication and alignment
  • Done (LL/JK/JM) PSS kicker - does MMF have any responsibility here, maybe just PSS?
  • Done (LL/JM) Second QW measurement, what's the scope here?
  • Done (JM) When is the rotating coil stand ready?
  • (JM/LL) Reconciling MHD discrepancy
  • (LL) Report on QW
  • (LL) Report on HD
  • (LL) Report on PSS kicker


System Readiness / HCO Schedule (April '21)

For detailed plans for a given day and week, discussed at 830 toolbox meeting every weekday, see CIS Phase 1 work plans

Format: time: System (# of people)

Updated 4/22

April/May Mon Tue Wed Thu Fri Sa Su
12th - 16th Morning: Valve Controls (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: Valve Controls (1x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: Valve Controls (1x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Magnet Hook-Ups (2x) Magnet Hook-Ups (2x)
19th - 23rd Morning: BPMs (1x)
Morning: Viewers (1x)
Morning: Harps (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: BPMs (1x)
Morning: Viewers (1x)
Morning: Harps (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: BPMs (1x)
Morning: Viewers (1x)
Morning: Harps (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: Diagnostics Hook-ups
as possible; Leak Checks (CIS)
Bake Prep (all)
Afternoon: Leak Checks
Bake Prep (CIS)
Morning: Diagnostics Hook-ups
as possible
Bake Prep (all)
Afternoon: Bake Prep (all)
Magnet Hook-Ups/HCO (2x)?
Magnet Hook-Ups/HCO (2x)?
26th - 30th VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
Magnet HCO (2x)? Magnet HCO (2x)?
3rd - 7th TBD TBD TBD TBD TBD TBD TBD
10th - 14th TBD TBD TBD TBD TBD TBD TBD
  • BPM = Francis
  • Valve Controls = Ketchum
  • ItoV, Picoammeters, Gun FSD Interlocks = Francis
  • Viewers = Norris
  • Harps = Dela Cruz
  • Wien = Dela Cruz
  • Magnet / DC Power = Coleman
  • 2B Alignment = S&A, Gould
  • PSS = Kowal

Beam Commissioning Planning

Documents, Links, Important Dates

Links:

Documents:

Dates: updated 4/7/21

  • Finalize commissioning plan: April 5th
  • Injector HCO/SR Complete: 5/2
  • Injector Beam Commissioning Begins: 5/3
  • NL/Inj -> Stable 2K: 5/21
  • Full CEBAF PSS Certification: 5/24 - 6/11
  • End of SAD: 7/2
  • Resumption of Physics: Mid-August


ATLis Testplans

updated 4/26/21

General / Catch-All Test Plans


With-Beam Hardware Commissioning Test Plans


Beam Commissioning


Optics/RF Test Plans


Spin/Wien Test Plans


Parity Quality Beam Test Plans


Screen Shot 2021-04-26 at 7.49.40 PM.png

Beam Commissioning Schedule

updated 4/28


Beam Commissioning Week #1? -- Earliest possible start date for beam commissioning is 5/10. Actual date may slide.

DAY Shift Monday
5/10
Tuesday
5/11
Wednesday
5/12
Thursday
5/13
Friday
5/14
Sat
5/15
Sun
5/16
Notes/Goals
Beam Commissioning
Plan (ATLis)
pre-beam checks
Gun->Chopper Commissioning @ 130keV, TM (22180)
Gun->Chopper Commissioning @ 130keV, TM (22180) PSS Kicker Cert (22061)
PCup -> FC1 @130keV, TM (22182)
PCup -> FC1 @130keV, TM (22182) PCup -> FC1 @130keV, CW (22182)
/or\ Spot Move Knobs (22184)
Beam Off Beam Off With-beam HCO of
all hardware up to 1D;
TM setup to FC1/1D,
including element centering,
correcting for gun kick;
Early Injector Orbit
Data Collection;
Spot move knobs;
CW Setup to FC1?
Scientist #1 Grames Grames Beam Off Beam Off
Scientist #2 Beam Off Beam Off
Ops Inj Support Forman Moser Forman Forman Forman Beam Off Beam Off
SSO / AM Sweeper Carlino / Jones Carlino / Jones Carlino / Jones Carlino / Jones Carlino / Jones Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2
SWING Shift 5/10 5/11 5/12 5/13 5/14 5/15 5/16
Beam Commissioning Plan / ATLis Gun->Chopper Commissioning @ 130keV, TM (22180) Gun->Chopper Commissioning @ 130keV, TM (22180) PCup -> FC1 @130keV, TM (22182) PCup -> FC1 @130keV, TM (22182)
Early Injector Orbit Data (22181)
PCup -> FC1 @130keV, CW (22182)
/or\,Spot Move Knobs (22184)
Beam Off Beam Off
Scientist #1 Beam Off Beam Off
Scientist #2 Beam Off Beam Off
Ops Inj Support Law Law Law Law Law Beam Off Beam Off
SSO Deir Deir Deir Deir Deir Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC
CCOC / PD Aiken (both) Aiken Merz / Aiken Merz / Aiken Merz / Aiken Merz / Aiken Merz / Aiken


