Difference between revisions of "Phase 2"
Jump to navigation
Jump to search
(Created page with " == Major Phase 2 Beamline Components == :SRF Booster") |
|||
(17 intermediate revisions by 2 users not shown) | |||
Line 1: | Line 1: | ||
+ | == Recent Updates == | ||
+ | * | ||
+ | |||
+ | ==Planning, planning, planning...== | ||
+ | * [[AIPINJ - Phase 2 Upgrade Meetings]] | ||
+ | * [[AIPINJ - Phase 2 Layouts]] | ||
== Major Phase 2 Beamline Components == | == Major Phase 2 Beamline Components == | ||
:[[SRF Booster]] | :[[SRF Booster]] | ||
+ | :[[media:parts list old and new phase2 beamline.xls]] | ||
+ | |||
+ | ==FY22 SAD ATLIS Tasks== | ||
+ | === Vent VBV0I02 - VBV0I07 (Marcy, Phil)=== | ||
+ | * Monitor vacuum through QCM | ||
+ | * Remake leaky A2 gaskets | ||
+ | * Remove top-hat from IYG0I02 (make sure YAG is good, spare on-hand?) | ||
+ | * Install IHA0I02, test before pumpdown, before bakeout | ||
+ | |||
+ | === Vent Mott chamber (Marcy, Phil, Scott) === | ||
+ | * Remove diamond ladder | ||
+ | * Install/align gold ladder | ||
+ | * Restore old controls | ||
+ | * Long pump down | ||
+ | |||
+ | === Beam Tests === | ||
+ | * (Shukui, Joe, Tomasz, Reza) Install, test and compare mode-locked vs. gain-switched fiber lasers (bleedthrough, injector setup, operation) | ||
+ | * (Dennis, Ken?, Alicia?) Use harp to study Wien optics and test match | ||
+ | * (Dennis) Evaluate optics of new 15 deg DM dipole vs. existing DS dipole | ||
+ | * (Max) Use BPM, Harp/lens to quantify beam deflection & Twiss vs. laser spot location | ||
+ | * (Riad, Sarin) Use BPM's and Wiens to test different/new PS to suppress line noise | ||
+ | * (Gabriel, Carlos) Do you need data for Wien paper? | ||
+ | * (Jerry, Joe) Test 200 keV PSS kicker magnet | ||
+ | * (Yan) Evaluate QCM |
Revision as of 09:37, 3 November 2021
Recent Updates
Planning, planning, planning...
Major Phase 2 Beamline Components
FY22 SAD ATLIS Tasks
Vent VBV0I02 - VBV0I07 (Marcy, Phil)
- Monitor vacuum through QCM
- Remake leaky A2 gaskets
- Remove top-hat from IYG0I02 (make sure YAG is good, spare on-hand?)
- Install IHA0I02, test before pumpdown, before bakeout
Vent Mott chamber (Marcy, Phil, Scott)
- Remove diamond ladder
- Install/align gold ladder
- Restore old controls
- Long pump down
Beam Tests
- (Shukui, Joe, Tomasz, Reza) Install, test and compare mode-locked vs. gain-switched fiber lasers (bleedthrough, injector setup, operation)
- (Dennis, Ken?, Alicia?) Use harp to study Wien optics and test match
- (Dennis) Evaluate optics of new 15 deg DM dipole vs. existing DS dipole
- (Max) Use BPM, Harp/lens to quantify beam deflection & Twiss vs. laser spot location
- (Riad, Sarin) Use BPM's and Wiens to test different/new PS to suppress line noise
- (Gabriel, Carlos) Do you need data for Wien paper?
- (Jerry, Joe) Test 200 keV PSS kicker magnet
- (Yan) Evaluate QCM