Sep 08, 2021 - Group Meeting

From Ciswikidb
Revision as of 09:07, 8 September 2021 by Chgarcia (talk | contribs)
Jump to navigation Jump to search

2022 Winter SAD ATLIS Tasks

Phase 1 Region

  • Install 200 kV w/o field emission
  • Replace DR dipole => PO written week of Aug 30 for new DM at CEBAF, UITF and 2 spare coils
  • Replace noisy Wien 20A SCE =>
  • Repair leaky PCUP LCW fitting
  • Remake A2 joint
  • Replace harp
  • Install & test 200 kV kicker
Phase 2 Region
  • Possibly install solenoid/valve downstream of chopper => MMF mapping solenoids in Sep. Do we have 2-3/4" pneumatic beam line valve?
  • Install bright lighting => Walked area with FM. Waiting for follow-up.

CEBAF 200 kV Gun

  • Carlos - Status of small gun HV limits, CEBAF and UITF
  • Carlos - GTS gun HV design, i.e. reaching >200 kV w/o field emission
  • Gabriel - Picking the anode to eliminate kick
https://wiki.jlab.org/ciswiki/index.php/18%22_Photogun_ala_GTS