Beam Commissioning Week #2, if no sliding

DAY Shift Monday
5/17
Tuesday
5/18
Wednesday
5/19
Thursday
5/20
Friday
5/21
Sat
5/22
Sun
5/23
Notes/Goals
Beam Commissioning
Plan (ATLis)
PCup -> FC1 @130keV, CW (22182)
/or\ Spot Move Knobs (22184)
PCup -> FC1 @130keV, CW (22182)
PCup vs Gun HVPS Current Cal (22080)
Warm RF Setup @130keV (22190) MDR1I02 Optics vs Rotation (22160) 0I02-YAG Emittance Measurement (22250) Beam Off Beam Off CW Setup to FC1/1D;
Warm RF CW Setup;
1I-0I-region Optics
measurements;
Lifetime measurement?
Scientist #1 Grames Grames Beam Off Beam Off
Scientist #2 Beam Off Beam Off
Ops Inj Support TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off Beam Off
SSO / AM Sweeper Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2
SWING Shift 5/17 5/18 5/19 5/20 5/21 5/22 5/23
Beam Commissioning Plan / ATLis PCup -> FC1 @130keV, CW (22182) Warm RF Setup @130keV (22190) Warm RF Setup @130keV (22190) 1I-0I-region qsUtility @130keV (21923) 1I-0I-region qsUtility @130keV (21923)

Lifetime Measurement @ 130keV (22082)
Beam Off Beam Off
Scientist #1 Beam Off Beam Off
Scientist #2 Beam Off Beam Off
Ops Inj Support TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off Beam Off
SSO Anthony Anthony Anthony Anthony Anthony Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 Beam Off Beam Off
CCOC / PD Merz / Aiken Merz / Aiken Merz / Frierson Merz / Frierson Merz / Frierson Merz / Frierson Merz / Frierson


CEBAF PSS Certifications Week 1/3
Beam Commissioning Week #3, if no sliding

DAY Shift
Monday
5/24
Tuesday
5/25
Wednesday
5/26
Thursday
5/27
Friday
5/28
Sat
5/29
Sun
5/30
Notes/Goals
Beam Commissioning
Plans (ATLis)
TBD TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?
Scientist #1 Beam Off? / TBD Beam Off? / TBD
Scientist #2 Beam Off? / TBD Beam Off? / TBD
Ops Inj Support TBD: {Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 5/24 5/25 5/26 5/27 5/28 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Merz / Frierson Merz / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson


CEBAF PSS Certifications Week 2/3
Beam Commissioning Week #4, if no sliding

DAY Shift
Monday
5/31
Tuesday
6/1
Wednesday
6/2
Thursday
6/3
Friday
6/4
Sat
6/5
Sun
6/6
Notes/Goals
Beam Commissioning
Plans (ATLis)
TBD TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?
Scientist #1 Beam Off? / TBD Beam Off? / TBD
Scientist #2 Beam Off? / TBD Beam Off? / TBD
Ops Inj Support TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 5/31 6/1 6/2 6/3 6/4 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Carlino / Frierson Carlino / Frierson Carlino / Merz Carlino / Merz Carlino / Merz Carlino / Merz Carlino / Merz


CEBAF PSS Certifications Week 3/3
Beam Commissioning Week #5, if no sliding

DAY Shift
Monday
6/7
Tuesday
6/8
Wednesday
6/9
Thursday
6/10
Friday
6/11
Sat
6/12
Sun
6/13
Notes/Goals
Beam Commissioning
Plans (ATLis)
TBD TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?

After PSS Certs
Beam->FC2 possible
Scientist #1 Beam Off? / TBD Beam Off? / TBD
Scientist #2 Beam Off? / TBD Beam Off? / TBD
Ops Inj Support TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 6/7 6/8 6/9 6/10 6/11 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Carlino / Frierson Carlino / Frierson Moser / Merz Moser / Merz Moser / Merz Moser / Merz Moser / Merz


Beam Commissioning Week #6, if no sliding. FC#2 Running Possible. 24/7 Possible.

DAY Shift Monday
6/14
Tuesday
6/15
Wednesday
6/16
Thursday
6/17
Friday
6/18
Sat
6/19
Sun
6/20
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Scientist #1
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/14 6/15 6/16 6/17 6/18 6/19 6/20
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Scientist #1
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD Moser / Merz Moser / Merz Moser / Carlino Moser / Carlino Moser / Carlino Moser / Carlino Moser / Carlino


Beam Commissioning Week #7, if no sliding. FC#2 Running Possible. 24/7 Running Possible.

DAY Shift Monday
6/21
Tuesday
6/22
Wednesday
6/23
Thursday
6/24
Friday
6/25
Sat
6/26
Sun
6/27
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Scientist #1
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/21 6/22 6/23 6/24 6/25 6/26 6/27
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Scientist #1
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD Moser / Carlino Moser / Carlino TBD / Carlino TBD / Carlino TBD / Carlino TBD / Carlino TBD / Carlino


Beam Commissioning Week #8, if no sliding. FC#2 running possible. 24/7 running possible.

DAY Shift Monday
6/28
Tuesday
6/29
Wednesday
6/30
Thursday
7/1
Friday
7/2
Sat
7/3
Sun
7/4
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Scientist #1
Scientist #2
Ops Inj Support TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/28 6/29 6/30 7/1 7/2 7/3 7/4
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Scientist #1
Scientist #2
Ops Inj Support TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD TBD / Carlino TBD / Carlino TBD / TBD TBD / TBD TBD / TBD TBD / TBD TBD / TBD

Celebration