Phase 1 - HCO & Commissioning

From Ciswikidb
Jump to navigation Jump to search

CIS Jobs Leading to HCO & Commissioning (Jan 1 - Apr 30)

I&C/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30)

I&C Jobs
  • What to expect in tunnel?
    • Similar mechanical layout => Gun + 3 girders (Y + Wien + A1/A2)
    • There is now a 3D CAD model from gun to chopper, I can share pics or see Gary Hays or Shaun Gregory
    • Similar utilities => LCW (A1/A2) + Air (Bubba/Phil) + Cable tray (above/below) + 3 cable drops (Y, Laser, Chopper)

* BPMs = Pete estimates 1 person x 5 days for all of the BPM hook-up and pre-beam checkout jobs

    • 10 total - all unrotated
    • 3 new style => NEG coated large bore (2.5" ID); mapped by Musson (Kx/Ky values available)
    • 7 old style => 5.5" long end tapped
  • Viewers
    • 8 total - all chromox except ITV0I02 (YAG)
    • Crash inhibit #1 : ITV0I01 and Polarized Cup IFY0I01
    • Crash inhibit #2 : ITV0I02 and Harp IHA0I02
  • Harps
    • 1 total - IHA0I02 (YAG), on same cross as viewer ITV0I02 (requires crash inhibit)
  • Wien HV
    • Tony status update

* Current Monitoring - Pete estimates 1 person x 3 days for ItoV, Picoammeters, Gun FSD LCW waterflow interlocks)

    • 3 total - same as before (PCUP, A1, A2)
    • PCUP identical as before, just a new location
    • A1 current monitoring as before, linear bellow motion now has STAC5 motor (so remote or manual; has 3 stop positions
    • A2 current monitoring as before, linear bellows manual as before; has 3 stop positions. Used by PSS group for kicker
  • Valves
    • 3 total - all have in-line EPICS shut over ride capability (CIS installs this box)
    • Gun valve - VBV2I01A (new name), otherwise same all metal gate valve
    • Beam line valve - VBV1I07 (same name), same all metal gate valve
    • Beam line valve - VBV0I02 (same name), but now all metal gate valve, requires cable terminations like VBV1I07
    • All 3 valves tied to UHV vacuum fault (100 uA limit)
Software Jobs
  • CED
    • Michele or Gary can gives us an update
  • Apps
    • Injector steering script getting upgrades for Wien/Solenoid controls, also needs update of correctors/bpms
    • Any script that refers to CED elements from Gun to Chopper will need name review, sounds like a big job
  • Screens
    • I guess many screens auto-updated from CED, that's great
    • Like with apps, will need name review; I guess system owners look at their own screens for oddities?
  • What else for software?

Magnet/DC-Power/Software Jobs Leading to HCO & Commissioning (Apr 5 - Apr 30)

DC/Magnet Jobs
Updated MHD field map due from JM/LL to GC
Updated MFX (SW/CW) field map due from RS to GC
Software Jobs
  • CED
  • Apps
  • Screens
  • What else for software?
Other magnet jobs
  • (JM) Complete magnet table I circulated
  • Done(JM/LL) Initial QW measurement and assessment (sufficient for CED), summarized for Gary
  • (RS/GC) FG solenoid special hysteresis for Gary
  • (RS/MJ) Magnet info for Inj Steer spin calculations
  • (JM/JG) Decision on spare DR fabrication and alignment
  • Done (LL/JK/JM) PSS kicker - does MMF have any responsibility here, maybe just PSS?
  • Done (LL/JM) Second QW measurement, what's the scope here?
  • Done (JM) When is the rotating coil stand ready?
  • (JM/LL) Reconciling MHD discrepancy
  • (LL) Report on QW
  • (LL) Report on HD
  • (LL) Report on PSS kicker


System Readiness / HCO Schedule (April '21)

For detailed plans for a given day and week, discussed at 830 toolbox meeting every weekday, see CIS Phase 1 work plans

