Difference between revisions of "Phase 1 Commissioning Schedule"

From Ciswikidb
Jump to navigation Jump to search
(3 intermediate revisions by the same user not shown)
Line 546: Line 546:
 
<div class="mw-collapsible">
 
<div class="mw-collapsible">
  
* Wrapping up PSS Functional Tests on Swings, exact date(s) TBD
+
* 6/18-20 Weekend -- 500keV limited
* PSS Kicker certification after coil repair, exact time TBD
+
** PSS kicker workaround to be reviewed by SCMB
* NL+Inj -> 2K this week? 6/11 Forecast: possibly
 
* Begin owls Tuesday 6/15
 
  
  
Line 571: Line 569:
 
| AutoSteer Knobs ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
 
| AutoSteer Knobs ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
 
| AutoSteer Knobs ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
 
| AutoSteer Knobs ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
| TBD
+
| AutoSteer Knobs ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
| TBD
+
| AutoSteer Knobs ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
 
| rowspan="17" style="background-color:#CFE0E8;" | Orbit vs Wien <br />HVPS-Off Config<br /><br />0I02 YAG <br />Emittance<br />Measurement<br /><br />AutoSteer Knobs -<br />Wien, further?<br /><br />Wien EvB Cal<br /><br />ToF vs Wien θ<br /><br />Early Injector <br />setup training<br /><br />Parity DAQ<br />Checkout
 
| rowspan="17" style="background-color:#CFE0E8;" | Orbit vs Wien <br />HVPS-Off Config<br /><br />0I02 YAG <br />Emittance<br />Measurement<br /><br />AutoSteer Knobs -<br />Wien, further?<br /><br />Wien EvB Cal<br /><br />ToF vs Wien θ<br /><br />Early Injector <br />setup training<br /><br />Parity DAQ<br />Checkout
 
|-
 
|-
Line 581: Line 579:
 
| Law
 
| Law
 
| Law
 
| Law
|  
+
| Law
|  
+
| Law
 
|-
 
|-
 
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
Line 625: Line 623:
 
| ToF vs Wien Angle ([http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22330 22330]) <br> /or\ <br> Further Wien Studies (E/B Cal ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22084 22084]), orbit deflection, XY-coupling)
 
| ToF vs Wien Angle ([http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22330 22330]) <br> /or\ <br> Further Wien Studies (E/B Cal ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22084 22084]), orbit deflection, XY-coupling)
 
| InjSteering Script Testing ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
 
| InjSteering Script Testing ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
| ''FC2 Setup?''
+
| FC1 High Current Setup ([http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182])
| TBD
+
| 8A-noon: MWF Noise Measurements vs Wien Angle Setting ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22500 22500]) <br> noon+: FC1 High Current Setup ([http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182])
| TBD
+
| FC1 High Current Setup ([http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182])
 
|- style="background-color:#CFE0E8;"
 
|- style="background-color:#CFE0E8;"
 
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
 
| style="font-weight:bold; background-color:#B7D7E8;" | Shift Leader
Line 634: Line 632:
 
| Poelker
 
| Poelker
 
| Hofler
 
| Hofler
|  
+
| Wang
|  
+
| 8A-noon: Suleiman <br> noon+: Wang
|  
+
| Wang
 
|- style="background-color:#CFE0E8;"
 
|- style="background-color:#CFE0E8;"
 
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
 
| style="font-weight:bold; background-color:#B7D7E8;" | Scientist #2
Line 679: Line 677:
 
| High Current (100uA) CW to FC1 w/Choppers ([http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182], [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22190 22190])
 
| High Current (100uA) CW to FC1 w/Choppers ([http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182], [http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22190 22190])
 
| PSS Functional Tests <br> No Beam
 
| PSS Functional Tests <br> No Beam
| ''FC2 Setup?''
+
| FC1 High Current Setup ([http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182]) <br> AutoSteer Knobs ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
| TBD
+
| FC1 High Current Setup ([http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22182 22182]) <br> AutoSteer Knobs ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
| TBD
+
| 4P-8P: Spot Move Tests ([http://devweb.acc.jlab.org/CSUEApps/atlis/atlis.php?load=Task&task_id=22184 22184]) <br> 8P+: AutoSteer Knobs ([http://devweb.acc.jlab.org/CSUEApps/atlis/task/22441 22441])
 
