− | ==CIS Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30) ==
| + | 5/6/21 This page no longer in use. |
− | <div class="mw-collapsible mw-collapsed">
| + | |
| | | |
− | ; 15 deg dipole (Scott)
| + | For Phase 1 HCO/SR: [[Phase 1 System Readiness]] |
− | * '''(Scott working with CAD/DCG)''' Update drawings and document
| + | |
| | | |
− | ; Laser jobs (Shukui/Scott)
| + | For Phase 1 Beam Commissioning: [[Phase 1]] |
− | * '''(Shaun...)''' Complete outrigger box, install, test with laser room shutter
| + | |
− | * '''(Shukui)''' Update LSOP
| + | |
− | * '''(Shukui/Amali)''' Install/align Pockels cell
| + | |
− | * '''(Shukui)''' Re-install Hall B amp in permanent location
| + | |
− | * '''(Scott)''' Complete macropulse chassis upgrade, test all beam modes
| + | |
| | | |
− | ; Gun HVPS jobs (Carlos/Bubba/Scott)
| |
− | * '''(Bubba/Phil by 3/9)''' Re-install bracket
| |
− | * '''(Carlos/Bubba by 3/9 DONE)''' Regrease ceramic after bake
| |
− | * '''(Scott/Joe after PSS HV cert)''' Remove old HV parts (150kV glassman, old HV interlock chassis, VME interface card)
| |
− | * '''(Scott/Joe working...)''' Pull additional Anode bias HV cable near Glassman rack
| |
− | * '''(Draft done)''' Develop HV commissioning plan/staffing [[Media:Gun2 Tee electrode 200kV HV codnitoning plan 2021 draft01.pptx]]
| |
− | * '''(Carlos)''' Guidelines for ramping the gun voltage / HV conditioning to (>?) 130 kV under VACUUM conditions. [[Media:CEBAF Gun HV processing guidelines March 2021.docx]]
| |
| | | |
− | ; Wien HVPS
| + | [[File:404 dog.png|1000px]] |
− | * '''(Tony/Carlos)''' Drop/pull HV cables from HV switcher outputs to Wiens
| + | |
− | * '''(Riad)''' InjSteer screens check/test with Gary and Michelle updates with HVPS and new PS epics values, tested, ready
| + | |
− | * '''(Carlos wrap up with engineering)''' drawings, document
| + | |
− | | + | |
− | ; Ion Pump Power Supplies [[media:210209_ion pump names.xlsx]]
| + | |
− | * '''(Scott)''' Re-install (2) HV patch boxes, update box labels, pull HV drop cables to patch boxes, updated labels
| + | |
− | * '''(Scott)''' Update screens, labels, drawings, document
| + | |
− | | + | |
− | ; Vacuum
| + | |
− | * '''(Marcy/Phil)''' A1/A2 : Install, leak check, bake, leak check
| + | |
− | * '''(Marcy/Phil)''' Wien : Install, leak check, bake, leak check
| + | |
− | * '''(Marcy)''' Add extractor gauge to y chamber port
| + | |
− | * '''(Marcy)''' Fab cable for Y-NEG activation
| + | |
− | * '''(Marcy/Phil)''' Activate DP can downstream FC#1
| + | |
− | * '''(Marcy)''' Set final IP voltages (no FE'ers)
| + | |
− | * '''(Joe test by 3/12)''' see if cathode activates in prep chamber. If not, bake (No water in RGA scan)
| + | |
− | | + | |
− | ; Valves
| + | |
− | * '''(Scott)''' HCO UHV vacuum fault
| + | |
− | * '''(Scott)''' Update drawings, labels, document
| + | |
− | | + | |
− | ; Air, GN2, LCW
| + | |
− | * '''(Phil/Bubba)''' Fabricate, install air manifold w/ cutoff for (8) viewers, (2) valves, (2) spares
| + | |
− | * '''(Ricky to fasten)''' Fasten LCW to pedestals
| + | |
− | | + | |
− | ; Crash inhibit
| + | |
− | * '''(Tony/Phil)''' Install, test crash inhibit for pcup and viewer (note - fail safe test, i.e. do NOT hook up air to BOTH devices)
| + | |
− | * '''(Tony/Phil)''' Install, test crash inhibit for harp and viewer (note - does this exist, would speak to I&C early on)
| + | |
− | | + | |
− | ; Apertures & PCup
| + | |
− | * '''(Scott after bake)''' Terminate A1 cable, drive motor, test shoulder bolt
