− | == Recent Updates ==
| |
− |
| |
− | *
| |
− |
| |
| ==Planning, planning, planning...== | | ==Planning, planning, planning...== |
| * [[AIPINJ - Phase 2 Upgrade Meetings]] | | * [[AIPINJ - Phase 2 Upgrade Meetings]] |
Line 10: |
Line 6: |
| :[[SRF Booster]] | | :[[SRF Booster]] |
| :[[media:parts list old and new phase2 beamline.xls]] | | :[[media:parts list old and new phase2 beamline.xls]] |
− |
| |
− | ==2022 Winter SAD ATLIS Tasks==
| |
− | ;
| |
− | Phase 1 Region
| |
− | * (~everyone) Install 200 kV w/o field emission
| |
− | * (Lakshmi) Replace DR dipole => PO written week of Aug 30 for new DM at CEBAF, UITF and 2 spare coils
| |
− | * (Sarin/Riad) Replace noisy Wien 20A SCE =>
| |
− | * (Phil) Repair leaky PCUP LCW fitting
| |
− | * (Marcy) Remake A2 joint
| |
− | * (Marcy) Replace harp
| |
− | * (Jerry) Install & test 200 kV kicker
| |
− |
| |
− | ;Phase 2 Region
| |
− | * (Matt) Possibly install solenoid/valve downstream of chopper => MMF mapping solenoids in Sep. Do we have 2-3/4" pneumatic beam line valve?
| |
− | * (FM) Install bright lighting => Walked area with FM. Waiting for follow-up.
| |
− |
| |
− | ===Other===
| |
− | * Test mode-locked laser
| |
− | * Return gold target ladder, w/ larger nipple, original STAC5
| |
− | * Store tunnel HV cables nicely, like we do now at UITF
| |