Format: time: System (# of people)

Updated 4/22

April/May Mon Tue Wed Thu Fri Sa Su
12th - 16th Morning: Valve Controls (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: Valve Controls (1x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: Valve Controls (1x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: ItoV, Pico, FSD (1x)
Afternoon: Magnet Hook-Ups (2x)
Magnet Hook-Ups (2x) Magnet Hook-Ups (2x)
19th - 23rd Morning: BPMs (1x)
Morning: Viewers (1x)
Morning: Harps (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: BPMs (1x)
Morning: Viewers (1x)
Morning: Harps (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: BPMs (1x)
Morning: Viewers (1x)
Morning: Harps (1x)
Afternoon: Magnet Hook-Ups (2x)
Morning: Diagnostics Hook-ups
as possible; Leak Checks (CIS)
Bake Prep (all)
Afternoon: Leak Checks
Bake Prep (CIS)
Morning: Diagnostics Hook-ups
as possible
Bake Prep (all)
Afternoon: Bake Prep (all)
Magnet Hook-Ups/HCO (2x)?
Magnet Hook-Ups/HCO (2x)?
26th - 30th VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
VBV1I070->0I07 Bake
Opportunistic Hook-ups
as possible
Magnet HCO (2x)? Magnet HCO (2x)?
3rd - 7th TBD TBD TBD TBD TBD TBD TBD
10th - 14th TBD TBD TBD TBD TBD TBD TBD
  • BPM = Francis
  • Valve Controls = Ketchum
  • ItoV, Picoammeters, Gun FSD Interlocks = Francis
  • Viewers = Norris
  • Harps = Dela Cruz
  • Wien = Dela Cruz
  • Magnet / DC Power = Coleman
  • 2B Alignment = S&A, Gould
  • PSS = Kowal

Beam Commissioning

Shift Quick References





ATLis Testplans

updated 4/26/21

General / Catch-All Test Plans


With-Beam Hardware Commissioning Test Plans


Beam Commissioning


Optics/RF Test Plans


Spin/Wien Test Plans


Parity Quality Beam Test Plans


ATLiss Arranged in Table

Screen Shot 2021-04-26 at 7.49.40 PM.png

Other Docs/Links


Typical Commissioning Day

For weekdays up to PSS Certification beginning M 5/24:
Lock-up each morning after maintenance punchlist from previous day addressed.
4p: Shift turnover from days -> swings.
Each night, 12p, Injector -> Restricted Access.

Beam Parameter Scaling (130kV -> 200kV)

Table goes here. Forthcoming.

Important Dates

updated 5/4/21

  • Finalize commissioning plan: April 5th
  • Injector HCO/SR Complete: 5/10 at the earliest
  • Injector Beam Commissioning Begins: 5/10 at the earliest
  • NL/Inj -> Stable 2K: 5/21
  • Full CEBAF PSS Certification: 5/24 - 6/11
  • End of SAD: 7/2
  • Resumption of Physics: Mid-August


Beam Commissioning Schedule

updated 4/28


Beam Commissioning Week #1? -- Earliest possible start date for beam commissioning is 5/10. Actual date may slide.