| + | |
− | * '''(Phil)''' Put new scribed aperture stops in bag in tunnel
| + | |
− | * '''(Pete/Phil)''' Attach current monitoring w/ inline I&C protection boxes
| + | |
− | * '''(Pete/Phil)''' Reconnect LCW, I&C check flow meters clear interlock
| + | |
− | | + | |
− | ; Electrician jobs
| + | |
− | * '''(Electricians/Scott)''' Bond girders
| + | |
− | * '''(Scott working on this)''' Install cable tray on girders
| + | |
− | | + | |
− | ; Decarad
| + | |
− | * '''(Scott)''' Install/cable 1 chassis, (5) for Carlos, (5) for Joe
| + | |
− | | + | |
− | </div>
| + | |
− | | + | |
− | ==I&C/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30) ==
| + | |
− | <div class="mw-collapsible mw-collapsed">
| + | |
− | | + | |
− | ; I&C Jobs
| + | |
− | * What to expect in tunnel?
| + | |
− | ** Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
| + | |
− | ** There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
| + | |
− | ** Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable tray (above/below) + 3 cable drops (Y, Laser, Chopper)
| + | |
− | | + | |
− | '''* BPMs = Pete estimates 1 person x 5 days for all of the BPM hook-up and pre-beam checkout jobs'''
| + | |
− | ** 10 total - all unrotated
| + | |
− | ** 3 new style => NEG coated large bore (2.5" ID); mapped by Musson (Kx/Ky values available)
| + | |
− | ** 7 old style => 5.5" long end tapped
| + | |
− | | + | |
− | * Viewers
| + | |
− | ** 8 total - all chromox except ITV0I02 (YAG)
| + | |
− | ** Crash inhibit #1 : ITV0I01 and Polarized Cup IFY0I01
| + | |
− | ** Crash inhibit #2 : ITV0I02 and Harp IHA0I02
| + | |
− | | + | |
− | * Harps
| + | |
− | ** 1 total - IHA0I02 (YAG), on same cross as viewer ITV0I02 (requires crash inhibit)
| + | |
− | | + | |
− | * Wien HV
| + | |
− | ** Tony status update
| + | |
− | | + | |
− | '''* Current Monitoring - Pete estimates 1 person x 3 days for ItoV, Picoammeters, Gun FSD LCW waterflow interlocks)'''
| + | |
− | ** 3 total - same as before (PCUP, A1, A2)
| + | |
− | ** PCUP identical as before, just a new location
| + | |
− | ** A1 current monitoring as before, linear bellow motion now has STAC5 motor (so remote or manual; has 3 stop positions
| + | |
− | ** A2 current monitoring as before, linear bellows manual as before; has 3 stop positions. Used by PSS group for kicker
| + | |
− | | + | |
− | * Valves
| + | |
− | ** 3 total - all have in-line EPICS shut over ride capability (CIS installs this box)
| + | |
− | ** Gun valve - VBV2I01A (new name), otherwise same all metal gate valve
| + | |
− | ** Beam line valve - VBV1I07 (same name), same all metal gate valve
| + | |
− | ** Beam line valve - VBV0I02 (same name), but now all metal gate valve, requires cable terminations like VBV1I07
| + | |
− | ** All 3 valves tied to UHV vacuum fault (100 uA limit)
| + | |
− | | + | |
− | * Ion pumps
| + | |
− | ** Marcy's final list [[media:210209_ion pump names.xlsx]]
| + | |
− | | + | |
− | ; Software Jobs
| + | |
− | * CED
| + | |
− | ** Michele or Gary can gives us an update
| + | |
− | | + | |
− | * Apps
| + | |
− | ** Injector steering script getting upgrades for Wien/Solenoid controls, also needs update of correctors/bpms
| + | |
− | ** Any script that refers to CED elements from Gun to Chopper will need name review, sounds like a big job
| + | |
− | | + | |
− | * Screens
| + | |
− | ** I guess many screens auto-updated from CED, that's great
| + | |
− | ** Like with apps, will need name review; I guess system owners look at their own screens for oddities?