|-
 
|-
 
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
 
| style="font-weight:bold; background-color:#96CEB4;" | Shift Leader
Line 688: Line 686:
 
| Wang
 
| Wang
 
|  
 
|  
|  
+
| Wang <br> Law
|  
+
| Wang <br> Law
|  
+
| 4P-8P: Grames <br> Law
 
|-
 
|-
 
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
 
| style="font-weight:bold; background-color:#96CEB4;" | Scientist #2
Line 697: Line 695:
 
| Kazimi
 
| Kazimi
 
|  
 
|  
| Grames
+
|  
 
|  
 
|  
 
|  
 
|  
Line 724: Line 722:
 
==== Week 5, June 21st-27th ====
 
==== Week 5, June 21st-27th ====
 
<div class="mw-collapsible mw-collapsed">
 
<div class="mw-collapsible mw-collapsed">
FC#2 Running Possible. 24/7 Running Possible.
+
* SCMB reviewing proposal to run without PSS Kicker
 +
** 500keV-limited (i.e. 1D/FC1) until SCMB approval
 +
** Monday Swing, may be able to run to FC2
 +
** ILD running contingent on SCMB approval and HCO completion
 +
 
  
 
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"
 
{| class="wikitable" style="text-align:center; vertical-align:middle; background-color:#DAEBE8;"

Revision as of 17:31, 18 June 2021

Week 0, May 17th-23rd

DAY Shift Monday
5/17
Tuesday
5/18
Wednesday
5/19
Thursday
5/20
Friday
5/21
Sat
5/22
Sun
5/23
Notes/Goals
Beam Commissioning
Plan (ATLis)
Hot Checkout
No Beam
AM: Hot Checkout
PM: PSS Certs
830-9a: Cryo tour (3ppl)
0I02 harp repair
PM: PSS Certs
0I02 harp repair
float: PSS certs
AM: 0I02 reconnects
PM: PSS Certs
Begin Beam Commissioning!
Beam Off Beam Off First beam of 2021
Shift Leader Hot Checkout
No Beam
Suleiman Grames Poelker Suleiman Beam Off Beam Off
Scientist #2 Hot Checkout
No Beam
Bruker Bruker Hernandez-Garcia Mamun Beam Off Beam Off
Ops Inj Support Hot Checkout
No Beam
PSS TD: Forman PSS TD: Moser Moser PSS TD: Forman
Moser
Beam Off Beam Off
SSO / AM Sweeper Hot Checkout
No Beam
SSG / Forman / Moser Gauthier / Moser Gauthier / Moser Gauthier / Moser Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2
SWING Shift 5/17 5/18 5/19 5/20 5/21 5/22 5/23
Beam Commissioning Plan / ATLis Hot Checkout
No Beam
0I02 harp repair 0I02 harp repair 0I02 harp repair Trickle Beam to first Viewer
60Hz Noise Snooping /
Cable Shielding
Beam Off Beam Off
Shift Leader Hot Checkout
No Beam
Wang Wang Wang Wang Beam Off Beam Off
Scientist #2 Hot Checkout
No Beam
Hofler Kazimi Hofler Kazimi or Hofler Beam Off Beam Off
Ops Inj Support Hot Checkout
No Beam
Law Law Law Law Beam Off Beam Off
SSO Hot Checkout
No Beam
Anthony Anthony Anthony Anthony Beam Off Beam Off
Other MCC Work, Group, +Persons in MCC NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2 NL Lock-Up/Commissioning, SSG, +2
CCOC / PD Merz / Aiken Merz / Aiken Merz / Frierson Merz / Frierson Merz / Frierson Merz / Frierson Merz / Frierson

Week 1, May 24th-30th

CEBAF PSS Certifications Week 1/3

italics = less certain


DAY Shift Monday
5/24
Tuesday
5/25
Wednesday
5/26
Thursday
5/27
Friday
5/28
Sat
5/29
Sun
5/30
Notes/Goals
Beam Commissioning
Plan (ATLis)
Initial Beam Threading

