==CIS Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30) ==
+
5/6/21 This page no longer in use.
  
* 4/19/21 - Updated punchlist [[media:210419_CIS_HCO.docx]]
+
For Phase 1 HCO/SR: [[Phase 1 System Readiness]]  
* 4/06/21 - Updated punchlist [[media:210406_CIS_HCO.docx]]
+
* 3/22/21 - Updated punchlist [[media:210322_CIS_HCO_v2.docx]]
+
  
==I&C/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30) ==
+
For Phase 1 Beam Commissioning: [[Phase 1]]
<div class="mw-collapsible mw-collapsed">
+
  
; I&C Jobs
 
* What to expect in tunnel?
 
** Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
 
** There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
 
** Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable tray (above/below) + 3 cable drops (Y, Laser, Chopper)
 
  
'''* BPMs = Pete estimates 1 person x 5  days for all of the BPM hook-up and pre-beam checkout jobs'''
+
[[File:404 dog.png|1000px]]
** 10 total - all unrotated
+
** 3 new style => NEG coated large bore (2.5" ID); mapped by Musson (Kx/Ky values available)
+
** 7 old style => 5.5" long end tapped
+
 
+
* Viewers
+
** 8 total  - all chromox except ITV0I02 (YAG)
+
** Crash inhibit #1 : ITV0I01 and Polarized Cup IFY0I01
+
** Crash inhibit #2 : ITV0I02 and Harp IHA0I02
+
 
+
* Harps
+
** 1 total - IHA0I02 (YAG), on same cross as viewer ITV0I02 (requires crash inhibit)
+
 
+
* Wien HV
+
** Tony status update
+
 
+
'''* Current Monitoring - Pete estimates 1 person x 3 days for ItoV, Picoammeters, Gun FSD LCW waterflow interlocks)'''
+
** 3 total - same as before (PCUP, A1, A2)
+
** PCUP identical as before, just a new location
+
** A1 current monitoring as before, linear bellow motion now has STAC5 motor (so remote or manual; has 3 stop positions
+
** A2 current monitoring as before, linear bellows manual as before; has 3 stop positions.  Used by PSS group for kicker
+
 
+
* Valves
+
** 3 total - all have in-line EPICS shut over ride capability (CIS installs this box)
+
** Gun valve - VBV2I01A (new name), otherwise same all metal gate valve
+
** Beam line valve - VBV1I07 (same name), same all metal gate valve
+
** Beam line valve - VBV0I02 (same name), but now all metal gate valve, requires cable terminations like VBV1I07
+
** All 3 valves tied to UHV vacuum fault (100 uA limit)
+
 
+
* Ion pumps
+
** Marcy's final list [[media:210209_ion pump names.xlsx]]
+
 
+
; Software Jobs
+
* CED
+
** Michele or Gary can gives us an update
+
 
+
* Apps
+
** Injector steering script getting upgrades for Wien/Solenoid controls, also needs update of correctors/bpms
+
** Any script that refers to CED elements from Gun to Chopper will need name review, sounds like a big job
+
 
+
* Screens
+
** I guess many screens auto-updated from CED, that's great
+
** Like with apps, will need name review; I guess system owners look at their own screens for oddities?
+
 
+
* What else for software?
+
 
+
</div>
+
 
+
==Magnet/DC-Power/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30) ==
+
<div class="mw-collapsible mw-collapsed">
+
 
+
; DC/Magnet Jobs
+
* Spreadsheet updated 3/15 [[media:210315_Phase1_Magnet_Summary.xlsx]]
+
::Updated MHD field map due from JM/LL to GC
+
::Updated MFX (SW/CW) field map due from RS to GC
+
* Spreadsheet updated after further feedback [[media:210301_Phase1_Magnet_Summary_v3.xlsx]]
+
* Spreadsheet updated at 3/1 SAD planning meeting [[media:210301_Phase1_Magnet_Summary_v2.xlsx]]
+
* Spreadsheet initially [[media:210301_Phase1_Magnet_Summary.xlsx]]
+
 
+
; Software Jobs
+
* CED
+
* Apps
+
* Screens
+
* What else for software?
+
 
+
; Other magnet jobs
+
* (JM) Complete magnet table I circulated
+
* '''Done'''(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
+
* (RS/GC) FG solenoid special hysteresis for Gary
+
* (RS/MJ) Magnet info for Inj Steer spin calculations
+
* (JM/JG) Decision on spare DR fabrication and alignment
+
* '''Done''' (LL/JK/JM) PSS kicker -  does MMF have any responsibility here, maybe just PSS?
+
* '''Done''' (LL/JM) Second QW measurement, what's the scope here?
+
* '''Done''' (JM) When is the rotating coil stand ready?
+
* (JM/LL) Reconciling MHD discrepancy
+
* (LL) Report on QW
+
* (LL) Report on HD
+
* (LL) Report on PSS kicker
+
 