DAY Shift Monday
5/10
Tuesday
5/11
Wednesday
5/12
Thursday
5/13
Friday
5/14
Sat
5/15
Sun
5/16
Notes/Goals
Beam Commissioning
Plan (ATLis)
pre-beam checks
Gun->Chopper Commissioning @ 130keV, TM (22180)
Gun->Chopper Commissioning @ 130keV, TM (22180) PSS Kicker Cert (22061)
PCup -> FC1 @130keV, TM (22182)
PCup -> FC1 @130keV, TM (22182) PCup -> FC1 @130keV, CW (22182)
/or\ Spot Move Knobs (22184)
Beam Off Beam Off With-beam HCO of
all hardware up to 1D;
TM setup to FC1/1D,
including element centering,
correcting for gun kick;
Early Injector Orbit
Data Collection;
Spot move knobs;
CW Setup to FC1?
Shift Leader Grames Grames Beam Off Beam Off
Scientist #2 Hernandez-Garcia Hernandez-Garcia Beam Off Beam Off
Ops Inj Support Forman Moser Forman Forman Forman Beam Off Beam Off
SSO / AM Sweeper Carlino / Jones Carlino / Jones Carlino / Jones Carlino / Jones Carlino / Jones Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2
SWING Shift 5/10 5/11 5/12 5/13 5/14 5/15 5/16
Beam Commissioning Plan / ATLis Gun->Chopper Commissioning @ 130keV, TM (22180) Gun->Chopper Commissioning @ 130keV, TM (22180) PCup -> FC1 @130keV, TM (22182) PCup -> FC1 @130keV, TM (22182)
Early Injector Orbit Data (22181)
PCup -> FC1 @130keV, CW (22182)
/or\,Spot Move Knobs (22184)
Beam Off Beam Off
Shift Leader Beam Off Beam Off
Scientist #2 Beam Off Beam Off
Ops Inj Support Law Law Law Law Law Beam Off Beam Off
SSO Deir Deir Deir Deir Deir Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC
CCOC / PD Aiken (both) Aiken Merz / Aiken Merz / Aiken Merz / Aiken Merz / Aiken Merz / Aiken


Beam Commissioning Week #2, if no sliding

DAY Shift Monday
5/17
Tuesday
5/18
Wednesday
5/19
Thursday
5/20
Friday
5/21
Sat
5/22
Sun
5/23
Notes/Goals
Beam Commissioning
Plan (ATLis)
PCup -> FC1 @130keV, CW (22182)
/or\ Spot Move Knobs (22184)
PCup -> FC1 @130keV, CW (22182)
PCup vs Gun HVPS Current Cal (22080)
Warm RF Setup @130keV (22190) MDR1I02 Optics vs Rotation (22160) 0I02-YAG Emittance Measurement (22250) Beam Off Beam Off CW Setup to FC1/1D;
Warm RF CW Setup;
1I-0I-region Optics
measurements;
Lifetime measurement?
Shift Leader Grames Grames Beam Off Beam Off
Scientist #2 Hernandez-Garcia Hernandez-Garcia Beam Off Beam Off
Ops Inj Support Forman Forman Forman Forman Forman Beam Off Beam Off
SSO / AM Sweeper Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2
SWING Shift 5/17 5/18 5/19 5/20 5/21 5/22 5/23
Beam Commissioning Plan / ATLis PCup -> FC1 @130keV, CW (22182)
1I-0I-region qsUtility @130keV (21923)?
Warm RF Setup @130keV (22190) Warm RF Setup @130keV (22190)
MDR1I02 Optics vs Rotation (22160)?
1I-0I-region qsUtility @130keV (21923) 1I-0I-region qsUtility @130keV (21923)

Lifetime Measurement @ 130keV (22082)
Beam Off Beam Off
Shift Leader Turner Turner Beam Off Beam Off
Scientist #2 Turner Beam Off Beam Off
Ops Inj Support Law Law Law Law Law Beam Off Beam Off
SSO Anthony Anthony Anthony Anthony Anthony Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 Beam Off Beam Off
CCOC / PD Merz / Aiken Merz / Aiken Merz / Frierson Merz / Frierson Merz / Frierson Merz / Frierson Merz / Frierson


CEBAF PSS Certifications Week 1/3
Beam Commissioning Week #3, if no sliding

DAY Shift
Monday
5/24
Tuesday
5/25
Wednesday
5/26
Thursday
5/27
Friday
5/28
Sat
5/29
Sun
5/30
Notes/Goals
Beam Commissioning
Plans (ATLis)
TBD TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?
Shift Leader Beam Off? / TBD Beam Off? / TBD
Scientist #2 Beam Off? / TBD Beam Off? / TBD
Ops Inj Support TBD: {Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 5/24 5/25 5/26 5/27 5/28 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Merz / Frierson Merz / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson


CEBAF PSS Certifications Week 2/3
Beam Commissioning Week #4, if no sliding

DAY Shift
Monday 5/31
Memorial Day 🇺🇸
Tuesday
6/1
Wednesday
6/2
Thursday
6/3
Friday
6/4
Sat
6/5
Sun
6/6
Notes/Goals
Beam Commissioning
Plans (ATLis)
No Beam TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?
Shift Leader No Beam Beam Off? / TBD Beam Off? / TBD
Scientist #2 No beam Beam Off? / TBD Beam Off? / TBD
Ops Inj Support No Beam TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper No Beam Gauthier / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 5/31 🇺🇸 6/1 6/2 6/3 6/4 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Carlino / Frierson Carlino / Frierson Carlino / Merz Carlino / Merz Carlino / Merz Carlino / Merz Carlino / Merz


CEBAF PSS Certifications Week 3/3
Beam Commissioning Week #5, if no sliding

DAY Shift
Monday
6/7
Tuesday
6/8
Wednesday
6/9
Thursday
6/10
Friday
6/11
Sat
6/12
Sun
6/13
Notes/Goals
Beam Commissioning
Plans (ATLis)
TBD TBD TBD TBD TBD Beam Off? / TBD Beam Off? / TBD Beam Commissioning
on Day Shift ONLY
during the week.
Weekend?

After PSS Certs
Beam->FC2 possible
Shift Leader Beam Off? / TBD Beam Off? / TBD
Scientist #2 Beam Off? / TBD Beam Off? / TBD
Ops Inj Support TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} TBD: {Forman, Law, Moser} Beam Off? / TBD Beam Off? / TBD
SSO / AM Sweeper Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Garcia / Moser Beam Off? / TBD Beam Off? / TBD
Other MCC Work, Group, +Persons in MCC Beam Off? / TBD Beam Off? / TBD
SWING Shift 6/7 6/8 6/9 6/10 6/11 Beam Off? / TBD Beam Off? / TBD
PSS CERTIFICATION PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification Beam Off? / TBD Beam Off? / TBD
PSS Test Director Aiken Aiken Aiken Aiken Aiken Beam Off? / TBD Beam Off? / TBD
CCOC / PD Carlino / Frierson Carlino / Frierson Moser / Merz Moser / Merz Moser / Merz Moser / Merz Moser / Merz


Beam Commissioning Week #6, if no sliding. FC#2 Running Possible. 24/7 Possible.

DAY Shift Monday
6/14
Tuesday
6/15
Wednesday
6/16
Thursday
6/17
Friday
6/18
Sat
6/19
Sun
6/20
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/14 6/15 6/16 6/17 6/18 6/19 6/20
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD Moser / Merz Moser / Merz Moser / Carlino Moser / Carlino Moser / Carlino Moser / Carlino Moser / Carlino


Beam Commissioning Week #7, if no sliding. FC#2 Running Possible. 24/7 Running Possible.

DAY Shift Monday
6/21
Tuesday
6/22
Wednesday
6/23
Thursday
6/24
Friday
6/25
Sat
6/26
Sun
6/27
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/21 6/22 6/23 6/24 6/25 6/26 6/27
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD Moser / Carlino Moser / Carlino TBD / Carlino TBD / Carlino TBD / Carlino TBD / Carlino TBD / Carlino


Beam Commissioning Week #8, if no sliding. FC#2 running possible. 24/7 running possible.

DAY Shift Monday
6/28
Tuesday
6/29
Wednesday
6/30
Thursday
7/1
Friday
7/2
Sat
7/3
Sun
7/4
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/28 6/29 6/30 7/1 7/2 7/3 7/4
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD TBD / Carlino TBD / Carlino TBD / TBD TBD / TBD TBD / TBD TBD / TBD TBD / TBD

Celebration