Difference between revisions of "Phase 2"
Jump to navigation
Jump to search
(14 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
− | == | + | ==Zoom Links== |
− | * | + | * Daily 8:00am + Wed 1:30 MCC => https://jlab-org.zoomgov.com/j/1601304841?pwd=Z1RIOVVUdkdXL2R2LzREZUNOUlh1dz09 |
− | * [[ | + | * Daily 8:30am (or when 8am ends) Injector Toolbox meeting => https://jlab-org.zoomgov.com/j/1605740081?pwd=ZWxFREIyVmFtbW04VGZ4M1Jia3JrZz09&from=addon |
+ | ** [[Running Daily Phase 2 Minutes]] | ||
− | == | + | == Main Areas == |
− | :[[ | + | |
− | :[[ | + | : [[200 kV Polarized Gun]] |
− | : [[ | + | : [[SRF Booster]] |
+ | : [[Phase 2 info just at end of Phase 1]] | ||
== Beam Commissioning ATLIS Jobs == | == Beam Commissioning ATLIS Jobs == | ||
+ | * Viewer perspectives (6/21/21) here => [https://wiki.jlab.org/ciswiki/index.php/Beamline_viewers 3d CAD images of the viewers] | ||
* (Max) Test IHA0I02 after SAD - https://tasklists.jlab.org/bslist/tasks/108546 | * (Max) Test IHA0I02 after SAD - https://tasklists.jlab.org/bslist/tasks/108546 | ||
* (Max) 200 kV gun optics and 2I steering - https://tasklists.jlab.org/bslist/tasks/108544 | * (Max) 200 kV gun optics and 2I steering - https://tasklists.jlab.org/bslist/tasks/108544 |
Revision as of 10:40, 10 March 2023
Zoom Links
- Daily 8:00am + Wed 1:30 MCC => https://jlab-org.zoomgov.com/j/1601304841?pwd=Z1RIOVVUdkdXL2R2LzREZUNOUlh1dz09
- Daily 8:30am (or when 8am ends) Injector Toolbox meeting => https://jlab-org.zoomgov.com/j/1605740081?pwd=ZWxFREIyVmFtbW04VGZ4M1Jia3JrZz09&from=addon
Main Areas
Beam Commissioning ATLIS Jobs
- Viewer perspectives (6/21/21) here => 3d CAD images of the viewers
- (Max) Test IHA0I02 after SAD - https://tasklists.jlab.org/bslist/tasks/108546
- (Max) 200 kV gun optics and 2I steering - https://tasklists.jlab.org/bslist/tasks/108544
- (Max & Dennis) 200 keV Wien filter optics
- (Riad) Wien E/B and spin calibrations