==ATLIS Tasks== | ==ATLIS Tasks== | ||
− | * Install | + | * Install harp |
+ | * Re-make A2 joint | ||
+ | * Take advantage to install new valve downstream chopper? | ||
* Replace both Wien 20A SCE with lower noise power supplies | * Replace both Wien 20A SCE with lower noise power supplies | ||
− | * Install | + | * Install Lakshmi's DR dipole |
− | * | + | * Return gold target ladder, w/ larger nipple, original STAC5 |
− | * | + | * Install gun which reaches 200 kV reliably w/o field emission |
* Requested to Steve brighter lights from laser room to gate (like we have by gun) | * Requested to Steve brighter lights from laser room to gate (like we have by gun) |
Revision as of 06:55, 18 August 2021
Contents
Recent Updates
Planning, planning, planning...
Major Phase 2 Beamline Components
ATLIS Tasks
- Install harp
- Re-make A2 joint
- Take advantage to install new valve downstream chopper?
- Replace both Wien 20A SCE with lower noise power supplies
- Install Lakshmi's DR dipole
- Return gold target ladder, w/ larger nipple, original STAC5
- Install gun which reaches 200 kV reliably w/o field emission
- Requested to Steve brighter lights from laser room to gate (like we have by gun)