Difference between revisions of "Robust Meeting - Nov 19, 2020"

From Ciswikidb
Jump to navigation Jump to search
Line 4: Line 4:
  
 
;Can we be ready for a Feb 1 to Mar 15 install period?
 
;Can we be ready for a Feb 1 to Mar 15 install period?
#The photocathode lifetime at UITF is REALLY bad, the field emission at 200 kV certainly doesn’t help (is it the sole problem?).  So take apart gun polish electrode, krypton process until there’s NO field emission  
+
#(Carlos) The photocathode lifetime at UITF is REALLY bad, the field emission at 200 kV certainly doesn’t help (is it the sole problem?).  So take apart gun polish electrode, krypton process until there’s NO field emission  
#Align the gun so that the cathode AND the anode are at normal incidence relative to the beamline and trajectory  
+
#(Carlos) Align the gun so that the cathode AND the anode are at normal incidence relative to the beamline and trajectory  
#Align the rest of the beamline  
+
#(Joe) Align the rest of the beamline  
#Fix the chopper slit  
+
#(What is wrong?) Fix the chopper slit  
#setup the chopper phases  
+
#(Matt, can you schedule this after Run3, a day?) setup the chopper phases  
#Replace the ion pump at the chopper chamber  
+
#(Marcy, find or buy the pump) Replace the ion pump at the chopper chamber  
#Add load lock to depo chamber  
+
#(Matt???, or Marcy) Add load lock to depo chamber  
#Modify depo chamber to include new chemical sources  
+
#(Mamun, what's the plan??) Modify depo chamber to include new chemical sources  
#Attempt to better align the mask  
+
#(Attempt to better align the mask  
#Add the polarimeter  
+
#(Joe/Riad) Add the polarimeter  
#A3 is in the wrong place, at least in terms of protecting the booster  
+
#(???) A3 is in the wrong place, at least in terms of protecting the booster  
 
#Beam appears far right at ITVK203A, beam appears far left at ITVK401, maybe the alignment of the beamline will help?  
 
#Beam appears far right at ITVK203A, beam appears far left at ITVK401, maybe the alignment of the beamline will help?  
#Install vertical Wien
+
#(Joe/Carlos) Install vertical Wien

Revision as of 17:38, 11 November 2020

Meeting Info
Can we be ready for a Feb 1 to Mar 15 install period?
  1. (Carlos) The photocathode lifetime at UITF is REALLY bad, the field emission at 200 kV certainly doesn’t help (is it the sole problem?). So take apart gun polish electrode, krypton process until there’s NO field emission
  2. (Carlos) Align the gun so that the cathode AND the anode are at normal incidence relative to the beamline and trajectory
  3. (Joe) Align the rest of the beamline
  4. (What is wrong?) Fix the chopper slit
  5. (Matt, can you schedule this after Run3, a day?) setup the chopper phases
  6. (Marcy, find or buy the pump) Replace the ion pump at the chopper chamber
  7. (Matt???, or Marcy) Add load lock to depo chamber
  8. (Mamun, what's the plan??) Modify depo chamber to include new chemical sources
  9. (Attempt to better align the mask
  10. (Joe/Riad) Add the polarimeter
  11. (???) A3 is in the wrong place, at least in terms of protecting the booster
  12. Beam appears far right at ITVK203A, beam appears far left at ITVK401, maybe the alignment of the beamline will help?
  13. (Joe/Carlos) Install vertical Wien