+
 
+
</div>
+
 
+
== System Readiness / HCO Schedule (April '21) ==
+
<div class="mw-collapsible">
+
 
+
'''For detailed plans for a given day and week, discussed at 830 toolbox meeting every weekday, see [[CIS Phase 1 work plans]]'''
+
 
+
'''Format:''' time: System (# of people)
+
 
+
<div class="mw-collapsible mw-collapsed">
+
 
+
'''Updated 4/22'''
+
 
+
{| class="wikitable" style="text-align: center"
+
|-
+
! style="background-color: #eca1a6" | '''April/May''' !! style="background-color:#eca1a6" | Mon  !! style="background-color:#eca1a6" |  Tue !! style="background-color:#eca1a6" |  Wed !! style="background-color:#eca1a6" |  Thu !! style="background-color:#eca1a6" |  Fri !! style="background-color:#ada397" |  Sa !! style="background-color:#ada397" |  Su
+
|- style="background-color:#d6cbd3"
+
| ! style="background-color:#eca1a6" | '''12th - 16th''' || Morning: Valve Controls (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: Valve Controls (1x) <br> Morning: ItoV, Pico, FSD (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: Valve Controls (1x) <br> Morning: ItoV, Pico, FSD (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: ItoV, Pico, FSD (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: ItoV, Pico, FSD (1x) <br> Afternoon: Magnet Hook-Ups (2x) || !! style="background-color:#ada397" | Magnet Hook-Ups (2x) || !! style="background-color:#ada397" | Magnet Hook-Ups (2x)
+
|- style="background-color:#bdcebe"
+
| ! style="background-color:#eca1a6" | '''19th - 23rd'''  || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Morning: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Morning: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) || Morning: BPMs (1x) <br> Morning: Viewers (1x) <br> Morning: Harps (1x) <br> Afternoon: Magnet Hook-Ups (2x) ||  Morning: Diagnostics Hook-ups <br> ''as possible''; Leak Checks (CIS) <br> Bake Prep (all) <br> Afternoon: Leak Checks <br> Bake Prep (CIS) || Morning: Diagnostics Hook-ups <br> ''as possible'' <br> Bake Prep (all) <br> Afternoon: Bake Prep (all) || !! style="background-color:#ada397" | ''Magnet Hook-Ups/HCO (2x)?'' <br> || !! style="background-color:#ada397" | ''Magnet Hook-Ups/HCO (2x)?''
+
|- style="background-color:#d6cbd3"
+
| ! style="background-color:#eca1a6" | '''26th - 30th''' || '''VBV1I070->0I07 Bake''' <br> Opportunistic Hook-ups <br> ''as possible'' || '''VBV1I070->0I07 Bake''' <br> Opportunistic Hook-ups <br> ''as possible'' || '''VBV1I070->0I07 Bake''' <br> Opportunistic Hook-ups <br> ''as possible'' || '''VBV1I070->0I07 Bake''' <br> Opportunistic Hook-ups <br> ''as possible'' || '''VBV1I070->0I07 Bake''' <br> Opportunistic Hook-ups <br> ''as possible'' || !! style="background-color:#ada397" | ''Magnet HCO (2x)?'' || !! style="background-color:#ada397" | ''Magnet HCO (2x)?''
+
|- style="background-color:#bdcebe"
+
| ! style="background-color:#eca1a6" | '''3rd - 7th''' || TBD || TBD || TBD || TBD || TBD || !! style="background-color:#ada397" | TBD || !! style="background-color:#ada397" | TBD
+
|- style="background-color:#bdcebe"
+
| ! style="background-color:#eca1a6" | '''10th - 14th''' || TBD || TBD || TBD || TBD || TBD || !! style="background-color:#ada397" | TBD || !! style="background-color:#ada397" | TBD
+
|- style="background-color:#bdcebe"
+
|}
+
 
+
* BPM = Francis
+
* Valve Controls = Ketchum
+
* ItoV, Picoammeters, Gun FSD Interlocks = Francis
+
* Viewers = Norris
+
* Harps = Dela Cruz
+
* Wien = Dela Cruz
+
* Magnet / DC Power = Coleman
+
* 2B Alignment = S&A, Gould
+
* PSS = Kowal
+
 
+
</div>
+
 
+
</div>
+
 
+
== Beam Commissioning ==
+
<div class="mw-collapsible">
+
 
+
===Shift Quick References===
+
<div class="mw-collapsible">
+
* Tracking / Catch-All Phase I Beam Commissioning ATLis: [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22060 22060]
+
* [https://jeffersonlab.sharepoint.com/sites/CEBAFInjectorSetupProceduresDevelopment Injector Procedures Workspace]
+
 
