* Install 200 kV w/o field emission | * Install 200 kV w/o field emission | ||
* Replace DR dipole => PO written week of Aug 30 for new DM at CEBAF, UITF and 2 spare coils | * Replace DR dipole => PO written week of Aug 30 for new DM at CEBAF, UITF and 2 spare coils | ||
− | * Replace noisy Wien 20A SCE | + | * Replace noisy Wien 20A SCE => |
* Repair leaky PCUP LCW fitting | * Repair leaky PCUP LCW fitting | ||
* Remake A2 joint | * Remake A2 joint | ||
* Replace harp | * Replace harp | ||
− | * Install & 200 kV kicker | + | * Install & test 200 kV kicker |
;Phase 2 Region | ;Phase 2 Region |
Revision as of 08:56, 7 September 2021
2022 Winter SAD ATLIS Tasks
Phase 1 Region
- Install 200 kV w/o field emission
- Replace DR dipole => PO written week of Aug 30 for new DM at CEBAF, UITF and 2 spare coils
- Replace noisy Wien 20A SCE =>
- Repair leaky PCUP LCW fitting
- Remake A2 joint
- Replace harp
- Install & test 200 kV kicker
- Phase 2 Region
- Possibly install solenoid/valve downstream of chopper => MMF mapping solenoids in Sep. Do we have 2-3/4" pneumatic beam line valve?
- Install bright lighting => Walked area with FM. Waiting for follow-up.
CEBAF 200 kV Gun
- Carlos - Status of small gun HV limits, CEBAF and UITF
- Carlos - GTS gun HV design, i.e. reaching >200 kV w/o field emission
- Gabriel - Picking the anode to eliminate kick