Difference between revisions of "Phase 1 - HCO & Commissioning"

From Ciswikidb
Jump to: navigation, search
(Beam Commissioning Schedule)
 
(152 intermediate revisions by 2 users not shown)
Line 1: Line 1:
 
==CIS Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30) ==  
 
==CIS Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30) ==  
<div class="mw-collapsible mw-collapsed">
 
 
; 15 deg dipole (Scott)
 
* '''(Scott working with CAD/DCG)''' Update drawings and document
 
 
; Laser jobs (Shukui/Scott)
 
* '''(Shaun...)''' Complete outrigger box, install, test with laser room shutter
 
* '''(Shukui)''' Update LSOP
 
* '''(Shukui/Amali)''' Install/align Pockels cell
 
* '''(Shukui)''' Re-install Hall B amp in permanent location
 
* '''(Scott)''' Complete macropulse chassis upgrade, test all beam modes
 
 
; Gun HVPS jobs (Carlos/Bubba/Scott)
 
* '''(Bubba/Phil by 3/9)''' Re-install bracket
 
* '''(Carlos/Bubba by 3/9 DONE)''' Regrease ceramic after bake
 
* '''(Scott/Joe after PSS HV cert)''' Remove old HV parts (150kV glassman, old HV interlock chassis, VME interface card)
 
* '''(Scott/Joe working...)''' Pull additional Anode bias HV cable near Glassman rack
 
* '''(Draft done)''' Develop HV commissioning plan/staffing [[Media:Gun2 Tee electrode 200kV HV codnitoning plan 2021 draft01.pptx]]
 
* '''(Carlos)''' Guidelines for ramping the gun voltage / HV conditioning to (>?) 130 kV under VACUUM conditions. [[Media:CEBAF Gun HV processing guidelines March 2021.docx]]
 
 
; Wien HVPS
 
* '''(Tony/Carlos)''' Drop/pull HV cables from HV switcher outputs to Wiens
 
* '''(Riad)''' InjSteer screens check/test with Gary and Michelle updates with HVPS and new PS epics values, tested, ready
 
* '''(Carlos wrap up with engineering)''' drawings, document
 
 
; Ion Pump Power Supplies [[media:210209_ion pump names.xlsx]]
 
* '''(Scott)''' Re-install (2) HV patch boxes, update box labels, pull HV drop cables to patch boxes, updated labels
 
* '''(Scott)''' Update screens, labels, drawings, document
 
 
; Vacuum
 
* '''(Marcy/Phil)''' A1/A2 : Install, leak check, bake, leak check
 
* '''(Marcy/Phil)''' Wien : Install, leak check, bake, leak check
 
* '''(Marcy)''' Add extractor gauge to y chamber port
 
* '''(Marcy)''' Fab cable for Y-NEG activation
 
* '''(Marcy/Phil)''' Activate DP can downstream FC#1
 
* '''(Marcy)''' Set final IP voltages (no FE'ers)
 
* '''(Joe test by 3/12)''' see if cathode activates in prep chamber. If not, bake (No water in RGA scan)
 
 
; Valves
 
* '''(Scott)''' HCO UHV vacuum fault
 
* '''(Scott)''' Update drawings, labels, document
 
 
; Air, GN2, LCW
 
* '''(Phil/Bubba)''' Fabricate, install air manifold w/ cutoff for (8) viewers, (2) valves, (2) spares
 
* '''(Ricky to fasten)''' Fasten LCW to pedestals
 
 
; Crash inhibit
 
* '''(Tony/Phil)''' Install, test crash inhibit for pcup and viewer (note - fail safe test, i.e. do NOT hook up air to BOTH devices)
 
* '''(Tony/Phil)''' Install, test crash inhibit for harp and viewer (note - does this exist, would speak to I&C early on)
 
 
; Apertures & PCup
 
* '''(Scott after bake)''' Terminate A1 cable, drive motor, test shoulder bolt
 
* '''(Phil)''' Put new scribed aperture stops in bag in tunnel
 
* '''(Pete/Phil)''' Attach current monitoring w/ inline I&C protection boxes
 
* '''(Pete/Phil)''' Reconnect LCW, I&C check flow meters clear interlock
 
 
; Electrician jobs
 
* '''(Electricians/Scott)''' Bond girders
 
* '''(Scott working on this)''' Install cable tray on girders
 
  
; Decarad
+
* 4/19/21 - Updated punchlist [[media:210419_CIS_HCO.docx]]
* '''(Scott)''' Install/cable 1 chassis, (5) for Carlos, (5) for Joe
+
* 4/06/21 - Updated punchlist [[media:210406_CIS_HCO.docx]]
 
+
* 3/22/21 - Updated punchlist [[media:210322_CIS_HCO_v2.docx]]
</div>
+
  
 
==I&C/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30) ==
 
==I&C/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30) ==
Line 126: Line 66:
  
 
; DC/Magnet Jobs
 
; DC/Magnet Jobs
 +
* Spreadsheet updated 3/15 [[media:210315_Phase1_Magnet_Summary.xlsx]]
 +
::Updated MHD field map due from JM/LL to GC
 +
::Updated MFX (SW/CW) field map due from RS to GC
 
* Spreadsheet updated after further feedback [[media:210301_Phase1_Magnet_Summary_v3.xlsx]]
 
* Spreadsheet updated after further feedback [[media:210301_Phase1_Magnet_Summary_v3.xlsx]]
 
* Spreadsheet updated at 3/1 SAD planning meeting [[media:210301_Phase1_Magnet_Summary_v2.xlsx]]
 
* Spreadsheet updated at 3/1 SAD planning meeting [[media:210301_Phase1_Magnet_Summary_v2.xlsx]]
Line 137: Line 80:
  