+
 
+
* 8AM Meeting: https://bluejeans.com/569476853
+
* 830 Injector Morning Toolbox Meeting: https://bluejeans.com/171126028
+
* 1530 Injector Afternoon Toolbox Meeting: https://bluejeans.com/171126028
+
 
+
 
+
* On-Call Support: http://opsweb.acc.jlab.org/CSUEApps/weboncall/WebOnCallMain.html
+
** Day shift, full on-call support
+
** Swing shift, show-stopper on-call support, with maintenance punchlist (please log!) for items that can wait until next day
+
* SAD Calendar: https://accweb.acc.jlab.org/calendar/
+
* CEBAF Restart gaant chart: https://www.jlab.org/accel/ops/ganttproject/2021/2021_Recovery_MA_20210414-chart.html
+
 
+
 
+
* Injector Quick reference, Rev17beta, Draft 5 [[media:12GeV_injector_quick_reference_rev17_DRAFT-5.pdf]]
+
* AIPINJ Wiki: [[CEBAF Injector Upgrade]]
+
 
+
 
+
===ATLis Testplans===
+
<div class="mw-collapsible mw-collapsed">
+
''updated 4/26/21''
+
 
+
General / Catch-All Test Plans
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22060 22060 Beam Commissioning AIPINJ Phase I (general ATLis)]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21170 21170 Injector Upgrade - Phase 1 Installation (Gun to Chopper)]
+
 
+
 
+
With-Beam Hardware Commissioning Test Plans
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22061 22061 PSS Kicker Tests @ 130keV & 200keV]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22080 22080 AIPINJ: 130/200 keV HVPS vs. PCUP current monitor calibration]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22082 22082 AIPINJ: 130/200 keV lifetime measurements]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22313 22313 Compare Beam Transmission for Gun Biased at 130 and 200kV]
+
+
 
+
Beam Commissioning
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22180 22180 Gun to Chopper Commissioning _130keV / 200keV beam to PCup]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22181 22181 Early Injector Orbit Data Collection Rev. April/May 2021]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182 Set up beam from PCup to FC1 at 130keV]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22183 22183 Beam steer from FC1 to FC2]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22184 22184 Efficacy of Knobs chosen for spot move correction]
+
 
+
 
+
Optics/RF Test Plans
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21923 21923 Perform 130keV emittance measurements and matching as part of Injector Upgrade commissioning]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22072 22072 Perform 200keV emittance measurements and matching as part of Injector Upgrade commissioning]
+
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=19784 19784 Test multiwire emittance measurement with beam]
+
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/task/22160 22160 Measure optics at various coil fixture rotation angles for MDR1I02]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22190 22190 RF Elements Setup (Injector Upgrade Phase 1), Lasers phases, Prebuncher, and Choppers]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22250 22250 0I02 Viewer vs Harp Emittance Measurement]
+
 
+
 
+
Spin/Wien Test Plans
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22090 22090 Mott Hot Checkout]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22091 22091 Spin Dance to Calibrate Upgraded CEBAF Injector 3D Spin Rotator]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22092 22092 Set 3D Spin Rotator: Flip-Right, Flip-Left, and Vertical Polarizarion]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22083 22083 AIPINJ: Test new hysteresis function for spin solenoids (MFG1I04A/B)]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22084 22084 AIPINJ: 130/200 keV E/B calibrations for V-Wien and H-Wien]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22330 22330 Measuring time of flight to chopper master slit versus Wien spin angle]
+
 
+
 
+
Parity Quality Beam Test Plans
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22040 22040 cathode 45deg rotation and spot moves]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22050 22050 130keV sensitivity test]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22051 22051 200keV sensitivity test]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22052 22052 Transmission test gun 200keV]
+
* [http://devweb.acc.jlab.org/CSUEApps/atlis/task/22053 22053 RTP pos diff feedback convergence FC2 test]
+
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22120 22120 Chopper scan 130keV]
+
* [http://opsweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22121 22121 Chopper scan 200keV]
+
 
+
 
+
;ATLiss Arranged in Table
+
<div class="mw-collapsible mw-collapsed">
+
[[File:Screen Shot 2021-04-26 at 7.49.40 PM.png | 1001px]]
+
 
