Difference between revisions of "Phase 2"

From Ciswikidb
Jump to navigation Jump to search
(8 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Recent Updates ==
 
 
*
 
 
 
==Planning, planning, planning...==
 
==Planning, planning, planning...==
 
* [[AIPINJ - Phase 2 Upgrade Meetings]]
 
* [[AIPINJ - Phase 2 Upgrade Meetings]]
Line 10: Line 6:
 
:[[SRF Booster]]
 
:[[SRF Booster]]
 
:[[media:parts list old and new phase2 beamline.xls]]
 
:[[media:parts list old and new phase2 beamline.xls]]
 
==FY22 SAD ATLIS Tasks==
 
=== Vent VBV0I02 - VBV0I07 (Marcy, Phil)===
 
* Monitor vacuum through QCM
 
* Remake leaky A2 gaskets
 
* Remove top-hat from IYG0I02 (make sure YAG is good, spare on-hand?)
 
* Install IHA0I02, test before pumpdown, before bakeout
 
 
=== Vent Mott chamber (Marcy, Phil, Scott) ===
 
* Remove diamond ladder
 
* Install/align gold ladder
 
* Restore old controls
 
* Long pump down
 
 
=== Beam Tests ===
 
* (Shukui, Joe, Tomasz, Reza) Install, test and compare mode-locked vs. gain-switched fiber lasers  (bleedthrough, injector setup, operation)
 
* (Dennis, Ken?, Alicia?) Use harp to study Wien optics and test match
 
* (Dennis) Evaluate optics of new 15 deg DM dipole vs. existing DS dipole
 
* (Max) Use BPM, Harp/lens to quantify beam deflection & Twiss vs. laser spot location
 
* (Riad, Sarin) Use BPM's and Wiens to test different/new PS to suppress line noise
 
* (Gabriel, Carlos) Do you need data for Wien paper?
 
* (Jerry, Joe) Test 200 keV PSS kicker magnet
 
* (Yan) Evaluate QCM
 

Revision as of 10:23, 12 January 2022