 
; Other magnet jobs
 
; Other magnet jobs
*(JM) Complete magnet table I circulated
+
* (JM) Complete magnet table I circulated
*(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
+
* '''Done'''(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
*(RS/GC) FG solenoid special hysteresis for Gary
+
* (RS/GC) FG solenoid special hysteresis for Gary
*(RS/MJ) Magnet info for Inj Steer spin calculations
+
* (RS/MJ) Magnet info for Inj Steer spin calculations
*(JM/JG) Decision on spare DR fabrication and alignment
+
* (JM/JG) Decision on spare DR fabrication and alignment
*(LL/JK/JM) PSS kicker -  does MMF have any responsibility here, maybe just PSS?
+
* '''Done''' (LL/JK/JM) PSS kicker -  does MMF have any responsibility here, maybe just PSS?
*(LL/JM) Second QW measurement, what's the scope here?
+
* '''Done''' (LL/JM) Second QW measurement, what's the scope here?
*(JM) When is the rotating coil stand ready?
+
* '''Done''' (JM) When is the rotating coil stand ready?
*(JM/LL) Reconciling MHD discrepancy
+
* (JM/LL) Reconciling MHD discrepancy
*(LL) Report on QW
+
* (LL) Report on QW
*(LL) Report on HD
+
* (LL) Report on HD
*(LL) Report on PSS kicker
+
* (LL) Report on PSS kicker
  
  
 
</div>
 
</div>
  
== System Readiness / HCO Schedule (Apr 5 - Apr 30) ==  
+
== System Readiness / HCO Schedule (April '21) ==  
 +
<div class="mw-collapsible">
 +
 
 +
'''For detailed plans for a given day and week, discussed at 830 toolbox meeting every weekday, see [[CIS Phase 1 work plans]]'''
 +
 
 +
'''Format:''' time: System (# of people)
 +
 
 
<div class="mw-collapsible mw-collapsed">
 
<div class="mw-collapsible mw-collapsed">
 +
 +
'''Updated 4/22'''
 +
 
{| class="wikitable" style="text-align: center"
 
{| class="wikitable" style="text-align: center"
 
|-  
 
|-  
! style="background-color:#CFDCCA" | !! style="background-color:#CFDCCA" | Mon  !! style="background-color:#CFDCCA" |  Tue !! style="background-color:#CFDCCA" |  Wed !! style="background-color:#CFDCCA" |  Thu !! style="background-color:#CFDCCA" |  Fri 3/19 !! style="background-color:#CFDCCA" |  Sa 3/19 !! style="background-color:#CFDCCA" |  Su
+
! style="background-color: #eca1a6" | '''April/May''' !! style="background-color:#eca1a6" | Mon  !! style="background-color:#eca1a6" |  Tue !! style="background-color:#eca1a6" |  Wed !! style="background-color:#eca1a6" |  Thu !! style="background-color:#eca1a6" |  Fri !! style="background-color:#ada397" |  Sa !! style="background-color:#ada397" |  Su
|- style="background-color:#AFDCEA"  
+
|- style="background-color:#d6cbd3"  
| '''5a - 8a''' || M || T || W || R || F || Sa || Su
+
| ! style="background-color:#eca1a6" | '''12th - 16th''' || Morning: Valve Controls (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: Valve Controls (1x) <br> Morning: ItoV, Pico, FSD (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: Valve Controls (1x) <br> Morning: ItoV, Pico, FSD (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: ItoV, Pico, FSD (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: ItoV, Pico, FSD (1x) <br> Afternoon: Magnet Hook-Ups (2x) || !! style="background-color:#ada397" | Magnet Hook-Ups (2x) || !! style="background-color:#ada397" | Magnet Hook-Ups (2x)
|- style="background-color:#BFDCDA"  
+
|- style="background-color:#bdcebe"  
| '''8a - noon''' || M || T || W || R || F || Sa || Su
+
| ! style="background-color:#eca1a6" | '''19th - 23rd''' || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Morning: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Morning: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Morning: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: Diagnostics Hook-ups <br> ''as possible''; Leak Checks (CIS) <br> Bake Prep (all) <br> Afternoon: Leak Checks <br> Bake Prep (CIS) || Morning: Diagnostics Hook-ups <br> ''as possible'' <br> Bake Prep (all) <br> Afternoon: Bake Prep (all) || !! style="background-color:#ada397" | ''Magnet Hook-Ups/HCO (2x)?'' <br> || !! style="background-color:#ada397" | ''Magnet Hook-Ups/HCO (2x)?''
|- style="background-color:#BFDCDA"
+
|- style="background-color:#d6cbd3"
| '''noon - 4p || M || T || W || R || F || Sa || Su
+
| ! style="background-color:#eca1a6" | '''26th - 30th''' || '''VBV1I070->0I07 Bake''' <br> Opportunistic Hook-ups <br> ''as possible'' || '''VBV1I070->0I07 Bake''' <br> Opportunistic Hook-ups <br> ''as possible'' || '''VBV1I070->0I07 Bake''' <br> Opportunistic Hook-ups <br> ''as possible'' || '''VBV1I070->0I07 Bake''' <br> Opportunistic Hook-ups <br> ''as possible'' || '''VBV1I070->0I07 Bake''' <br> Opportunistic Hook-ups <br> ''as possible'' || !! style="background-color:#ada397" | ''Magnet HCO (2x)?'' || !! style="background-color:#ada397" | ''Magnet HCO (2x)?''
|- style="background-color:#BFDCDA"
+
|- style="background-color:#bdcebe"
| '''4p+ swings''' || M || T || W || R || F || Sa || Su
+
| ! style="background-color:#eca1a6" | '''3rd - 7th''' || TBD || TBD || TBD || TBD || TBD || !! style="background-color:#ada397" | TBD || !! style="background-color:#ada397" | TBD
|- style="background-color:#BFDCDA"
+
|- style="background-color:#bdcebe"
| '''owls''' || M || T || W || R || F || Sa || Su
+
| ! style="background-color:#eca1a6" | '''10th - 14th''' || TBD || TBD || TBD || TBD || TBD || !! style="background-color:#ada397" | TBD || !! style="background-color:#ada397" | TBD
 +
|- style="background-color:#bdcebe"
 
|}
 
|}
 +
 +
* BPM = Francis
 +
* Valve Controls = Ketchum
 +
* ItoV, Picoammeters, Gun FSD Interlocks = Francis
 +
* Viewers = Norris
 +
* Harps = Dela Cruz
 +
* Wien = Dela Cruz
 +
* Magnet / DC Power = Coleman
 +
* 2B Alignment = S&A, Gould
 +
* PSS = Kowal
  