+
</div>
+
 
+
</div>
+
 
+
;Other Docs/Links
+
<div class="mw-collapsible mw-collapsed">
+
* [https://wiki.jlab.org/ciswiki/index.php/January_25,_2021_-_Weekly_Commissioning_Meetings 1/25/21 Beam Drivers Preliminary Meeting]
+
* (5/4/21) Phase 1 Settings for 130kV [[media:UIPhase1Settings130kV_2021.pdf]]
+
* 3/16/21 Beam Drivers Meeting Slides [[media:BeamDrivers_Pt2_3.16.21.pdf]]
+
* Injector Group Beam Commissioning Slides [[file:BeamINJphase1v5.pptx]]
+
* Commissioning Checklist (Grames) [[file:210401_Phase1_Commissioning.docx]]
+
 
+
 
+
</div>
+
 
+
;Typical Commissioning Day
+
For weekdays up to PSS Certification beginning M 5/24: <br>
+
Lock-up each morning after maintenance punchlist from previous day addressed. <br>
+
4p: Shift turnover from days -> swings. <br>
+
Each night, 12p, Injector -> Restricted Access. <br><br>
+
 
+
;Beam Parameter Scaling (130kV -> 200kV)
+
<div class="mw-collapsible mw-collapsed">
+
Table goes here. Forthcoming.
+
 
+
</div>
+
 
+
;Important Dates
+
<div class="mw-collapsible mw-collapsed">
+
 
+
''updated 5/4/21''
+
* '''Finalize commissioning plan: April 5th'''
+
* Injector HCO/SR Complete: 5/10 at the earliest
+
* Injector Beam Commissioning Begins: 5/10 at the earliest
+
* NL/Inj -> Stable 2K: 5/21
+
* Full CEBAF PSS Certification: 5/24 - 6/11
+
* End of SAD: 7/2
+
* Resumption of Physics: Mid-August
+
 
+
</div>
+
 
+
 
+
</div>
+
 
+
== Beam Commissioning Schedule ==
+
<div class="mw-collapsible">
+
'''updated 5/4'''
+
 
+
 
+
Beam Commissioning Week #1? -- Earliest possible start date for beam commissioning is 5/10. Actual date may slide.
+
 
+
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
+
|- style="font-weight:bold; background-color:#87BDD8;"
+
! style="background-color:#87bdd8;" | DAY Shift
+
! style="background-color:#87bdd8;" | Monday <br />5/10 <br>
+
! style="background-color:#87bdd8;" | Tuesday <br />5/11
+
! style="background-color:#87bdd8;" | Wednesday<br />5/12
+
! style="background-color:#87bdd8;" | Thursday <br />5/13
+
! style="background-color:#87bdd8;" | Friday<br />5/14
+
! style="background-color:#87bdd8;" | Sat<br />5/15
+
! style="background-color:#87bdd8;" | Sun<br />5/16
+
! style="background-color:#87bdd8;" | Notes/Goals
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br> Plan (ATLis)
+
| pre-beam checks<br />Gun->Chopper Commissioning @ 130keV, TM (22180)
+
| Gun->Chopper Commissioning @ 130keV, TM (22180)
+
| PSS Kicker Cert (22061)<br />PCup -> FC1 @130keV, TM (22182)
+
| PCup -> FC1 @130keV, TM (22182)
+
| PCup -> FC1 @130keV, CW (22182)<br /> /or\  Spot Move Knobs (22184)
+
| Beam Off
+
| Beam Off
+
| rowspan="14" | With-beam HCO of <br> all hardware up to 1D;<br />TM setup to FC1/1D, <br> including element centering, <br>correcting for gun kick; <br />Early Injector Orbit <br> Data Collection; <br />Spot move knobs;<br />CW Setup to FC1?
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
+
| Grames
+
|
+
| Grames
+
|
+
|
+
| Beam Off
+
| Beam Off
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
+
| Bruker
+
| Bruker
+
| Bruker
+
| Hernandez-Garcia
+
| Hernandez-Garcia
+
| Beam Off
+
| Beam Off
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
+
| Forman
+
| Moser
+
| Forman
+
| Forman
+
| Forman
+
| Beam Off
+
| Beam Off
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
+
| Carlino / Jones
+
| Carlino / Jones
+
| Carlino / Jones
+
| Carlino / Jones
+
| Carlino / Jones
+
| Beam Off
+
| Beam Off
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
+
| NL PSS Commissioning, SSG, +2
+
| NL PSS Commissioning, SSG, +2
+
| NL PSS Commissioning, SSG, +2
+
| NL PSS Commissioning, SSG, +2
+
| NL PSS Commissioning, SSG, +2
+
|
+
|
+
|- style="font-weight:bold; background-color:#70AAAF;"
+
| SWING Shift
+
| 5/10
+
| 5/11
+
| 5/12
+
| 5/13
+
| 5/14
+
| 5/15
+
| 5/16
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
+
| Gun->Chopper Commissioning @ 130keV, TM (22180)
+
| Gun->Chopper Commissioning @ 130keV, TM (22180)
+
| PCup -> FC1 @130keV, TM (22182)
+
| PCup -> FC1 @130keV, TM (22182)<br />Early Injector Orbit Data (22181)
+
| PCup -> FC1 @130keV, CW (22182)<br /> /or\,Spot Move Knobs (22184)
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
+
|
+
|
+
|
+
|
+
|
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
+
|
+
|
+
|
+
|
+
|
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
+
| Law
+
| Law
+
| Law
+
| Law
+
| Law
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | SSO
+
| Deir
+
| Deir
+
| Deir
+
| Deir
+
| Deir
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
+
| Aiken (both)
+
| Aiken
+
| Merz / Aiken
+
| Merz / Aiken
+
| Merz / Aiken
+
| Merz / Aiken
+
| Merz / Aiken
+
|}
+
 
