(Created page with "==Jobs Leading to HCO & Commissioning == ; 15 deg dipole (MDR) * Install on beam line after bake out, then align, do we use shims? * Current sensor for HV interlock installe...")
 
Line 16: Line 16:
 
; Wien HVPS
 
; Wien HVPS
 
* (done) Add placards to ISB racks
 
* (done) Add placards to ISB racks
 +
* Install HV Switcher chassis at ISB, complete cabling between rack components
 +
* Drop/pull HV cables from HV switcher outputs to Wiens
  
 
; Ion Pump Power Supplies
 
; Ion Pump Power Supplies
Line 25: Line 27:
  
 
; Valves
 
; Valves
 +
* Controls for (3) gate valves
 +
*
 +
 +
; Air, GN2, LCW
 +
* Move GN2 near gun lower, hook for air lines, caps for poly hose
 +
* Add 2nd GN2 near girder, hook for air lines, caps for poly hose
 +
* Fabricate, install air manifold for viewers and valves
 +
* (done) Re-install LCW manifold
 +
 +
; Electrician jobs
 +
* Relocate floor outlets
 +
* Bond girders (Shaun has holes drilled on girders already for this)
 +
* Install cable tray

Revision as of 06:38, 10 February 2021

Jobs Leading to HCO & Commissioning

15 deg dipole (MDR)
  • Install on beam line after bake out, then align, do we use shims?
  • Current sensor for HV interlock installed and tested, ready for DC power, to set limits, fault test
  • Current sensor for FSD installed and tested, calibrated for FSD card, ready for DC power, to set limits, fault test
  • Update drawings and documentation
Laser jobs
  • Complete outrigger box, install, test with laser room shutter, update LSOP
  • Flush chiller, decide on PM schedule, fill
  • Re-install Hall B amp in permanent location
  • Complete macropulse chassis upgrade (replace 18 VDC + booster with 24 VDC, add protection diode to shutters), test all beam modes
Wien HVPS
  • (done) Add placards to ISB racks
  • Install HV Switcher chassis at ISB, complete cabling between rack components
  • Drop/pull HV cables from HV switcher outputs to Wiens
Ion Pump Power Supplies
  • (done) Finalize IP names for songsheet
  • Complete mapping between all IP and power supplies (gun to choppers)
  • Complete UHV power supply upgrade, remove temp PS, spare PS on shelf (identify cabinet area for spares)
  • Work with software to reprogram UHV PS EPICS names, can we have unique identifier from old names?
  • Re-install (2) HV patch boxes, update box labels, pull HV drop cables to patch boxes, updated labels
Valves
  • Controls for (3) gate valves
Air, GN2, LCW
  • Move GN2 near gun lower, hook for air lines, caps for poly hose
  • Add 2nd GN2 near girder, hook for air lines, caps for poly hose
  • Fabricate, install air manifold for viewers and valves
  • (done) Re-install LCW manifold
Electrician jobs
  • Relocate floor outlets
  • Bond girders (Shaun has holes drilled on girders already for this)
  • Install cable tray