 
</div>
 
</div>
  
== Beam Commissioning (May 3 - Jul 2) ==
+
</div>
 +
 
 +
== Beam Commissioning ==
 +
<div class="mw-collapsible">
 +
 
 +
===Shift Quick References===
 +
<div class="mw-collapsible">
 +
* Tracking / Catch-All Phase I Beam Commissioning ATLis: [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22060 22060]
 +
* [https://jeffersonlab.sharepoint.com/sites/CEBAFInjectorSetupProceduresDevelopment Injector Procedures Workspace]
 +
 
 +
 
 +
* 8AM Meeting: https://bluejeans.com/569476853
 +
* 830 Injector Morning Toolbox Meeting: https://bluejeans.com/171126028
 +
* 1530 Injector Afternoon Toolbox Meeting: https://bluejeans.com/171126028
 +
 
 +
 
 +
* On-Call Support: http://opsweb.acc.jlab.org/CSUEApps/weboncall/WebOnCallMain.html
 +
** Day shift, full on-call support
 +
** Swing shift, show-stopper on-call support, with maintenance punchlist (please log!) for items that can wait until next day
 +
* SAD Calendar: https://accweb.acc.jlab.org/calendar/
 +
* CEBAF Restart gaant chart: https://www.jlab.org/accel/ops/ganttproject/2021/2021_Recovery_MA_20210414-chart.html
 +
 
 +
 
 +
* Injector Quick reference, Rev17beta, Draft 5 [[media:12GeV_injector_quick_reference_rev17_DRAFT-5.pdf]]
 +
* AIPINJ Wiki: [[CEBAF Injector Upgrade]]
 +
 
 +
 
 +
===ATLis Testplans===
 
<div class="mw-collapsible mw-collapsed">
 
<div class="mw-collapsible mw-collapsed">
 +
''updated 4/26/21''
  
 +
General / Catch-All Test Plans
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22060 22060 Beam Commissioning AIPINJ Phase I (general ATLis)]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21170 21170 Injector Upgrade - Phase 1 Installation (Gun to Chopper)]
  
=== Important Dates ===
+
 
''updated 3/15/21''
+
With-Beam Hardware Commissioning Test Plans
* Finalize commissioning plan: 4/5
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22061 22061 PSS Kicker Tests @ 130keV & 200keV]
* Injector HCO/SR Complete: 5/3
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22080 22080 AIPINJ: 130/200 keV HVPS vs. PCUP current monitor calibration]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22082 22082 AIPINJ: 130/200 keV lifetime measurements]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22313 22313 Compare Beam Transmission for Gun Biased at 130 and 200kV]
 +
 +
 
 +
Beam Commissioning
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22180 22180 Gun to Chopper Commissioning _130keV / 200keV beam to PCup]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22181 22181 Early Injector Orbit Data Collection Rev. April/May 2021]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182 Set up beam from PCup to FC1 at 130keV]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22183 22183 Beam steer from FC1 to FC2]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22184 22184 Efficacy of Knobs chosen for spot move correction]
 +
 
 +
 
 +
Optics/RF Test Plans
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21923 21923 Perform 130keV emittance measurements and matching as part of Injector Upgrade commissioning]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22072 22072 Perform 200keV emittance measurements and matching as part of Injector Upgrade commissioning]
 +
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=19784 19784 Test multiwire emittance measurement with beam]
 +
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22160 22160 Measure optics at various coil fixture rotation angles for MDR1I02]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22190 22190 RF Elements Setup (Injector Upgrade Phase 1), Lasers phases, Prebuncher, and Choppers]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22250 22250 0I02 Viewer vs Harp Emittance Measurement]
 +
 
 +
 
 +
Spin/Wien Test Plans
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22090 22090 Mott Hot Checkout]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22091 22091 Spin Dance to Calibrate Upgraded CEBAF Injector 3D Spin Rotator]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22092 22092 Set 3D Spin Rotator: Flip-Right, Flip-Left, and Vertical Polarizarion]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22083 22083 AIPINJ: Test new hysteresis function for spin solenoids (MFG1I04A/B)]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22084 22084 AIPINJ: 130/200 keV E/B calibrations for V-Wien and H-Wien]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22330 22330 Measuring time of flight to chopper master slit versus Wien spin angle]
 +
 
 +
 
 +
Parity Quality Beam Test Plans
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22040 22040 cathode 45deg rotation and spot moves]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22050 22050 130keV sensitivity test]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22051 22051 200keV sensitivity test]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22052 22052 Transmission test gun 200keV]
 +
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22053 22053 RTP pos diff feedback convergence FC2 test]
 +
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22120 22120 Chopper scan 130keV]
 +
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22121 22121 Chopper scan 200keV]
 +
 
 +
 
 +
;ATLiss Arranged in Table
 +
<div class="mw-collapsible mw-collapsed">
 +
[[File:Screen Shot 2021-04-26 at 7.49.40 PM.png | 1001px]]
 +
 
 +
</div>
 +
 
 +
</div>
 +
 
 +
;Other Docs/Links
 +
<div class="mw-collapsible mw-collapsed">
 +
* [https://wiki.jlab.org/ciswiki/index.php/January_25,_2021_-_Weekly_Commissioning_Meetings 1/25/21 Beam Drivers Preliminary Meeting]
 +
* (5/4/21) Phase 1 Settings for 130kV [[media:UIPhase1Settings130kV_2021.pdf]]
 +
* 3/16/21 Beam Drivers Meeting Slides [[media:BeamDrivers_Pt2_3.16.21.pdf]]
 +
* Injector Group Beam Commissioning Slides [[file:BeamINJphase1v5.pptx]]
 +
* Commissioning Checklist (Grames) [[file:210401_Phase1_Commissioning.docx]]
 +
 
 +
 
 +
</div>
 +
 
 +
;Typical Commissioning Day
 +
For weekdays up to PSS Certification beginning M 5/24: <br>
 +
Lock-up each morning after maintenance punchlist from previous day addressed. <br>
 +
4p: Shift turnover from days -> swings. <br>
 +
Each night, 12p, Injector -> Restricted Access. <br><br>
 +
 
