− | == Recent Updates ==
| |
− |
| |
− | *
| |
− |
| |
| ==Planning, planning, planning...== | | ==Planning, planning, planning...== |
| * [[AIPINJ - Phase 2 Upgrade Meetings]] | | * [[AIPINJ - Phase 2 Upgrade Meetings]] |
Line 10: |
Line 6: |
| :[[SRF Booster]] | | :[[SRF Booster]] |
| :[[media:parts list old and new phase2 beamline.xls]] | | :[[media:parts list old and new phase2 beamline.xls]] |
− |
| |
− | ==FY22 SAD ATLIS Tasks==
| |
− |
| |
− | ===Schedule===
| |
− | * CEBAF SAD runs from Feb 8 - Jun 8 (about 4 months) [[media:210112_SAD_timeline.pdf]]
| |
− | * Jason Willoughby is installing bright white task lighting w/ wall dimmer from laser hut to fc#2
| |
− | * Install group may remove 5D line in prep for Phase 2 https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22161
| |
− | * Tunnel jobs during first ~month of SAD
| |
− | :: Tomasz is upgrading RF
| |
− | :: CIS has two major vacuum jobs
| |
− | * Beam base jobs follow, accomodating PSS
| |
− |
| |
− | === Vent VBV0I02 - VBV0I07 ===
| |
− | * Marcy write ATLIS
| |
− | * Coordinate groups to remove/stow items
| |
− | * Coordinate with SRF before venting
| |
− | * Dry run the entire sequence of jobs
| |
− | * Prep all the parts for vacuum job in tunnel
| |
− | * Vent through QCM
| |
− | * Work w/ S&A to remake A2 gasket
| |
− | * Rework IYG0I02, remove top-hat, align YAG screen per Dennis
| |
− | * Work with S&A to align YAG screen
| |
− | * Work with S&A to install, align IHA0I02
| |
− | * Check viewer and harp before and after pump down, repeatedly, carefully
| |
− | * Pump down and leak check
| |
− |
| |
− | === Vent Mott chamber ===
| |
− | * Joe write ATLIS
| |
− | * Coordinate with S&A to check gold ladder fiducials
| |
− | * Coordinate with Scott to disconnect diamond ladder controls
| |
− | * Dry run the entire sequence in tunnel
| |
− | * Prep all the parts before venting
| |
− | * Vent chamber slowly for existing gold target
| |
− | * Remove diamond ladder
| |
− | * Rebuild lower section of Mott (tube + window)
| |
− | * Last step install and align gold ladder
| |
− | * Slow pump down, check motion controls of ladder, leak check
| |
− | * Long pump down
| |
− |
| |
− | === Beam Based Tests ===
| |
− | * (Shukui, Joe, Tomasz, Reza) Install and test mode locked fiber laser https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22830
| |
− | * (Dennis, Ken, Alicia) Use harp to study Wien optics and test match
| |
− | * (Dennis) Evaluate optics of Lakshmi's new 15 deg DM dipole vs. existing DS dipole
| |
− | * (Max) Use BPM, Harp/lens to quantify beam deflection & Twiss vs. laser spot location
| |
− | * (Riad, Sarin) Use BPM's and Wiens to test different/new PS to suppress line noise
| |
− | * (Gabriel, Carlos) Do you need data for Wien paper?
| |
− | * (Jerry, Joe) Test 200 keV PSS kicker magnet https://opsweb.acc.jlab.org/CSUEApps/atlis/task/22061
| |
− | * (Yan) Evaluate QCM
| |