== Recent Updates ==
 
 
*
 
 
 
==Planning, planning, planning...==
 
==Planning, planning, planning...==
 
* [[AIPINJ - Phase 2 Upgrade Meetings]]
 
* [[AIPINJ - Phase 2 Upgrade Meetings]]
Line 10: Line 6:
 
:[[SRF Booster]]
 
:[[SRF Booster]]
 
:[[media:parts list old and new phase2 beamline.xls]]
 
:[[media:parts list old and new phase2 beamline.xls]]
 
==2022 Winter SAD ATLIS Tasks==
 
;Phase 1 Region
 
* 200 kV gun => building a second 18" gun appropriate for CEBAF, to condition to 300 kV, and operate at 200 kV
 
* (Lakshmi) Replace DR dipole =>  PO written week of Aug 30 for new DM at CEBAF, UITF and 2 spare coils
 
* (Sarin/Riad) Replace noisy Wien 20A SCE =>
 
* (Phil) Repair leaky PCUP LCW fitting => labor, no M&S
 
* (Marcy) Remake A2 joint => labor, no M&S
 
* (Marcy) Replace harp => labor, no M&S
 
* (Jerry) Install & test 200 kV kicker => waiting for Jerry's reply
 
 
;Phase 2 Region
 
* (Matt) Possibly install solenoid/valve downstream of chopper => MMF mapping solenoids in Sep.  Do we have 2-3/4" pneumatic beam line valve?
 
* (FM) Install bright lighting => Walked area with FM.  Waiting for follow-up.
 
 
;Beam Studies
 
* Test mode-locked fiber laser @ CEBAF
 
 
;Other
 
* Reinstall Mott target ladder w/ gold targets
 
 
===Other===
 
* Test mode-locked laser
 
* Return gold target ladder, w/ larger nipple, original STAC5
 
* Store tunnel HV cables nicely, like we do now at UITF
 