| + | |
− | | + | |
− | * What else for software?
| + | |
− | | + | |
− | </div>
| + | |
− | | + | |
− | ==Magnet/DC-Power/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30) ==
| + | |
− | <div class="mw-collapsible mw-collapsed">
| + | |
− | | + | |
− | ; DC/Magnet Jobs
| + | |
− | * Spreadsheet updated after further feedback [[media:210301_Phase1_Magnet_Summary_v3.xlsx]]
| + | |
− | * Spreadsheet updated at 3/1 SAD planning meeting [[media:210301_Phase1_Magnet_Summary_v2.xlsx]]
| + | |
− | * Spreadsheet initially [[media:210301_Phase1_Magnet_Summary.xlsx]]
| + | |
− | | + | |
− | ; Software Jobs
| + | |
− | * CED
| + | |
− | * Apps
| + | |
− | * Screens
| + | |
− | * What else for software?
| + | |
− | | + | |
− | ; Other magnet jobs
| + | |
− | *(JM) Complete magnet table I circulated
| + | |
− | *(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
| + | |
− | *(RS/GC) FG solenoid special hysteresis for Gary
| + | |
− | *(RS/MJ) Magnet info for Inj Steer spin calculations
| + | |
− | *(JM/JG) Decision on spare DR fabrication and alignment
| + | |
− | *(LL/JK/JM) PSS kicker - does MMF have any responsibility here, maybe just PSS?
| + | |
− | *(LL/JM) Second QW measurement, what's the scope here?
| + | |
− | *(JM) When is the rotating coil stand ready?
| + | |
− | *(JM/LL) Reconciling MHD discrepancy
| + | |
− | *(LL) Report on QW
| + | |
− | *(LL) Report on HD
| + | |
− | *(LL) Report on PSS kicker
| + | |
− | | + | |
− | | + | |
− | | + | |
− | </div>
| + | |
− | | + | |
− | == Beam Commissioning (May 3 - Jul 2) ==
| + | |
− | <div class="mw-collapsible mw-collapsed">
| + | |
− | | + | |
− | | + | |
− | === Important Dates ===
| + | |
− | ''updated 3/1/21''
| + | |
− | * Injector HCO/SR Complete: 5/3
| + | |
− | * NL/Inj -> Stable 2K: 5/21
| + | |
− | * Full CEBAF PSS Certification: 5/24 - 6/11
| + | |
− | * End of SAD: 7/2
| + | |
− | * Resumption of Physics: Mid-August
| + | |
− | | + | |
− | | + | |
− | === Activities ===
| + | |
− | ''updated 3/1/21''
| + | |
− | | + | |
− | [[File:Commissioning testplans Rev2.png | 999px]] | + | |
− | | + | |
− | | + | |
− | === ATLis Testplans ===
| + | |
− | ''updated 3/1/21''
| + | |
− | * [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21911 21911 Gun high voltage conditioning]
| + | |
− | * [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=21923 21923 Perform 130keV emittance measurements and matching as part of Injector Upgrade commissioning]
| + | |
− | | + | |
− | | + | |
− | </div>
| + | |
− | | + | |
− | == Celebration ==
| + | |
− | <div class="mw-collapsible mw-collapsed">
| + | |
− | * [https://www.youtube.com/watch?v=3GwjfUFyY6M Our celebration song]
| + | |
− | </div>
| + | |
5/6/21 This page no longer in use.