+
 
+
Beam Commissioning Week #2, if no sliding
+
 
+
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
+
|- style="font-weight:bold; background-color:#87BDD8;"
+
! style="background-color:#87bdd8;" | DAY Shift
+
! style="background-color:#87bdd8;" | Monday <br />5/17
+
! style="background-color:#87bdd8;" | Tuesday <br />5/18
+
! style="background-color:#87bdd8;" | Wednesday<br />5/19
+
! style="background-color:#87bdd8;" | Thursday <br />5/20
+
! style="background-color:#87bdd8;" | Friday<br />5/21
+
! style="background-color:#87bdd8;" | Sat<br />5/22
+
! style="background-color:#87bdd8;" | Sun<br />5/23
+
! style="background-color:#87bdd8;" | Notes/Goals
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br />Plan (ATLis)
+
| PCup -> FC1 @130keV, CW (22182)<br />/or\  Spot Move Knobs (22184)
+
| PCup -> FC1 @130keV, CW (22182)<br />PCup vs Gun HVPS Current Cal (22080)
+
| Warm RF Setup @130keV (22190)
+
| MDR1I02 Optics vs Rotation (22160)
+
| 0I02-YAG Emittance Measurement (22250)
+
| Beam Off
+
| Beam Off
+
| rowspan="14" | CW Setup to FC1/1D;<br />Warm RF CW Setup;<br />1I-0I-region Optics<br />measurements;<br />Lifetime measurement?
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
+
| Grames
+
|
+
| Grames
+
|
+
|
+
| Beam Off
+
| Beam Off
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
+
| Bruker
+
| Bruker
+
| Bruker
+
| Hernandez-Garcia
+
| Hernandez-Garcia
+
| Beam Off
+
| Beam Off
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
+
| Forman
+
| Forman
+
| Forman
+
| Forman
+
| Forman
+
| Beam Off
+
| Beam Off
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
+
| Gauthier / Moser
+
| Gauthier / Moser
+
| Gauthier / Moser
+
| Gauthier / Moser
+
| Gauthier / Moser
+
| Beam Off
+
| Beam Off
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
+
| ''NL PSS Commissioning, SSG, +2''
+
| ''NL PSS Commissioning, SSG, +2''
+
| ''NL PSS Commissioning, SSG, +2''
+
| ''NL PSS Commissioning, SSG, +2''
+
| ''NL PSS Commissioning, SSG, +2''
+
|
+
|
+
|- style="font-weight:bold; background-color:#70AAAF;"
+
| SWING Shift
+
| 5/17
+
| 5/18
+
| 5/19
+
| 5/20
+
| 5/21
+
| 5/22
+
| 5/23
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
+
| PCup -> FC1 @130keV, CW (22182) <br> ''1I-0I-region qsUtility @130keV (21923)?''
+
| Warm RF Setup @130keV (22190)
+
| Warm RF Setup @130keV (22190) <br> ''MDR1I02 Optics vs Rotation (22160)?''
+
| 1I-0I-region qsUtility @130keV (21923)
+
| 1I-0I-region qsUtility @130keV (21923)<br /><br />Lifetime Measurement @ 130keV (22082)
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
+
|
+
|
+
| Turner
+
|
+
| Turner
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
+
| Turner
+
|
+
|
+
|
+
|
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
+
| Law
+
| Law
+
| Law
+
| Law
+
| Law
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | SSO
+
| Anthony
+
| Anthony
+
| Anthony
+
| Anthony
+
| Anthony
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
+
| ''NL Lock-Up/Commissioning, SSG, +2''
+
| ''NL Lock-Up/Commissioning, SSG, +2''
+
| ''NL Lock-Up/Commissioning, SSG, +2''
+
| ''NL Lock-Up/Commissioning, SSG, +2''
+
| ''NL Lock-Up/Commissioning, SSG, +2''
+
| Beam Off
+
| Beam Off
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
+
| Merz / Aiken
+
| Merz / Aiken
+
| Merz / Frierson
+
| Merz / Frierson
+
| Merz / Frierson
+
| Merz / Frierson
+
| Merz / Frierson
+
|}
+
 
