==Planning, planning, planning...==
 
==Planning, planning, planning...==
: [[AIPINJ - Phase 2 Upgrade Meetings]]
+
* [[AIPINJ - Phase 2 Upgrade Meetings]]
 +
* [[AIPINJ - Phase 2 Layouts]]
  
 
== Major Phase 2 Beamline Components ==
 
== Major Phase 2 Beamline Components ==
:
+
:[[SRF Booster]]
 
+
:[[media:parts list old and new phase2 beamline.xls]]
 
 
==ATLIS Tasks==
 
 
 
 
 
;CIS SAD Tasks
 
*
 
 
 
  
;Injector Related SAD Tasks
+
==FY22 SAD ATLIS Tasks==
 +
=== Vent VBV0I02 - VBV0I07 (Marcy, Phil)===
 +
* Monitor vacuum through QCM
 +
* Remake leaky A2 gaskets
 +
* Remove top-hat from IYG0I02 (make sure YAG is good, spare on-hand?)
 +
* Install IHA0I02, test before pumpdown, before bakeout
  
 +
=== Vent Mott chamber (Marcy, Phil, Scott) ===
 +
* Remove diamond ladder
 +
* Install/align gold ladder
 +
* Restore old controls
 +
* Long pump down
  
== Major Phase 2 Beamline Components ==
+
=== Beam Tests ===
:[[SRF Booster]]
+
* (Shukui, Joe, Tomasz, Reza) Install, test and compare mode-locked vs. gain-switched fiber lasers  (bleedthrough, injector setup, operation)
 +
* (Dennis, Ken?, Alicia?) Use harp to study Wien optics and test match
 +
* (Dennis) Evaluate optics of new 15 deg DM dipole vs. existing DS dipole
 +
* (Max) Use BPM, Harp/lens to quantify beam deflection & Twiss vs. laser spot location
 +
* (Riad, Sarin) Use BPM's and Wiens to test different/new PS to suppress line noise
 +
* (Gabriel, Carlos) Do you need data for Wien paper?
 +
* (Jerry, Joe) Test 200 keV PSS kicker magnet
 +
* (Yan) Evaluate QCM

Revision as of 09:37, 3 November 2021

Recent Updates

Planning, planning, planning...

Major Phase 2 Beamline Components

SRF Booster
media:parts list old and new phase2 beamline.xls

FY22 SAD ATLIS Tasks

Vent VBV0I02 - VBV0I07 (Marcy, Phil)

  • Monitor vacuum through QCM
  • Remake leaky A2 gaskets
  • Remove top-hat from IYG0I02 (make sure YAG is good, spare on-hand?)
  • Install IHA0I02, test before pumpdown, before bakeout

Vent Mott chamber (Marcy, Phil, Scott)

  • Remove diamond ladder
  • Install/align gold ladder
  • Restore old controls
  • Long pump down

Beam Tests

  • (Shukui, Joe, Tomasz, Reza) Install, test and compare mode-locked vs. gain-switched fiber lasers (bleedthrough, injector setup, operation)
  • (Dennis, Ken?, Alicia?) Use harp to study Wien optics and test match
  • (Dennis) Evaluate optics of new 15 deg DM dipole vs. existing DS dipole
  • (Max) Use BPM, Harp/lens to quantify beam deflection & Twiss vs. laser spot location
  • (Riad, Sarin) Use BPM's and Wiens to test different/new PS to suppress line noise
  • (Gabriel, Carlos) Do you need data for Wien paper?
  • (Jerry, Joe) Test 200 keV PSS kicker magnet
  • (Yan) Evaluate QCM