 +
;Beam Parameter Scaling (130kV -> 200kV)
 +
<div class="mw-collapsible mw-collapsed">
 +
Table goes here. Forthcoming.
 +
 
 +
</div>
 +
 
 +
;Important Dates
 +
<div class="mw-collapsible mw-collapsed">
 +
 
 +
''updated 5/4/21''
 +
* '''Finalize commissioning plan: April 5th'''
 +
* Injector HCO/SR Complete: 5/10 at the earliest
 +
* Injector Beam Commissioning Begins: 5/10 at the earliest
 
* NL/Inj -> Stable 2K: 5/21
 
* NL/Inj -> Stable 2K: 5/21
 
* Full CEBAF PSS Certification: 5/24 - 6/11
 
* Full CEBAF PSS Certification: 5/24 - 6/11
Line 185: Line 257:
 
* Resumption of Physics: Mid-August
 
* Resumption of Physics: Mid-August
  
=== Activities ===
+
</div>
''updated 3/1/21''
+
  
[[File:Commissioning testplans Rev2.png | 999px]]
 
  
 +
</div>
  
=== ATLis Testplans ===
+
== Beam Commissioning Schedule ==
''updated 3/1/21''
+
<div class="mw-collapsible">
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21911 21911 Gun high voltage conditioning]
+
'''updated 5/4'''
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21923 21923 Perform 130keV emittance measurements and matching as part of Injector Upgrade commissioning]
+
  