+
 
+
'''CEBAF PSS Certifications Week 1/3''' <br> Beam Commissioning Week #3, if no sliding
+
 
+
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#CFE0E8;"
+
|- style="font-weight:bold; background-color:#87BDD8;"
+
! style="background-color:#87bdd8;" | DAY Shift<br />
+
! style="background-color:#87bdd8;" | Monday <br />5/24
+
! style="background-color:#87bdd8;" | Tuesday <br />5/25
+
! style="background-color:#87bdd8;" | Wednesday<br />5/26
+
! style="background-color:#87bdd8;" | Thursday <br />5/27
+
! style="background-color:#87bdd8;" | Friday<br />5/28
+
! style="background-color:#87bdd8;" | Sat<br />5/29
+
! style="background-color:#87bdd8;" | Sun<br />5/30
+
! style="background-color:#87bdd8;" | Notes/Goals
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning<br /> Plans (ATLis)
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
| rowspan="10" | Beam Commissioning<br />on Day Shift ONLY<br />during the week.<br />Weekend?
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
+
|
+
|
+
|
+
|
+
|
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
+
|
+
|
+
|
+
|
+
|
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
+
| TBD: {Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
+
| Garcia / Moser
+
| Garcia / Moser
+
| Garcia / Moser
+
| Garcia / Moser
+
| Garcia / Moser
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
+
|
+
|
+
|
+
|
+
|
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
|- style="font-weight:bold; background-color:#70AAAF;"
+
| SWING Shift
+
| 5/24
+
| 5/25
+
| 5/26
+
| 5/27
+
| 5/28
+
| style="background-color:#B7D7E8; font-weight:normal;" | Beam Off? / TBD
+
| style="background-color:#B7D7E8; font-weight:normal;" | Beam Off? / TBD
+
|- style="background-color:#DAEBE8;"
+
| style="font-weight:bold; background-color:#96CEB4;" | PSS CERTIFICATION
+
| PSS Certification
+
| PSS Certification
+
| PSS Certification
+
| PSS Certification
+
| PSS Certification
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
|- style="background-color:#DAEBE8;"
+
| style="font-weight:bold; background-color:#96CEB4;" | PSS Test Director
+
| Aiken
+
| Aiken
+
| Aiken
+
| Aiken
+
| Aiken
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
| style="background-color:#B7D7E8;" | Beam Off? / TBD
+
|- style="background-color:#DAEBE8;"
+
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
+
| Merz / Frierson
+
| Merz / Frierson
+
| Carlino / Frierson
+
| Carlino / Frierson
+
| Carlino / Frierson
+
| Carlino / Frierson
+
| Carlino / Frierson
+
|}
+
 
+
 
+
'''CEBAF PSS Certifications Week 2/3''' <br> Beam Commissioning Week #4, if no sliding
+
 
+
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#CFE0E8;"
+
|- style="font-weight:bold; background-color:#87BDD8;"
+
! style="background-color:#87bdd8;" | DAY Shift<br />
+
! style="background-color:#87bdd8;" | Monday 5/31<br />Memorial Day 🇺🇸
+
! style="background-color:#87bdd8;" | Tuesday <br />6/1
+
! style="background-color:#87bdd8;" | Wednesday<br />6/2
+
! style="background-color:#87bdd8;" | Thursday <br />6/3
+
! style="background-color:#87bdd8;" | Friday<br />6/4
+
! style="background-color:#87bdd8;" | Sat<br />6/5
+
! style="background-color:#87bdd8;" | Sun<br />6/6
+
! style="background-color:#87bdd8;" | Notes/Goals
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br />Plans (ATLis)
+
| No Beam
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| rowspan="10" | Beam Commissioning<br />on Day Shift ONLY<br />during the week.<br />Weekend?
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
+
| No Beam
+
|
+
|
+
|
+
|
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
+
| No beam
+
|
+
|
+
|
+
|
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
+
| No Beam
+
| TBD: {Forman, Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
+
| No Beam
+
| Gauthier / Moser
+
| Gauthier / Moser
+
| Gauthier / Moser
+
| Gauthier / Moser
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
+
|
+
|
+
|
+
|
+
|
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|- style="font-weight:bold; background-color:#70AAAF;"
+
| SWING Shift
+
| 5/31 🇺🇸
+
| 6/1
+
| 6/2
+
| 6/3
+
| 6/4
+
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
+
|- style="background-color:#DAEBE8;"
+
| style="font-weight:bold; background-color:#96CEB4;" | PSS CERTIFICATION
+
| PSS Certification
+
| PSS Certification
+
| PSS Certification
+
| PSS Certification
+
| PSS Certification
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|- style="background-color:#DAEBE8;"
+
| style="font-weight:bold; background-color:#96CEB4;" | PSS Test Director
+
| Aiken
+
| Aiken
+
| Aiken
+
| Aiken
+
| Aiken
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|- style="background-color:#DAEBE8;"
+
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
+
| Carlino / Frierson
+
| Carlino / Frierson
+
| Carlino / Merz
+
| Carlino / Merz
+
| Carlino / Merz
+
| style="background-color:#daebe8;" | Carlino / Merz
+
| style="background-color:#daebe8;" | Carlino / Merz
+
|}
+
 