Gun->PCup, 130keV, TM (22180)
PSS Kicker Cert (22061)
Initial Beam Threading

Gun->PCup, 130keV, CW (22180)
PSS Kicker Cert (22061)
Element Centering

Gun->PCup, 130keV, CW (22180)
Early Injector Orbit Data (22181)
PSS Kicker Cert (22061)
AM: Polarity Checks
AM: Solenoid, Quad Centering
Gun->PCup, 130keV, CW (22180)
Early Injector Orbit Data (22181)

PM: Prebuncher

RF Elements Setup, 130keV, CW (22190)
Prebuncher setup -- 22190 RF Elements Setup
/or\
22184 Spot Move Knobs

2p: 22061 PSS Kicker Cert
22084 AIPINJ: 130/200 keV E/B calibrations for V-Wien and H-Wien
22080 AIPINJ: 130/200 keV HVPS vs. PCUP current monitor calibration
22184 Efficacy of Knobs chosen for spot move correction
22441 Commissioning V-Wien, H-Wien, Spin Flipper Solenoids and Autosteer Knobs
22084 AIPINJ: 130/200 keV E/B calibrations for V-Wien and H-Wien
22080 AIPINJ: 130/200 keV HVPS vs. PCUP current monitor calibration
22184 Efficacy of Knobs chosen for spot move correction
22441 Commissioning V-Wien, H-Wien, Spin Flipper Solenoids and Autosteer Knobs
Weekday lock-ups
at ~0645. Weekdays
PSS Certs @330p,
no Inj commissioning
Shift Leader <8a: Grames
8a-4p: Kazimi
<8a: Grames
8a-4p: Wang
<8a: Grames
8a-4p: Hofler
<8a: Grames
8a-noon: Wang
noon-4p: Kazimi
<8a: Moser
8a-4p: Kazimi
8a-4p
Suleiman
8a-4p
Suleiman
Scientist #2 8a-4p: Wang 8a-4p: Hofler 8a-4p: Wang 8a-4p: Hofler 8a-4p: {Wang, Hofler} Bruker
Mamun
Bruker
Mamun
Ops Inj Support Law Law Law Law Law Law
SSO / AM Sweeper Garcia / Law Garcia / Law Garcia / Law Garcia / Law Law / Moser Merz / Carlino Deir / Carlino
Other MCC Work, Group, +Persons in MCC NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2 NL PSS Commissioning, SSG, +2
SWING Shift 5/24 5/25 5/26 5/27 5/28 5/29 5/30
Beam Commissioning Plan / ATLis PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification No Beam No Beam
Shift Leader PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification
Scientist #2 PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification
Ops Inj Support PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification
SSO | PSS TD Aiken Aiken Aiken Aiken Aiken Deir Deir
Other MCC Work, Group, +Persons in MCC SSG SSG SSG SSG SSG
CCOC / PD Merz / Frierson Merz / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson Carlino / Frierson

Week 2, May 31st🇺🇸 - June 6th

CEBAF PSS Certifications Week 2/3

DAY Shift Monday 5/31
Memorial Day 🇺🇸
Tuesday
6/1
Wednesday
6/2
Thursday
6/3
Friday
6/4
Sat
6/5
Sun
6/6
Notes/Goals
Beam Commissioning
Plan (ATLis)
No Beam AM: 22182 Set up beam from PCup to FC1 at 130keV, TM
22084 130keV Wien E/B cals