 +
 +
Beam Commissioning Week #1? -- Earliest possible start date for beam commissioning is 5/10. Actual date may slide.
 +
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift
 +
! style="background-color:#87bdd8;" | Monday <br />5/10 <br>
 +
! style="background-color:#87bdd8;" | Tuesday <br />5/11
 +
! style="background-color:#87bdd8;" | Wednesday<br />5/12
 +
! style="background-color:#87bdd8;" | Thursday <br />5/13
 +
! style="background-color:#87bdd8;" | Friday<br />5/14
 +
! style="background-color:#87bdd8;" | Sat<br />5/15
 +
! style="background-color:#87bdd8;" | Sun<br />5/16
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br> Plan (ATLis)
 +
| pre-beam checks<br />Gun->Chopper Commissioning @ 130keV, TM (22180)
 +
| Gun->Chopper Commissioning @ 130keV, TM (22180)
 +
| PSS Kicker Cert (22061)<br />PCup -> FC1 @130keV, TM (22182)
 +
| PCup -> FC1 @130keV, TM (22182)
 +
| PCup -> FC1 @130keV, CW (22182)<br /> /or\  Spot Move Knobs (22184)
 +
| Beam Off
 +
| Beam Off
 +
| rowspan="14" | With-beam HCO of <br> all hardware up to 1D;<br />TM setup to FC1/1D, <br> including element centering, <br>correcting for gun kick; <br />Early Injector Orbit <br> Data Collection; <br />Spot move knobs;<br />CW Setup to FC1?
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
| Grames
 +
|
 +
| Grames
 +
|
 +
|
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
| Bruker
 +
| Bruker
 +
| Bruker
 +
| Hernandez-Garcia
 +
| Hernandez-Garcia
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| Forman
 +
| Moser
 +
| Forman
 +
| Forman
 +
| Forman
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| Carlino / Jones
 +
| Carlino / Jones
 +
| Carlino / Jones
 +
| Carlino / Jones
 +
| Carlino / Jones
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
| NL PSS Commissioning, SSG, +2
 +
| NL PSS Commissioning, SSG, +2
 +
| NL PSS Commissioning, SSG, +2
 +
| NL PSS Commissioning, SSG, +2
 +
| NL PSS Commissioning, SSG, +2
 +
|
 +
|
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 5/10
 +
| 5/11
 +
| 5/12
 +
| 5/13
 +
| 5/14
 +
| 5/15
 +
| 5/16
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
 +
| Gun->Chopper Commissioning @ 130keV, TM (22180)
 +
| Gun->Chopper Commissioning @ 130keV, TM (22180)
 +
| PCup -> FC1 @130keV, TM (22182)
 +
| PCup -> FC1 @130keV, TM (22182)<br />Early Injector Orbit Data (22181)
 +
| PCup -> FC1 @130keV, CW (22182)<br /> /or\,Spot Move Knobs (22184)
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
 +
| Law
 +
| Law
 +
| Law
 +
| Law
 +
| Law
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | SSO
 +
| Deir
 +
| Deir
 +
| Deir
 +
| Deir
 +
| Deir
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Aiken (both)
 +
| Aiken
 +
| Merz / Aiken
 +
| Merz / Aiken
 +
| Merz / Aiken
 +
| Merz / Aiken
 +
| Merz / Aiken
 +
|}
 +
 +
 +
Beam Commissioning Week #2, if no sliding
 +
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift
 +
! style="background-color:#87bdd8;" | Monday <br />5/17
 +
! style="background-color:#87bdd8;" | Tuesday <br />5/18
 +
! style="background-color:#87bdd8;" | Wednesday<br />5/19
 +
! style="background-color:#87bdd8;" | Thursday <br />5/20
 +
! style="background-color:#87bdd8;" | Friday<br />5/21
 +
! style="background-color:#87bdd8;" | Sat<br />5/22
 +
! style="background-color:#87bdd8;" | Sun<br />5/23
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br />Plan (ATLis)
 +
| PCup -> FC1 @130keV, CW (22182)<br />/or\  Spot Move Knobs (22184)
 +
| PCup -> FC1 @130keV, CW (22182)<br />PCup vs Gun HVPS Current Cal (22080)
 +
| Warm RF Setup @130keV (22190)
 +
| MDR1I02 Optics vs Rotation (22160)
 +
| 0I02-YAG Emittance Measurement (22250)
 +
| Beam Off
 +
| Beam Off
 +
| rowspan="14" | CW Setup to FC1/1D;<br />Warm RF CW Setup;<br />1I-0I-region Optics<br />measurements;<br />Lifetime measurement?
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
| Grames
 +
|
 +
| Grames
 +
|
 +
|
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
| Bruker
 +
| Bruker
 +
| Bruker
 +
| Hernandez-Garcia
 +
| Hernandez-Garcia
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| Forman
 +
| Forman
 +
| Forman
 +
| Forman
 +
| Forman
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Beam Off
 +
| Beam Off
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
| ''NL PSS Commissioning, SSG, +2''
 +
| ''NL PSS Commissioning, SSG, +2''
 +
| ''NL PSS Commissioning, SSG, +2''
 +
| ''NL PSS Commissioning, SSG, +2''
 +
| ''NL PSS Commissioning, SSG, +2''
 +
|
 +
|
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 5/17
 +
| 5/18
 +
| 5/19
 +
| 5/20
 +
| 5/21
 +
| 5/22
 +
| 5/23
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
 +
| PCup -> FC1 @130keV, CW (22182) <br> ''1I-0I-region qsUtility @130keV (21923)?''
 +
| Warm RF Setup @130keV (22190)
 +
| Warm RF Setup @130keV (22190) <br> ''MDR1I02 Optics vs Rotation (22160)?''
 +
| 1I-0I-region qsUtility @130keV (21923)
 +
| 1I-0I-region qsUtility @130keV (21923)<br /><br />Lifetime Measurement @ 130keV (22082)
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 +
|
 +
|
 +
| Turner
 +
|
 +
| Turner
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 +
| Turner
 +
|
 +
|
 +
|
 +
|
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
 +
| Law
 +
| Law
 +
| Law
 +
| Law
 +
| Law
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | SSO
 +
| Anthony
 +
| Anthony
 +
| Anthony
 +
| Anthony
 +
| Anthony
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
 +
| ''NL Lock-Up/Commissioning, SSG, +2''
 +
| ''NL Lock-Up/Commissioning, SSG, +2''
 +
| ''NL Lock-Up/Commissioning, SSG, +2''
 +
| ''NL Lock-Up/Commissioning, SSG, +2''
 +
| ''NL Lock-Up/Commissioning, SSG, +2''
 +
| Beam Off
 +
| Beam Off
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Merz / Aiken
 +
| Merz / Aiken
 +
| Merz / Frierson
 +
| Merz / Frierson
 +
| Merz / Frierson
 +
| Merz / Frierson
 +
| Merz / Frierson
 +
|}
 +
 +
 +
'''CEBAF PSS Certifications Week 1/3''' <br> Beam Commissioning Week #3, if no sliding
 +
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#CFE0E8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift<br />
 +
! style="background-color:#87bdd8;" | Monday <br />5/24
 +
! style="background-color:#87bdd8;" | Tuesday <br />5/25
 +
! style="background-color:#87bdd8;" | Wednesday<br />5/26
 +
! style="background-color:#87bdd8;" | Thursday <br />5/27
 +
! style="background-color:#87bdd8;" | Friday<br />5/28
 +
! style="background-color:#87bdd8;" | Sat<br />5/29
 +
! style="background-color:#87bdd8;" | Sun<br />5/30
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning<br /> Plans (ATLis)
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| rowspan="10" | Beam Commissioning<br />on Day Shift ONLY<br />during the week.<br />Weekend?
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| TBD: {Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 5/24
 +
| 5/25
 +
| 5/26
 +
| 5/27
 +
| 5/28
 +
| style="background-color:#B7D7E8; font-weight:normal;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8; font-weight:normal;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS CERTIFICATION
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS Test Director
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
| style="background-color:#B7D7E8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Merz / Frierson
 +
| Merz / Frierson
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
|}
 +
 +
 +
'''CEBAF PSS Certifications Week 2/3''' <br> Beam Commissioning Week #4, if no sliding
 +
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#CFE0E8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift<br />
 +
! style="background-color:#87bdd8;" | Monday 5/31<br />Memorial Day 🇺🇸
 +
! style="background-color:#87bdd8;" | Tuesday <br />6/1
 +
! style="background-color:#87bdd8;" | Wednesday<br />6/2
 +
! style="background-color:#87bdd8;" | Thursday <br />6/3
 +
! style="background-color:#87bdd8;" | Friday<br />6/4
 +
! style="background-color:#87bdd8;" | Sat<br />6/5
 +
! style="background-color:#87bdd8;" | Sun<br />6/6
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br />Plans (ATLis)
 +
| No Beam
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| rowspan="10" | Beam Commissioning<br />on Day Shift ONLY<br />during the week.<br />Weekend?
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
| No Beam
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
| No beam
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| No Beam
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| No Beam
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| Gauthier / Moser
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 5/31 🇺🇸
 +
| 6/1
 +
| 6/2
 +
| 6/3
 +
| 6/4
 +
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS CERTIFICATION
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS Test Director
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
| Carlino / Merz
 +
| Carlino / Merz
 +
| Carlino / Merz
 +
| style="background-color:#daebe8;" | Carlino / Merz
 +
| style="background-color:#daebe8;" | Carlino / Merz
 +
|}
 +
 +
 +
'''CEBAF PSS Certifications Week 3/3''' <br> Beam Commissioning Week #5, if no sliding
 +
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#CFE0E8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift<br />
 +
! style="background-color:#87bdd8;" | Monday <br />6/7
 +
! style="background-color:#87bdd8;" | Tuesday <br />6/8
 +
! style="background-color:#87bdd8;" | Wednesday<br />6/9
 +
! style="background-color:#87bdd8;" | Thursday <br />6/10
 +
! style="background-color:#87bdd8;" | Friday<br />6/11
 +
! style="background-color:#87bdd8;" | Sat<br />6/12
 +
! style="background-color:#87bdd8;" | Sun<br />6/13
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br />Plans (ATLis)
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| rowspan="10" | Beam Commissioning<br />on Day Shift ONLY<br />during the week.<br />Weekend? <br> <br> After PSS Certs <br> Beam->FC2 possible
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| TBD: {Forman, Law, Moser}
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| Garcia / Moser
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|-
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 6/7
 +
| 6/8
 +
| 6/9
 +
| 6/10
 +
| 6/11
 +
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS CERTIFICATION
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| PSS Certification
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | PSS Test Director
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| Aiken
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
| style="background-color:#b7d7e8;" | Beam Off? / TBD
 +
|- style="background-color:#DAEBE8;"
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Carlino / Frierson
 +
| Carlino / Frierson
 +
| Moser / Merz
 +
| Moser / Merz
 +
| Moser / Merz
 +
| style="background-color:#daebe8;" | Moser / Merz
 +
| style="background-color:#daebe8;" | Moser / Merz
 +
|}
 +
 +
 +
Beam Commissioning Week #6, if no sliding. FC#2 Running Possible. 24/7 Possible.
 +
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift
 +
! style="background-color:#87bdd8;" | Monday <br />6/14
 +
! style="background-color:#87bdd8;" | Tuesday <br />6/15
 +
! style="background-color:#87bdd8;" | Wednesday<br />6/16
 +
! style="background-color:#87bdd8;" | Thursday <br />6/17
 +
! style="background-color:#87bdd8;" | Friday<br />6/18
 +
! style="background-color:#87bdd8;" | Sat<br />6/19
 +
! style="background-color:#87bdd8;" | Sun<br />6/20
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br /> Plan (ATLis)
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| rowspan="14" | TBD
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 6/14
 +
| 6/15
 +
| 6/16
 +
| 6/17
 +
| 6/18
 +
| 6/19
 +
| 6/20
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | SSO
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Moser / Merz
 +
| Moser / Merz
 +
| Moser / Carlino
 +
| Moser / Carlino
 +
| Moser / Carlino
 +
| Moser / Carlino
 +
| Moser / Carlino
 +
|}
 +
 +
 +
Beam Commissioning Week #7, if no sliding. FC#2 Running Possible. 24/7 Running Possible.
 +
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift
 +
! style="background-color:#87bdd8;" | Monday <br />6/21
 +
! style="background-color:#87bdd8;" | Tuesday <br />6/22
 +
! style="background-color:#87bdd8;" | Wednesday<br />6/23
 +
! style="background-color:#87bdd8;" | Thursday <br />6/24
 +
! style="background-color:#87bdd8;" | Friday<br />6/25
 +
! style="background-color:#87bdd8;" | Sat<br />6/26
 +
! style="background-color:#87bdd8;" | Sun<br />6/27
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br /> Plan (ATLis)
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| rowspan="14" | TBD
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 6/21
 +
| 6/22
 +
| 6/23
 +
| 6/24
 +
| 6/25
 +
| 6/26
 +
| 6/27
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | SSO
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| Moser / Carlino
 +
| Moser / Carlino
 +
| TBD / Carlino
 +
| TBD / Carlino
 +
| TBD / Carlino
 +
| TBD / Carlino
 +
| TBD / Carlino
 +
|}
 +
 +
 +
Beam Commissioning Week #8, if no sliding. FC#2 running possible. 24/7 running possible.
 +
 +
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 +
|- style="font-weight:bold; background-color:#87BDD8;"
 +
! style="background-color:#87bdd8;" | DAY Shift
 +
! style="background-color:#87bdd8;" | Monday <br />6/28
 +
! style="background-color:#87bdd8;" | Tuesday <br />6/29
 +
! style="background-color:#87bdd8;" | Wednesday<br />6/30
 +
! style="background-color:#87bdd8;" | Thursday <br />7/1
 +
! style="background-color:#87bdd8;" | Friday<br />7/2
 +
! style="background-color:#87bdd8;" | Sat<br />7/3
 +
! style="background-color:#87bdd8;" | Sun<br />7/4
 +
! style="background-color:#87bdd8;" | Notes/Goals
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br /> Plan (ATLis)
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| rowspan="14" | TBD
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|- style="background-color:#CFE0E8;"
 +
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|- style="font-weight:bold; background-color:#70AAAF;"
 +
| SWING Shift
 +
| 6/28
 +
| 6/29
 +
| 6/30
 +
| 7/1
 +
| 7/2
 +
| 7/3
 +
| 7/4
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
| TBD: {Moser, Forman, Law}
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | SSO
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
| TBD
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|
 +
|-
 +
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
 +
| TBD / Carlino
 +
| TBD / Carlino
 +
| TBD / TBD
 +
| TBD / TBD
 +
| TBD / TBD
 +
| TBD / TBD
 +
| TBD / TBD
 +
|}
  