+
 
+
'''CEBAF PSS Certifications Week 3/3''' <br> Beam Commissioning Week #5, if no sliding
+
 
+
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#CFE0E8;"
+
|- style="font-weight:bold; background-color:#87BDD8;"
+
! style="background-color:#87bdd8;" | DAY Shift<br />
+
! style="background-color:#87bdd8;" | Monday <br />6/7
+
! style="background-color:#87bdd8;" | Tuesday <br />6/8
+
! style="background-color:#87bdd8;" | Wednesday<br />6/9
+
! style="background-color:#87bdd8;" | Thursday <br />6/10
+
! style="background-color:#87bdd8;" | Friday<br />6/11
+
! style="background-color:#87bdd8;" | Sat<br />6/12
+
! style="background-color:#87bdd8;" | Sun<br />6/13
+
! style="background-color:#87bdd8;" | Notes/Goals
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br />Plans (ATLis)
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| rowspan="10" | Beam Commissioning<br />on Day Shift ONLY<br />during the week.<br />Weekend? <br> <br> After PSS Certs <br> Beam->FC2 possible
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
+
|
+
|
+
|
+
|
+
|
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
+
|
+
|
+
|
+
|
+
|
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
+
| TBD: {Forman, Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| TBD: {Forman, Law, Moser}
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
+
| Garcia / Moser
+
| Garcia / Moser
+
| Garcia / Moser
+
| Garcia / Moser
+
| Garcia / Moser
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|-
+
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
+
|
+
|
+
|
+
|
+
|
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|- style="font-weight:bold; background-color:#70AAAF;"
+
| SWING Shift
+
| 6/7
+
| 6/8
+
| 6/9
+
| 6/10
+
| 6/11
+
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8; font-weight:normal;" | Beam Off? / TBD
+
|- style="background-color:#DAEBE8;"
+
| style="font-weight:bold; background-color:#96CEB4;" | PSS CERTIFICATION
+
| PSS Certification
+
| PSS Certification
+
| PSS Certification
+
| PSS Certification
+
| PSS Certification
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|- style="background-color:#DAEBE8;"
+
| style="font-weight:bold; background-color:#96CEB4;" | PSS Test Director
+
| Aiken
+
| Aiken
+
| Aiken
+
| Aiken
+
| Aiken
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
| style="background-color:#b7d7e8;" | Beam Off? / TBD
+
|- style="background-color:#DAEBE8;"
+
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
+
| Carlino / Frierson
+
| Carlino / Frierson
+
| Moser / Merz
+
| Moser / Merz
+
| Moser / Merz
+
| style="background-color:#daebe8;" | Moser / Merz
+
| style="background-color:#daebe8;" | Moser / Merz
+
|}
+
 
+
 
+
Beam Commissioning Week #6, if no sliding. FC#2 Running Possible. 24/7 Possible.
+
 
+
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
+
|- style="font-weight:bold; background-color:#87BDD8;"
+
! style="background-color:#87bdd8;" | DAY Shift
+
! style="background-color:#87bdd8;" | Monday <br />6/14
+
! style="background-color:#87bdd8;" | Tuesday <br />6/15
+
! style="background-color:#87bdd8;" | Wednesday<br />6/16
+
! style="background-color:#87bdd8;" | Thursday <br />6/17
+
! style="background-color:#87bdd8;" | Friday<br />6/18
+
! style="background-color:#87bdd8;" | Sat<br />6/19
+
! style="background-color:#87bdd8;" | Sun<br />6/20
+
! style="background-color:#87bdd8;" | Notes/Goals
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br /> Plan (ATLis)
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| rowspan="14" | TBD
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
+
| TBD: {Forman, Law}
+
| TBD: {Forman, Law}
+
| TBD: {Forman, Law}
+
| TBD: {Forman, Law}
+
| TBD: {Forman, Law}
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|- style="font-weight:bold; background-color:#70AAAF;"
+
| SWING Shift
+
| 6/14
+
| 6/15
+
| 6/16
+
| 6/17
+
| 6/18
+
| 6/19
+
| 6/20
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
+
| TBD: {Forman, Law}
+
| TBD: {Forman, Law}
+
| TBD: {Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | SSO
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
+
| Moser / Merz
+
| Moser / Merz
+
| Moser / Carlino
+
| Moser / Carlino
+
| Moser / Carlino
+
| Moser / Carlino
+
| Moser / Carlino
+
|}
+
 