PM: Prebuncher - 22190 RF Elements Setup
2p: 22061 PSS Kicker @130keV
7a-9a: 22084 130keV Wien E/B cals
9a-noon: 22441 Wien Autosteer Knobs
noon-2p: 22190 Prebuncher Characterization
2p-330p: 22061 PSS Kicker
AM: 22441 Wien Autosteer Knobs
PM: 22181 Early Injector FOPT Data
0I02 Harp Install
No Beam
No Beam No Beam Weekday lock-ups
at ~0645. Weekdays
PSS Certs @330p,
no Inj commissioning
Shift Leader No Beam <8a: CIS
8a-noon: Wang
noon-4p: Kazimi
7a-9a: Suleiman
9a-noon: Law
noon-4p: Kazimi
<8a: Grames
8a-noon: Law
noon-4p: Hofler
No Beam No Beam No Beam
Scientist #2 No Beam 8a-noon: Law
noon-4p: Hofler
7a-9a: Bruker
9a-noon: Wang
noon-4p: Hofler
8a-noon: Wang
noon-4p: Kazimi
No Beam No Beam No Beam
Ops Inj Support No Beam Forman Forman Forman No Beam No Beam No Beam
SSO / AM Sweeper No Beam Gauthier / Forman Gauthier / Forman Gauthier / Forman No Beam No Beam No Beam
Other MCC Work, Group, +Persons in MCC 1230-230p: JLab Video Tour Filming w/Satogata
(Satogata, Robbins, Camera Guy)
SWING Shift 5/31 🇺🇸 6/1 6/2 6/3 6/4 6/5 6/6
Beam Commissioning Plan / ATLis PSS Certification PSS Certification PSS Certification Disconnects for 0I02 Harp
PSS Certification
PSS Certification No Beam No Beam
Shift Leader PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification No Beam No Beam
Scientist #2 PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification No Beam No Beam
Ops Inj Support PSS Certification PSS Certification PSS Certification PSS Certification PSS Certification No Beam No Beam
SSO | PSS TD Aiken Aiken Aiken Aiken Aiken No Beam No Beam
Other MCC Work, Group, +Persons in MCC SSG SSG SSG SSG SSG
CCOC / PD Carlino / Frierson Carlino / Frierson Carlino / Merz Carlino / Merz Carlino / Merz Carlino / Merz Carlino / Merz

Week 3, June 7th-13th

  • 6/7 - 6/11: CEBAF PSS Certifications Week 3/3
  • Days and Swings running 6/11,12,13. No Owls.
DAY Shift Thursday
6/10
Friday
6/11
Sat
6/12
Sun
6/13
Notes/Goals
Beam Commissioning
Plan (ATLis)
PSS Kicker Certification (22061) 10a: PSS Kicker (22061) and Laser Certs
12p: CW to FC1 Setup (22182)
CW to FC1 Setup (22182) noon lock-up
CW to FC1 Setup (22182)

High current
CW setup
to FC1,
Choppers
Off.
Shift Leader Wang Wang Wang noon: Kazimi
Scientist #2 Bruker Law Bruker noon: Bruker
Ops Inj Support CC: Forman CC: Forman CC: Forman CC: Forman
SSO / AM Sweeper Garcia / SSG Garcia / Forman Gauthier / Forman Gauthier / Forman
Other MCC Work, Group, +Persons in MCC SSG SSG
SWING Shift 6/10 6/11 6/12 6/13
Beam Commissioning
Plan (ATLis)
PSS Functional Tests Prebuncher, Buncher Characterization (22190)
(float PSS Functional Tests)
Prebuncher, Buncher Characterization (22190) PCup vs HVPS Calibration (22080)
High-current CW evaluation
Shift Leader No Beam Kazimi Kazimi Grames
Scientist #2 No Beam Hofler Hofler
Ops Inj Support No Beam
SSO PSS TD: Aiken Anthony Mock Mock
Other MCC Work, Group, +Persons in MCC SSG SSG
CCOC / PD Moser / Merz Moser / Merz Moser / Merz Moser / Merz

Week 4, June 14th-20th

  • 6/18-20 Weekend -- 500keV limited
    • PSS kicker workaround to be reviewed by SCMB


  • tentative
OWL Shift Monday
6/14
Tuesday
6/15
Wednesday
6/16
Thursday
6/17
Friday
6/18
Saturday
6/19
Sunday
6/20
Notes/Goals
Beam Commissioning
Plan (ATLis)
No Beam AutoSteer Knobs (22441) AutoSteer Knobs (22441) AutoSteer Knobs (22441) AutoSteer Knobs (22441) AutoSteer Knobs (22441) AutoSteer Knobs (22441) Orbit vs Wien
HVPS-Off Config

0I02 YAG
Emittance
Measurement

AutoSteer Knobs -
Wien, further?

