Phase 1 - HCO & Commissioning
From Ciswikidb
Revision as of 05:30, 10 February 2021 by Grames (Talk | contribs) (Created page with "==Jobs Leading to HCO & Commissioning == ; 15 deg dipole (MDR) * Install on beam line after bake out, then align, do we use shims? * Current sensor for HV interlock installe...")
Jobs Leading to HCO & Commissioning
- 15 deg dipole (MDR)
- Install on beam line after bake out, then align, do we use shims?
- Current sensor for HV interlock installed and tested, ready for DC power, to set limits, fault test
- Current sensor for FSD installed and tested, calibrated for FSD card, ready for DC power, to set limits, fault test
- Update drawings and documentation
- Laser jobs
- Complete outrigger box, install, test with laser room shutter, update LSOP
- Flush chiller, decide on PM schedule, fill
- Re-install Hall B amp in permanent location
- Complete macropulse chassis upgrade (replace 18 VDC + booster with 24 VDC, add protection diode to shutters), test all beam modes
- Wien HVPS
- (done) Add placards to ISB racks
- Ion Pump Power Supplies
- (done) Finalize IP names for songsheet
- Complete mapping between all IP and power supplies (gun to choppers)
- Complete UHV power supply upgrade, remove temp PS, spare PS on shelf (identify cabinet area for spares)
- Work with software to reprogram UHV PS EPICS names, can we have unique identifier from old names?
- Re-install (2) HV patch boxes, update box labels, pull HV drop cables to patch boxes, updated labels
- Valves