==Jobs Leading to HCO & Commissioning ==
+
5/6/21 This page no longer in use.
  
 +
For Phase 1 HCO/SR: [[Phase 1 System Readiness]]
  
; 15 deg dipole (MDR)
+
For Phase 1 Beam Commissioning: [[Phase 1]]
* Install on beam line after bake out, then align, do we use shims?
 
* Current sensor for HV interlock installed and tested, ready for DC power, to set limits, fault test
 
* Current sensor for FSD installed and tested, calibrated for FSD card, ready for DC power, to set limits, fault test
 
* Update drawings and documentation
 
  
; Laser jobs
 
* Complete outrigger box, install, test with laser room shutter, update LSOP
 
* Flush chiller, decide on PM schedule, fill
 
* Re-install Hall B amp in permanent location
 
* Complete macropulse chassis upgrade (replace 18 VDC + booster with 24 VDC, add protection diode to shutters), test all beam modes
 
  
; Wien HVPS
+
[[File:404 dog.png|1000px]]
* (done) Add placards to ISB racks
 
* Install HV Switcher chassis at ISB, complete cabling between rack components
 
* Drop/pull HV cables from HV switcher outputs to Wiens
 
 
 
; Ion Pump Power Supplies
 
* (done) Finalize IP names for songsheet
 
* Complete mapping between all IP and power supplies (gun to choppers)
 
* Complete UHV power supply upgrade, remove temp PS, spare PS on shelf (identify cabinet area for spares)
 
* Work with software to reprogram UHV PS EPICS names, can we have unique identifier from old names?
 
* Re-install (2) HV patch boxes, update box labels, pull HV drop cables to patch boxes, updated labels
 
 
 
; Valves
 
* Controls for (3) gate valves
 
*
 
 
 
; Air, GN2, LCW
 
* Move GN2 near gun lower, hook for air lines, caps for poly hose
 
* Add 2nd GN2 near girder, hook for air lines, caps for poly hose
 
* Fabricate, install air manifold for viewers and valves
 
* (done) Re-install LCW manifold
 
 
 
; Electrician jobs
 
* Relocate floor outlets
 
* Bond girders (Shaun has holes drilled on girders already for this)
 
* Install cable tray
 

Latest revision as of 21:06, 6 May 2021

5/6/21 This page no longer in use.

For Phase 1 HCO/SR: Phase 1 System Readiness

For Phase 1 Beam Commissioning: Phase 1