Wien EvB Cal

ToF vs Wien θ

Early Injector
setup training

Parity DAQ
Checkout
Shift Leader No Beam Law Law Law Law Law Law
Scientist #2 No Beam
Crew Chief No Beam Law Law Law Law Law Law
SSO No Beam Deir Deir Deir Deir Garcia Garcia
DAY Shift 6/14 6/15 6/16 6/17 6/18 6/19 6/20
Beam Commissioning
Plan (ATLis)
AM: Inj Open for Repairs --
2I BPMs, A-slit, Prebuncher, PSS Kicker?

PM: Orbit vs Wien HV Config
(PS {disabled, off, disconnected})
Wien E/B Calibration (22084) ToF vs Wien Angle (22330)
/or\
Further Wien Studies (E/B Cal (22084), orbit deflection, XY-coupling)
InjSteering Script Testing (22441) FC1 High Current Setup (22182) 8A-noon: MWF Noise Measurements vs Wien Angle Setting (22500)
noon+: FC1 High Current Setup (22182)
FC1 High Current Setup (22182)
Shift Leader PM: Suleiman Suleiman
Hofler
Poelker Hofler Wang 8A-noon: Suleiman
noon+: Wang
Wang
Scientist #2 PM: Hernandez-Garcia, Kazimi Bruker, Mamun Bruker Joyce
Crew Chief Carlino Richardson Richardson Richardson Frierson Frierson Frierson
SSO Gauthier Anthony Anthony Gauthier Gauthier Gauthier Gauthier
SWING Shift 6/14 6/15 6/16 6/17 6/18 6/19 6/20
Beam Commissioning
Plan (ATLis)
0I02 Yag Emittance Measurement (22590) PQB BPM Calibration Run to FC1 High Current (100uA) CW to FC1 w/Choppers (22182, 22190) PSS Functional Tests
No Beam
FC1 High Current Setup (22182)
AutoSteer Knobs (22441)
FC1 High Current Setup (22182)
AutoSteer Knobs (22441)
4P-8P: Spot Move Tests (22184)
8P+: AutoSteer Knobs (22441)
Shift Leader Turner Amali, Caryn (remote) Wang Wang
Law
Wang
Law
4P-8P: Grames
Law
Scientist #2 Mamun Grames Kazimi
Crew Chief McCaughan McCaughan McCaughan Moser Moser Moser Moser
SSO Mock Mock Mock Mock Mock Anthony Anthony

Week 5, June 21st-27th

  • SCMB reviewing proposal to run without PSS Kicker
    • 500keV-limited (i.e. 1D/FC1) until SCMB approval
    • Monday Swing, may be able to run to FC2
    • ILD running contingent on SCMB approval and HCO completion


DAY Shift Monday
6/21
Tuesday
6/22
Wednesday
6/23
Thursday
6/24
Friday
6/25
Sat
6/26
Sun
6/27
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/21 6/22 6/23 6/24 6/25 6/26 6/27
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD Moser / Carlino Moser / Carlino TBD / Carlino TBD / Carlino TBD / Carlino TBD / Carlino TBD / Carlino

Week 6, June 28th-July 4th

FC#2 running possible. 24/7 running possible.

DAY Shift Monday
6/28
Tuesday
6/29
Wednesday
6/30
Thursday
7/1
Friday
7/2
Sat
7/3
Sun
7/4
Notes/Goals
Beam Commissioning
Plan (ATLis)
TBD TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO / AM Sweeper TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
SWING Shift 6/28 6/29 6/30 7/1 7/2 7/3 7/4
Beam Commissioning Plan / ATLis TBD TBD TBD TBD TBD TBD TBD
Shift Leader
Scientist #2
Ops Inj Support TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law} TBD: {Moser, Forman, Law}
SSO TBD TBD TBD TBD TBD
Other MCC Work, Group, +Persons in MCC
CCOC / PD TBD / Carlino TBD / Carlino TBD / TBD TBD / TBD TBD / TBD TBD / TBD TBD / TBD

Week 7, July 5th-July 11th

Week 8, July 12th-July 16th


High-Level View June 7th-July16th

updated 6/9

The below image shows furthest possible Injector beam destination on a given shift from 6/7 to 7/16. Friday 7/16 is the current forecasted date for pulling the inline dump and beginning CEBAF beam restoration for the 2021 Physics Run.


Screenshot from 2021-06-09 18-34-37.png