 
</div>
 
</div>

Latest revision as of 15:47, 4 May 2021

CIS Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30)

I&C/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30)

I&C Jobs
  • What to expect in tunnel?
    • Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
    • There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
    • Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable tray (above/below) + 3 cable drops (Y, Laser, Chopper)

* BPMs = Pete estimates 1 person x 5 days for all of the BPM hook-up and pre-beam checkout jobs

    • 10 total - all unrotated
    • 3 new style => NEG coated large bore (2.5" ID); mapped by Musson (Kx/Ky values available)
    • 7 old style => 5.5" long end tapped
  • Viewers
    • 8 total - all chromox except ITV0I02 (YAG)
    • Crash inhibit #1 : ITV0I01 and Polarized Cup IFY0I01
    • Crash inhibit #2 : ITV0I02 and Harp IHA0I02
  • Harps
    • 1 total - IHA0I02 (YAG), on same cross as viewer ITV0I02 (requires crash inhibit)
  • Wien HV
    • Tony status update

* Current Monitoring - Pete estimates 1 person x 3 days for ItoV, Picoammeters, Gun FSD LCW waterflow interlocks)

    • 3 total - same as before (PCUP, A1, A2)
    • PCUP identical as before, just a new location
    • A1 current monitoring as before, linear bellow motion now has STAC5 motor (so remote or manual; has 3 stop positions
    • A2 current monitoring as before, linear bellows manual as before; has 3 stop positions. Used by PSS group for kicker
  • Valves
    • 3 total - all have in-line EPICS shut over ride capability (CIS installs this box)
    • Gun valve - VBV2I01A (new name), otherwise same all metal gate valve
    • Beam line valve - VBV1I07 (same name), same all metal gate valve
    • Beam line valve - VBV0I02 (same name), but now all metal gate valve, requires cable terminations like VBV1I07
    • All 3 valves tied to UHV vacuum fault (100 uA limit)
Software Jobs
  • CED
    • Michele or Gary can gives us an update
  • Apps
    • Injector steering script getting upgrades for Wien/Solenoid controls, also needs update of correctors/bpms
    • Any script that refers to CED elements from Gun to Chopper will need name review, sounds like a big job
  • Screens
    • I guess many screens auto-updated from CED, that's great
    • Like with apps, will need name review; I guess system owners look at their own screens for oddities?
  • What else for software?

