;Phase 2 Region
 
;Phase 2 Region
* Possibly install solenoid/valve downstream of chopper
+
* Possibly install solenoid/valve downstream of chopper => MMF mapping solenoids in Sep.  Do we have 2-3/4" pneumatic beam line valve?
:: => MMF making solenoid
+
* Install bright lighting => Walked area with FM. Waiting for follow-up.
:: => valve in-hand ?
 
* Requested to Steve brighter lights from laser room to gate (like we have by gun)
 
 
 
List of jobs https://wiki.jlab.org/ciswiki/index.php/Phase_2
 
  
 
===CEBAF 200 kV Gun===
 
===CEBAF 200 kV Gun===

Revision as of 08:55, 7 September 2021

2022 Winter SAD ATLIS Tasks

Phase 1 Region

  • Install 200 kV w/o field emission
  • Replace DR dipole => PO for DR written week of Aug 30
  • Replace noisy Wien 20A SCE
  • Repair leaky PCUP LCW fitting
  • Remake A2 joint
  • Replace harp
  • Install & 200 kV kicker
Phase 2 Region
  • Possibly install solenoid/valve downstream of chopper => MMF mapping solenoids in Sep. Do we have 2-3/4" pneumatic beam line valve?
  • Install bright lighting => Walked area with FM. Waiting for follow-up.

CEBAF 200 kV Gun

  • Carlos - Status of small gun HV limits, CEBAF and UITF
  • Carlos - GTS gun HV design, i.e. reaching >200 kV w/o field emission
  • Gabriel - Picking the anode to eliminate kick