+
 
+
Beam Commissioning Week #7, if no sliding. FC#2 Running Possible. 24/7 Running Possible.
+
 
+
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
+
|- style="font-weight:bold; background-color:#87BDD8;"
+
! style="background-color:#87bdd8;" | DAY Shift
+
! style="background-color:#87bdd8;" | Monday <br />6/21
+
! style="background-color:#87bdd8;" | Tuesday <br />6/22
+
! style="background-color:#87bdd8;" | Wednesday<br />6/23
+
! style="background-color:#87bdd8;" | Thursday <br />6/24
+
! style="background-color:#87bdd8;" | Friday<br />6/25
+
! style="background-color:#87bdd8;" | Sat<br />6/26
+
! style="background-color:#87bdd8;" | Sun<br />6/27
+
! style="background-color:#87bdd8;" | Notes/Goals
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br /> Plan (ATLis)
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| rowspan="14" | TBD
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
+
| TBD: {Forman, Law}
+
| TBD: {Forman, Law}
+
| TBD: {Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|- style="font-weight:bold; background-color:#70AAAF;"
+
| SWING Shift
+
| 6/21
+
| 6/22
+
| 6/23
+
| 6/24
+
| 6/25
+
| 6/26
+
| 6/27
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
+
| TBD: {Forman, Law}
+
| TBD: {Forman, Law}
+
| TBD: {Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | SSO
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
+
| Moser / Carlino
+
| Moser / Carlino
+
| TBD / Carlino
+
| TBD / Carlino
+
| TBD / Carlino
+
| TBD / Carlino
+
| TBD / Carlino
+
|}
+
 
+
 
+
Beam Commissioning Week #8, if no sliding. FC#2 running possible. 24/7 running possible.
+
 
+
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
+
|- style="font-weight:bold; background-color:#87BDD8;"
+
! style="background-color:#87bdd8;" | DAY Shift
+
! style="background-color:#87bdd8;" | Monday <br />6/28
+
! style="background-color:#87bdd8;" | Tuesday <br />6/29
+
! style="background-color:#87bdd8;" | Wednesday<br />6/30
+
! style="background-color:#87bdd8;" | Thursday <br />7/1
+
! style="background-color:#87bdd8;" | Friday<br />7/2
+
! style="background-color:#87bdd8;" | Sat<br />7/3
+
! style="background-color:#87bdd8;" | Sun<br />7/4
+
! style="background-color:#87bdd8;" | Notes/Goals
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Beam  Commissioning <br /> Plan (ATLis)
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| rowspan="14" | TBD
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Ops Inj Support
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | SSO / AM Sweeper
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
|
+
|
+
|- style="background-color:#CFE0E8;"
+
| style="font-weight:bold; background-color:#B7D7E8;" | Other MCC Work, Group, +Persons in MCC
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|- style="font-weight:bold; background-color:#70AAAF;"
+
| SWING Shift
+
| 6/28
+
| 6/29
+
| 6/30
+
| 7/1
+
| 7/2
+
| 7/3
+
| 7/4
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Beam Commissioning Plan / ATLis
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Ops Inj Support
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
| TBD: {Moser, Forman, Law}
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | SSO
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
| TBD
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | Other MCC Work, Group, +Persons in MCC
+
|
+
|
+
|
+
|
+
|
+
|
+
|
+
|-
+
| style="font-weight:bold; background-color:#96CEB4;" | CCOC / PD
+
| TBD / Carlino
+
| TBD / Carlino
+
| TBD / TBD
+
| TBD / TBD
+
| TBD / TBD
+
| TBD / TBD
+
| TBD / TBD
+
|}
+
 
+
</div>
+
 
+
== Celebration ==
+
<div class="mw-collapsible mw-collapsed">
+
* [https://www.youtube.com/watch?v=3GwjfUFyY6M Our celebration song]
+
</div>
+

Latest revision as of 21:06, 6 May 2021

5/6/21 This page no longer in use.

For Phase 1 HCO/SR: Phase 1 System Readiness

For Phase 1 Beam Commissioning: Phase 1


404 dog.png