Magnet/DC-Power/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30)

DC/Magnet Jobs
Updated MHD field map due from JM/LL to GC
Updated MFX (SW/CW) field map due from RS to GC
Software Jobs
  • CED
  • Apps
  • Screens
  • What else for software?
Other magnet jobs
  • (JM) Complete magnet table I circulated
  • Done(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
  • (RS/GC) FG solenoid special hysteresis for Gary
  • (RS/MJ) Magnet info for Inj Steer spin calculations
  • (JM/JG) Decision on spare DR fabrication and alignment
  • Done (LL/JK/JM) PSS kicker - does MMF have any responsibility here, maybe just PSS?
  • Done (LL/JM) Second QW measurement, what's the scope here?
  • Done (JM) When is the rotating coil stand ready?
  • (JM/LL) Reconciling MHD discrepancy
  • (LL) Report on QW
  • (LL) Report on HD
  • (LL) Report on PSS kicker


System Readiness / HCO Schedule (April '21)

For detailed plans for a given day and week, discussed at 830 toolbox meeting every weekday, see CIS Phase 1 work plans

Format: time: System (# of people)

Updated 4/22

April/May Mon Tue Wed Thu Fri Sa Su
12th - 16th Morning: Valve Controls (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: Valve Controls (1x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: Valve Controls (1x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Magnet Hook-Ups (2x) Magnet Hook-Ups (2x)
19th - 23rd Morning: BPMs (1x)
Morning: Viewers (1x)
Morning: Harps (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: BPMs (1x)
Morning: Viewers (1x)
Morning: Harps (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: BPMs (1x)
Morning: Viewers (1x)
Morning: Harps (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: Diagnostics Hook-ups
as possible; Leak Checks (CIS)
Bake Prep (all)
Afternoon: Leak Checks
Bake Prep (CIS)
Morning: Diagnostics Hook-ups
as possible
Bake Prep (all)
Afternoon: Bake Prep (all)
Magnet Hook-Ups/HCO (2x)?
Magnet Hook-Ups/HCO (2x)?
26th - 30th VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
Magnet HCO (2x)? Magnet HCO (2x)?
3rd - 7th TBD TBD TBD TBD TBD TBD TBD
10th - 14th TBD TBD TBD TBD TBD TBD TBD
  • BPM = Francis
  • Valve Controls = Ketchum
  • ItoV, Picoammeters, Gun FSD Interlocks = Francis
  • Viewers = Norris
  • Harps = Dela Cruz
  • Wien = Dela Cruz
  • Magnet / DC Power = Coleman
  • 2B Alignment = S&A, Gould
  • PSS = Kowal

Beam Commissioning

Shift Quick References





ATLis Testplans

updated 4/26/21

General / Catch-All Test Plans


With-Beam Hardware Commissioning Test Plans


Beam Commissioning


Optics/RF Test Plans


Spin/Wien Test Plans


Parity Quality Beam Test Plans


ATLiss Arranged in Table

Screen Shot 2021-04-26 at 7.49.40 PM.png

Other Docs/Links


Typical Commissioning Day

For weekdays up to PSS Certification beginning M 5/24:
Lock-up each morning after maintenance punchlist from previous day addressed.
4p: Shift turnover from days -> swings.
Each night, 12p, Injector -> Restricted Access.

Beam Parameter Scaling (130kV -> 200kV)

Table goes here. Forthcoming.

Important Dates

updated 5/4/21

  • Finalize commissioning plan: April 5th
  • Injector HCO/SR Complete: 5/10 at the earliest
  • Injector Beam Commissioning Begins: 5/10 at the earliest
  • NL/Inj -> Stable 2K: 5/21
  • Full CEBAF PSS Certification: 5/24 - 6/11
  • End of SAD: 7/2
  • Resumption of Physics: Mid-August


Beam Commissioning Schedule

updated 5/4


Beam Commissioning Week #1? -- Earliest possible start date for beam commissioning is 5/10. Actual date may slide.

DAY Shift Monday
5/10
Tuesday
5/11
Wednesday
5/12
Thursday
5/13
Friday
5/14
Sat
5/15
Sun
5/16
Notes/Goals
Beam Commissioning
Plan (ATLis)
pre-beam checks
Gun->Chopper Commissioning @ 130keV, TM (22180)
Gun->Chopper Commissioning @ 130keV, TM (22180) PSS Kicker Cert (22061)
PCup -> FC1 @130keV, TM (22182)
PCup -> FC1 @130keV, TM (22182) PCup -> FC1 @130keV, CW (22182)
/or\ Spot Move Knobs (22184)
Beam Off Beam Off With-beam HCO of
all hardware up to 1D;
TM setup to FC1/1D,
including element centering,
correcting for gun kick;
Early Injector Orbit
Data Collection;
Spot move knobs;
CW Setup to FC1?
Shift Leader Grames Grames Beam Off Beam Off
Scientist #2 Bruker Bruker Bruker Hernandez-Garcia Hernandez-Garcia Beam Off Beam Off
Ops Inj Support Forman Moser Forman Forman Forman Beam Off Beam Off
SSO / AM Sweeper Carlino / Jones Carlino / Jones Carlino / Jones Carlino / Jones Carlino / Jones Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2
SWING Shift 5/10 5/11 5/12 5/13 5/14 5/15 5/16
Beam Commissioning Plan / ATLis Gun->Chopper Commissioning @ 130keV, TM (22180) Gun->Chopper Commissioning @ 130keV, TM (22180) PCup -> FC1 @130keV, TM (22182) PCup -> FC1 @130keV, TM (22182)
Early Injector Orbit Data (22181)
PCup -> FC1 @130keV, CW (22182)
/or\,Spot Move Knobs (22184)
Beam Off Beam Off
Shift Leader Beam Off Beam Off
Scientist #2 Beam Off Beam Off
Ops Inj Support Law Law Law Law Law Beam Off Beam Off
SSO Deir Deir Deir Deir Deir Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC
CCOC / PD Aiken (both) Aiken Merz / Aiken Merz / Aiken Merz / Aiken Merz / Aiken Merz / Aiken


Beam Commissioning Week #2, if no sliding

DAY Shift Monday
5/17
Tuesday
5/18
Wednesday
5/19
Thursday
5/20
Friday
5/21
Sat
5/22
Sun
5/23
Notes/Goals
Beam Commissioning
Plan (ATLis)
PCup -> FC1 @130keV, CW (22182)
/or\ Spot Move Knobs (22184)
PCup -> FC1 @130keV, CW (22182)
PCup vs Gun HVPS Current Cal (22080)
Warm RF Setup @130keV (22190) MDR1I02 Optics vs Rotation (22160) 0I02-YAG Emittance Measurement (22250) Beam Off Beam Off CW Setup to FC1/1D;
Warm RF CW Setup;
1I-0I-region Optics
measurements;
Lifetime measurement?
Shift Leader Grames Grames Beam Off Beam Off
Scientist #2 Bruker Bruker Bruker Hernandez-Garcia Hernandez-Garcia Beam Off Beam Off
Ops Inj Support Forman Forman Forman Forman Forman Beam Off Beam Off
SSO / AM Sweeper Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2
SWING Shift 5/17 5/18 5/19 5/20 5/21 5/22 5/23
Beam Commissioning Plan / ATLis PCup -> FC1 @130keV, CW (22182)
1I-0I-region qsUtility @130keV (21923)?
Warm RF Setup @130keV (22190) Warm RF Setup @130keV (22190)
MDR1I02 Optics vs Rotation (22160)?
1I-0I-region qsUtility @130keV (21923) 1I-0I-region qsUtility @130keV (21923)

Lifetime Measurement @ 130keV (22082)
Beam Off Beam Off
Shift Leader Turner Turner Beam Off Beam Off
Scientist #2 Turner Beam Off Beam Off
Ops Inj Support Law Law Law Law Law Beam Off Beam Off
SSO Anthony Anthony Anthony Anthony Anthony Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 Beam Off Beam Off
CCOC / PD Merz / Aiken Merz / Aiken Merz / Frierson Merz / Frierson Merz / Frierson Merz / Frierson Merz / Frierson


CEBAF PSS Certifications Week 1/3
Beam Commissioning Week #3, if no sliding

DAY Shift
Monday
5/24
Tuesday
5/25
Wednesday
5/26
Thursday
5/27
Friday
5/28
Sat
5/29
Sun
5/30
Notes/Goals
Beam Commissioning
Plans (ATLis)
TBD TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?
Shift Leader Beam Off? / TBD Beam Off? / TBD
Scientist #2 Beam Off? / TBD Beam Off? / TBD
Ops Inj Support TBD: {Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 5/24 5/25 5/26 5/27 5/28 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Merz / Frierson Merz / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson


CEBAF PSS Certifications Week 2/3
Beam Commissioning Week #4, if no sliding

DAY Shift
Monday 5/31
Memorial Day 🇺🇸
Tuesday
6/1
Wednesday
6/2
Thursday
6/3
Friday
6/4
Sat
6/5
Sun
6/6
Notes/Goals
Beam Commissioning
Plans (ATLis)
No Beam TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?
Shift Leader No Beam Beam Off? / TBD Beam Off? / TBD
Scientist #2 No beam Beam Off? / TBD Beam Off? / TBD
Ops Inj Support No Beam TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper No Beam Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 5/31 🇺🇸 6/1 6/2 6/3 6/4 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Carlino / Frierson Carlino / Frierson Carlino / Merz Carlino / Merz Carlino / Merz Carlino / Merz Carlino / Merz


CEBAF PSS Certifications Week 3/3
Beam Commissioning Week #5, if no sliding

DAY Shift
Monday
6/7
Tuesday
6/8
Wednesday
6/9
Thursday
6/10
Friday
6/11
Sat
6/12
Sun
6/13
Notes/Goals
Beam Commissioning
Plans (ATLis)
TBD TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?

After PSS Certs
Beam->FC2 possible
Shift Leader Beam Off? / TBD Beam Off? / TBD
Scientist #2 Beam Off? / TBD Beam Off? / TBD
Ops Inj Support TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 6/7 6/8 6/9 6/10 6/11 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Carlino / Frierson Carlino / Frierson Moser / Merz Moser / Merz Moser / Merz Moser / Merz Moser / Merz


Beam Commissioning Week #6, if no sliding. FC#2 Running Possible. 24/7 Possible.

DAY Shift Monday
6/14
Tuesday
6/15
Wednesday
6/16
Thursday
6/17
Friday
6/18
Sat
6/19
Sun
6/20
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/14 6/15 6/16 6/17 6/18 6/19 6/20
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD Moser / Merz Moser / Merz Moser / Carlino Moser / Carlino Moser / Carlino Moser / Carlino Moser / Carlino


Beam Commissioning Week #7, if no sliding. FC#2 Running Possible. 24/7 Running Possible.

DAY Shift Monday
6/21
Tuesday
6/22
Wednesday
6/23
Thursday
6/24
Friday
6/25
Sat
6/26
Sun
6/27
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/21 6/22 6/23 6/24 6/25 6/26 6/27
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD Moser / Carlino Moser / Carlino TBD / Carlino TBD / Carlino TBD / Carlino TBD / Carlino TBD / Carlino


Beam Commissioning Week #8, if no sliding. FC#2 running possible. 24/7 running possible.

DAY Shift Monday
6/28
Tuesday
6/29
Wednesday
6/30
Thursday
7/1
Friday
7/2
Sat
7/3
Sun
7/4
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/28 6/29 6/30 7/1 7/2 7/3 7/4
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD TBD / Carlino TBD / Carlino TBD / TBD TBD / TBD TBD / TBD TBD / TBD TBD / TBD

Celebration